25 resultados para catastrophe bonds


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Per legislative requirement, attached is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II. Although a status report for the Bridge Safety Fund was already submitted to the directors of LSA and DOM, a status report on those projects is also included within this attachment for consistency with last year’s reporting. In addition, per request from LSA, status reports for the FY 2011 passenger rail appropriation from the Underground Storage Tank Fund and the FY 2010 Commercial Service Vertical Infrastructure appropriation from the General Fund are also listed in this report.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Per legislative requirement, attached is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II. In addition, we have included status reports for the FY11 passenger rail appropriation from the Underground Storage Tank Fund and the FY2010 Commercial Service Vertical Infrastructure appropriation from the General Fund.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Moisture sensitivity of Hot Mix Asphalt (HMA) mixtures, generally called stripping, is a major form of distress in asphalt concrete pavement. It is characterized by the loss of adhesive bond between the asphalt binder and the aggregate (a failure of the bonding of the binder to the aggregate) or by a softening of the cohesive bonds within the asphalt binder (a failure within the binder itself), both of which are due to the action of loading under traffic in the presence of moisture. The evaluation of HMA moisture sensitivity has been divided into two categories: visual inspection test and mechanical test. However, most of them have been developed in pre-Superpave mix design. This research was undertaken to develop a protocol for evaluating the moisture sensitivity potential of HMA mixtures using the Nottingham Asphalt Tester (NAT). The mechanisms of HMA moisture sensitivity were reviewed and the test protocols using the NAT were developed. Different types of blends as moisture-sensitive groups and non-moisture-sensitive groups were used to evaluate the potential of the proposed test. The test results were analyzed with three parameters based on performance character: the retained flow number depending on critical permanent deformation failure (RFNP), the retained flow number depending on cohesion failure (RFNC), and energy ratio (ER). Analysis based on energy ratio of elastic strain (EREE ) at flow number of cohesion failure (FNC) has higher potential to evaluate the HMA moisture sensitivity than other parameters. If the measurement error in data-acquisition process is removed, analyses based on RFNP and RFNC would also have high potential to evaluate the HMA moisture sensitivity. The vacuum pressure saturation used in AASHTO T 283 and proposed test has a risk to damage specimen before the load applying.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Per legislative requirement, attached is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II. In addition, we have included status reports for the FY11 passenger rail appropriation from the Underground Storage Tank Fund and the FY2010 Commercial Service Vertical Infrastructure appropriation from the General Fund.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the Iowa Department of Transportation's summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and revenue Bonds Capitals II.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Revenue Bonds Capitals and Revenue Bonds Capitals II.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Revenue Bonds Capitals and Revenue Bonds Capitals II.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The City of Remsen is proactively addressing an increase of nitrates in their public water supply before it becomes a financial catastrophe for them. An intensive assessment was conducted by the Iowa DNR Source Water Protection program as one of four pilot projects in the state. This assessment far surpassed standard desktop assessments and gathered monitoring information in-the-field led by a local watershed group. This was incorporated into a computer modeling program to help the local watershed group discuss alternatives. This comprehensive approach clearly identified the source of nitrate infiltration as a cropland area adjacent to the City well field. Many options were evaluated but only one option provided an economical, viable and secure answer to the water supply needs of Remsen for generations to come. The watershed planning group chose to seek the purchase of this critical area of cropland and convert it to a deep rooted mixture of native grasses. This WIRB funding is intended to be used to acquire a small area totaling 21.1 acres. It represents about 22% of the total local project effort. This will be added to the existing City well field of 40.2 acres and another piece of adjacent property, 35.34 acres, that the City recently acquired as part of an overall aggressive program to protect the community water supply. The City has a signed purchase agreement for 14.4 acres of the 21.1 and a strong verbal commitment to obtain the remaining 5.7 acres. This project has been very active for almost 2 years and is ready to implement immediately upon funding notification. The establishment of native grasses, funded by the local chapter of Pheasants Forever, will take approximately the next three years of operation & maintenance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the Iowa Department of Transportation's summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Revenue Bonds Capitals and Revenue Bonds Capitals II.