59 resultados para contingent work


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Tax Credits Contingent Liabilities Report was created by the Tax Research and Program Analysis Section of the Iowa Department of Revenue (IDR) for the benefit of the Revenue Estimating Conference (REC). This report is part of the Tax Credits Tracking and Analysis Program. The goal of the program is to provide a repository for information concerning the awarding, usage, and effectiveness of tax credits. This report forecasts tax credit claims assuming that all available awarded credits are issued and then, along with forecasted credits, are subsequently claimed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Tax Credits Contingent Liabilities Report was created by the Tax Research and Program Analysis Section of the Iowa Department of Revenue (IDR) for the benefit of the Revenue Estimating Conference (REC). This report is part of the Tax Credits Tracking and Analysis Program. The goal of the program is to provide a repository for information concerning the awarding, usage, and effectiveness of tax credits. This report forecasts tax credit claims assuming that all available awarded credits are issued and then, along with forecasted credits, are subsequently claimed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Tax Credits Contingent Liabilities Report was created by the Tax Research and Program Analysis Section of the Iowa Department of Revenue (IDR) for the benefit of the Revenue Estimating Conference (REC). This report is part of the Tax Credits Tracking and Analysis Program. The goal of the program is to provide a repository for information concerning the awarding, usage, and effectiveness of tax credits. This report forecasts tax credit claims assuming that all available awarded credits are issued and then, along with forecasted credits, are subsequently claimed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Centrally located in America’s upper Midwest, Iowa lies in the heart of a 12-state region that will have installed an average of 2,701 mfi per year through 2014. In 2009 alone, this region, which is within one day delivery from Iowa, installed turbines valued at $7.8 billion! Once you understand how this exploding growth in the market intersects with the supply chain established by over 250 Iowa companies that are already providing components and services to wind energy manufacturers, you have an outstanding picture of exactly why all major wind manufacturing components are made in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This book, by Marcus L. Hansen, supplements a previously written book by him called Welfare Campaigns in Iowa. It details accounts of particular groups or organizations in Iowa that were active in welfare campaigns or work during World War I.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction zones pose a significant threat to both workers and drivers causing numerous injuries and deaths each year. Innovations in work zone safety could reduce these numbers. However, implementing work zone interventions before they are validated can undermine rather than enhance safety. The objective of this research is to demonstrate how driving simulators can be used to evaluate the effect of various work zone interventions on driver performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A previous study sponsored by the Smart Work Zone Deployment Initiative, “Feasibility of Visualization and Simulation Applications to Improve Work Zone Safety and Mobility,” demonstrated the feasibility of combining readily available, inexpensive software programs, such as SketchUp and Google Earth, with standard two-dimensional civil engineering design programs, such as MicroStation, to create animations of construction work zones. The animations reflect changes in work zone configurations as the project progresses, representing an opportunity to visually present complex information to drivers, construction workers, agency personnel, and the general public. The purpose of this study is to continue the work from the previous study to determine the added value and resource demands created by including more complex data, specifically traffic volume, movement, and vehicle type. This report describes the changes that were made to the simulation, including incorporating additional data and converting the simulation from a desktop application to a web application.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The value of driving We as Americans - and especially as Iowans - value the independence of getting around in our own vehicles and staying connected with our families and communities. The majority of older Iowans enjoy a more active, healthy and longer life than previous generations. Freedom of mobility shapes our quality of life. With aging, driving becomes an increasing concern for older Iowans and their families. How we deal with changes in our driving ability and, eventually, choose when and how to retire from driving, will affect our safety and our quality of life.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: Work-at-Home Scams: Money for Nothing

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: So You Didn’t Order That? Protecting yourself from unauthorized credit card charges

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this project was to promote and facilitate analysis and evaluation of the impacts of road construction activities in Smart Work Zone Deployment Initiative (SWZDI) states. The two primary objectives of this project were to assess urban freeway work-zone impacts through use of remote monitoring devices, such as radar-based traffic sensors, traffic cameras, and traffic signal loop detectors, and evaluate the effectiveness of using these devices for such a purpose. Two high-volume suburban freeway work zones, located on Interstate 35/80 (I-35/I-80) through the Des Moines, Iowa metropolitan area, were evaluated at the request of the Iowa Department of Transportation (DOT).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recognize facilities that provide quality of life and appropriate access to medical assistance program beneficiaries in a cost-effective manner. Each measure is intended to represent nursing facility characteristics in each of the four domains.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Ramp metering has been successfully implemented in many states to improve traffic operations on freeways. Studies have documented the positive mobility and safety benefits of ramp metering. However, there have been no studies on the use of ramp metering for work zones. This report documents the results from the first deployment of temporary ramp meters in work zones in the United States. Temporary ramp meters were deployed at seven urban short-term work zones in Missouri. Safety measures such as driver compliance, merging behavior, and speed differentials were extracted from video-based field data. Mobility analysis was conducted using a calibrated simulation model and the total delays were obtained for under capacity, at capacity, and over capacity conditions. This evaluation suggests that temporary ramp meters should only be deployed at work zone locations where there is potential for congestion and turned on only during above-capacity conditions. The compliance analysis showed that non-compliance could be a major safety issue in the deployment of temporary ramp meters for under-capacity conditions. The use of a three-section instead of a traditional two-section signal head used for permanent ramp metering produced significantly higher compliance rates. Ramp metering decreased ramp platoons by increasing the percentage of single-vehicle merges to over 70% from under 50%. The accepted-merge-headway results were not statistically significant even though a slight shift towards longer headways was found with the use of ramp meters. Mobility analysis revealed that ramp metering produced delay savings for both mainline and ramp vehicles for work zones operating above capacity. On average a 24% decrease in total delay (mainline plus ramp) at low truck percentage and a 19% decrease in delay at high truck percentage conditions resulted from ramp metering.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Variable advisory speed limit (VASL) systems could be effective at both urban and rural work zones, at both uncongested and congested sites. At uncongested urban work zones, the average speeds with VASL were lower than without VASL. But the standard deviation of speeds with VASL was higher. The increase in standard deviation may be due to the advisory nature of VASL. The speed limit compliance with VASL was about eight times greater than without VASL. At the congested sites, the VASL were effective in making drivers slow down gradually as they approached the work zone, reducing any sudden changes in speeds. Mobility-wise the use of VASL resulted in a decrease in average queue length, throughput, number of stops, and an increase in travel time. Several surrogate safety measures also demonstrated the benefits of VASL in congested work zones. VASL deployments in rural work zones resulted in reductions in mean speed, speed variance, and 85th percentile speeds downstream of the VASL sign. The study makes the following recommendations based on the case studies investigated: 1. The use of VASL is recommended for uncongested work zones to achieve better speed compliance and lower speeds. Greater enforcement of regulatory speed limits could help to decrease the standard deviation in speeds; 2. The use of VASL to complement the static speed limits in rural work zones is beneficial even if the VASL is only used to display the static speed limits. It leads to safer traffic conditions by encouraging traffic to slow down gradually and by reminding traffic of the reduced speed limit. A well-designed VASL algorithm, like the P5 algorithm developed in this study, can significantly improve the mobility and safety conditions in congested work zones. The use of simulation is recommended for optimizing the VASL algorithms before field deployment.