82 resultados para Wetland mitigation


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Blowing and drifting of snow is a major concern for transportation efficiency and road safety in regions where their development is common. One common way to mitigate snow drift on roadways is to install plastic snow fences. Correct design of snow fences is critical for road safety and maintaining the roads open during winter in the US Midwest and other states affected by large snow events during the winter season and to maintain costs related to accumulation of snow on the roads and repair of roads to minimum levels. Of critical importance for road safety is the protection against snow drifting in regions with narrow rights of way, where standard fences cannot be deployed at the recommended distance from the road. Designing snow fences requires sound engineering judgment and a thorough evaluation of the potential for snow blowing and drifting at the construction site. The evaluation includes site-specific design parameters typically obtained with semi-empirical relations characterizing the local transport conditions. Among the critical parameters involved in fence design and assessment of their post-construction efficiency is the quantification of the snow accumulation at fence sites. The present study proposes a joint experimental and numerical approach to monitor snow deposits around snow fences, quantitatively estimate snow deposits in the field, asses the efficiency and improve the design of snow fences. Snow deposit profiles were mapped using GPS based real-time kinematic surveys (RTK) conducted at the monitored field site during and after snow storms. The monitored site allowed testing different snow fence designs under close to identical conditions over four winter seasons. The study also discusses the detailed monitoring system and analysis of weather forecast and meteorological conditions at the monitored sites. A main goal of the present study was to assess the performance of lightweight plastic snow fences with a lower porosity than the typical 50% porosity used in standard designs of such fences. The field data collected during the first winter was used to identify the best design for snow fences with a porosity of 50%. Flow fields obtained from numerical simulations showed that the fence design that worked the best during the first winter induced the formation of an elongated area of small velocity magnitude close to the ground. This information was used to identify other candidates for optimum design of fences with a lower porosity. Two of the designs with a fence porosity of 30% that were found to perform well based on results of numerical simulations were tested in the field during the second winter along with the best performing design for fences with a porosity of 50%. Field data showed that the length of the snow deposit away from the fence was reduced by about 30% for the two proposed lower-porosity (30%) fence designs compared to the best design identified for fences with a porosity of 50%. Moreover, one of the lower-porosity designs tested in the field showed no significant snow deposition within the bottom gap region beneath the fence. Thus, a major outcome of this study is to recommend using plastic snow fences with a porosity of 30%. It is expected that this lower-porosity design will continue to work well for even more severe snow events or for successive snow events occurring during the same winter. The approach advocated in the present study allowed making general recommendations for optimizing the design of lower-porosity plastic snow fences. This approach can be extended to improve the design of other types of snow fences. Some preliminary work for living snow fences is also discussed. Another major contribution of this study is to propose, develop protocols and test a novel technique based on close range photogrammetry (CRP) to quantify the snow deposits trapped snow fences. As image data can be acquired continuously, the time evolution of the volume of snow retained by a snow fence during a storm or during a whole winter season can, in principle, be obtained. Moreover, CRP is a non-intrusive method that eliminates the need to perform man-made measurements during the storms, which are difficult and sometimes dangerous to perform. Presently, there is lots of empiricism in the design of snow fences due to lack of data on fence storage capacity on how snow deposits change with the fence design and snow storm characteristics and in the estimation of the main parameters used by the state DOTs to design snow fences at a given site. The availability of such information from CRP measurements should provide critical data for the evaluation of the performance of a certain snow fence design that is tested by the IDOT. As part of the present study, the novel CRP method is tested at several sites. The present study also discusses some attempts and preliminary work to determine the snow relocation coefficient which is one of the main variables that has to be estimated by IDOT engineers when using the standard snow fence design software (Snow Drift Profiler, Tabler, 2006). Our analysis showed that standard empirical formulas did not produce reasonable values when applied at the Iowa test sites monitored as part of the present study and that simple methods to estimate this variable are not reliable. The present study makes recommendations for the development of a new methodology based on Large Scale Particle Image Velocimetry that can directly measure the snow drift fluxes and the amount of snow relocated by the fence.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reflective cracks form in pavements when hot-mix asphalt (HMA) overlays are placed over jointed and/or severely cracked rigid and flexible pavements. In the first part of the research, survival analysis was conducted to identify the most appropriate rehabilitation method for composite pavements and to evaluate the influence of different factors on reflective crack development. Four rehabilitation methods, including mill and fill, overlay, heater scarification (SCR), and rubblization, were analyzed using three performance indicators: reflective cracking, international roughness index (IRI), and pavement condition index (PCI). It was found that rubblization can significantly retard reflective cracking development compared to the other three methods. No significant difference for PCI was seen among the four rehabilitation methods. Heater scarification showed the lowest survival probability for both reflective cracking and IRI, while an overlay resulted in the poorest overall pavement condition based on PCI. In addition, traffic level was found not to be a significant factor for reflective cracking development. An increase in overlay thickness can significantly delay the propagation of reflective cracking for all four treatments. Soil types in rubblization pavement sites were assessed, and no close relationship was found between rubblized pavement performance and subgrade soil condition. In the second part of the research, the study objective was to evaluate the modulus and performance of four reflective cracking treatments: full rubblization, modified rubblization, crack and seat, and rock interlayer. A total of 16 pavement sites were tested by the surface wave method (SWM), and in the first four sites both falling weight deflectometer (FWD) and SWM were conducted for a preliminary analysis. The SWM gave close concrete layer moduli compared to the FWD moduli on a conventional composite pavement. However, the SWM provided higher moduli for the rubblized concrete layer. After the preliminary analysis, another 12 pavement sites were tested by the SWM. The results showed that the crack and seat method provided the highest moduli, followed by the modified rubblization method. The full rubblization and the rock interlayer methods gave similar, but lower, moduli. Pavement performance surveys were also conducted during the field study. In general, none of the pavement sites had rutting problems. The conventional composite pavement site had the largest amount of reflective cracking. A moderate amount of reflective cracking was observed for the two pavement sites with full rubblization. Pavements with the rock interlayer and modified rubblization treatments had much less reflective cracking. It is recommended that use of the modified rubblization and rock interlayer treatments for reflective cracking mitigation are best.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Flood Mitigation Program is created within Code of Iowa, Chapter 418. The Program seeks to provide funds for flood mitigation projects that otherwise would not be funded. The Flood Mitigation Board is responsible for the implementation Code of Iowa Chapter 418. The membership of the Board is comprised of four voting public members appointed by the Governor, five voting members representing state agencies, and four non-voting ex-officio members of the legislature.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Flood Mitigation Program is created within Code of Iowa, Chapter 418. The Program seeks to provide funds for fl ood mitigation projects that otherwise would not be funded. The Flood Mitigation Board is responsible for the implementation of Code of Iowa Chapter 418. The membership of the Board is comprised of four voting public members appointed by the Governor, five voting members representing state agencies, four non-voting ex officio members of the legislature, and one non-voting ex officio member representing a state agency.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The condition of Iowa’s riverine wetlands is poorly known. No historic baseline information about the physical conditions, vegetation communities, and wildlife use in these ecosystems exists in the state. The primary goals of this project were to assess the ecological condition of riverine wetlands in Iowa, and improve the quality and quantity of data available to resource managers. Iowa’s remaining riverine wetlands represent a valuable set of resources, and their continued monitoring and assessment is imperative to future management decisions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Four-lane undivided roadways in urban areas can experience a degradation of service and/or safety as traffic volumes increase. In fact, the existence of turning vehicles on this type of roadway has a dramatic effect on both of these factors. The solution identified for these problems is typically the addition of a raised median or two-way left-turn lane (TWLTL). The mobility and safety benefits of these actions have been proven and are discussed in the “Past Research” chapter of this report along with some general cross section selection guidelines. The cost and right-of-way impacts of these actions are widely accepted. These guidelines focus on the evaluation and analysis of an alternative to the typical four-lane undivided cross section improvement approach described above. It has been found that the conversion of a four-lane undivided cross section to three lanes (i.e., one lane in each direction and a TWLTL) can improve safety and maintain an acceptable level of service. These guidelines summarize the results of past research in this area (which is almost nonexistent) and qualitative/quantitative before-and-after safety and operational impacts of case study conversions located throughout the United States and Iowa. Past research confirms that this type of conversion is acceptable or feasible in some situations but for the most part fails to specifically identify those situations. In general, the reviewed case study conversions resulted in a reduction of average or 85th percentile speeds (typically less than five miles per hour) and a relatively dramatic reduction in excessive speeding (a 60 to 70 percent reduction in the number of vehicles traveling five miles per hour faster than the posted speed limit was measured in two cases) and total crashes (reductions between 17 to 62 percent were measured). The 13 roadway conversions considered had average daily traffic volumes of 8,400 to 14,000 vehicles per day (vpd) in Iowa and 9,200 to 24,000 vehicles per day elsewhere. In addition to past research and case study results, a simulation sensitivity analysis was completed to investigate and/or confirm the operational impacts of a four-lane undivided to three-lane conversion. First, the advantages and disadvantages of different corridor simulation packages were identified for this type of analysis. Then, the CORridor SIMulation (CORSIM) software was used x to investigate and evaluate several characteristics related to the operational feasibility of a four-lane undivided to three-lane conversion. Simulated speed and level of service results for both cross sections were documented for different total peak-hour traffic, access densities, and access-point left-turn volumes (for a case study corridor defined by the researchers). These analyses assisted with the identification of the considerations for the operational feasibility determination of a four -lane to three-lane conversion. The results of the simulation analyses primarily confirmed the case study impacts. The CORSIM results indicated only a slight decrease in average arterial speed for through vehicles can be expected for a large range of peak-hour volumes, access densities, and access-point left-turn volumes (given the assumptions and design of the corridor case study evaluated). Typically, the reduction in the simulated average arterial speed (which includes both segment and signal delay) was between zero and four miles per hour when a roadway was converted from a four-lane undivided to a three-lane cross section. The simulated arterial level of service for a converted roadway, however, showed a decrease when the bi-directional peak-hour volume was about 1,750 vehicles per hour (or 17,500 vehicles per day if 10 percent of the daily volume is assumed to occur in the peak hour). Past research by others, however, indicates that 12,000 vehicles per day may be the operational capacity (i.e., level of service E) of a three-lane roadway due to vehicle platooning. The simulation results, along with past research and case study results, appear to support following volume-related feasibility suggestions for four-lane undivided to three-lane cross section conversions. It is recommended that a four-lane undivided to three-lane conversion be considered as a feasible (with respect to volume only) option when bi-directional peak-hour volumes are less than 1,500 vehicles per hour, but that some caution begin to be exercised when the roadway has a bi-directional peak-hour volume between 1,500 and 1,750 vehicles per hour. At and above 1,750 vehicles per hour, the simulation indicated a reduction in arterial level of service. Therefore, at least in Iowa, the feasibility of a four-lane undivided to three-lane conversion should be questioned and/or considered much more closely when a roadway has (or is expected to have) a peak-hour volume of more than 1,750 vehicles. Assuming that 10 percent of the daily traffic occurs during the peak-hour, these volume recommendations would correspond to 15,000 and 17,500 vehicles per day, respectively. These suggestions, however, are based on the results from one idealized case xi study corridor analysis. Individual operational analysis and/or simulations should be completed in detail once a four-lane undivided to three-lane cross section conversion is considered feasible (based on the general suggestions above) for a particular corridor. All of the simulations completed as part of this project also incorporated the optimization of signal timing to minimize vehicle delay along the corridor. A number of determination feasibility factors were identified from a review of the past research, before-and-after case study results, and the simulation sensitivity analysis. The existing and expected (i.e., design period) statuses of these factors are described and should be considered. The characteristics of these factors should be compared to each other, the impacts of other potentially feasible cross section improvements, and the goals/objectives of the community. The factors discussed in these guidelines include • roadway function and environment • overall traffic volume and level of service • turning volumes and patterns • frequent-stop and slow-moving vehicles • weaving, speed, and queues • crash type and patterns • pedestrian and bike activity • right-of-way availability, cost, and acquisition impacts • general characteristics, including - parallel roadways - offset minor street intersections - parallel parking - corner radii - at-grade railroad crossings xii The characteristics of these factors are documented in these guidelines, and their relationship to four-lane undivided to three-lane cross section conversion feasibility identified. This information is summarized along with some evaluative questions in this executive summary and Appendix C. In summary, the results of past research, numerous case studies, and the simulation analyses done as part of this project support the conclusion that in certain circumstances a four-lane undivided to three-lane conversion can be a feasible alternative for the mitigation of operational and/or safety concerns. This feasibility, however, must be determined by an evaluation of the factors identified in these guidelines (along with any others that may be relevant for a individual corridor). The expected benefits, costs, and overall impacts of a four-lane undivided to three-lane conversion should then be compared to the impacts of other feasible alternatives (e.g., adding a raised median) at a particular location.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Forms State hazard mitigation team, chaired by Department of Public Defense, Disaster Services Division, to determine capabilitites of State agencies, provide assistance, improve preparedness, response, and recovery from disasters.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Rescinds Executive Order #54 and replaces it with a new team called the Primary Iowa Harzard Mitigation Team to coordinate state response to natural and technological disaters.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Seedling Mile in Linn County, Iowa, was part of the Lincoln Highway Association’s so-called “object lesson” program that sought to graphically demonstrate, in the paving of selected one-mile demonstration sections, the benefits of concrete paving to improving road travel across the nation. Constructed in 1918-19, this Seedling Mile became much more than an object lesson and served as something of a battleground between two municipalities—Marion and Cedar Rapids—in their struggle over the county seat and their place on the Lincoln Highway. The Seedling Mile eventually became part of a continuously paved section of the Lincoln Highway between Chicago and Cedar Rapids, with the whole of the Lincoln Highway in Iowa paved in some fashion by the 1930s. In 2002, Linn County reconstructed Mt. Vernon Road from the City of Mt. Vernon to the west end of the Seedling Mile impacting the historic road section. An agreement between concerned government agencies resulted in this publication in partial mitigation of the impact to this historic road section under the guidelines of the National Historic Preservation Act.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The RIO’S 90-page July Quarterly Report details the economic recovery strategy in housing; business; workforce development; infrastructure investments; individual services and guidance; local economic recovery; smart growth; mitigation planning; floodplain and watershed management; floodplain mapping; quality of life; and emergency management.The report also includes an updated selection of charts showing the flow of federal and state disaster recovery funding to the state, counties, cities and individuals affected by the 2008 disasters.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The 70-page report provides an overview of the disaster assistance programs that have been implemented to help impacted Iowans; outreach to communities to assist with long-term planning; flood mitigation efforts; charts detailing the flow of disaster-related funding to impacted citizens; disaster recovery activities undertaken by various state departments; and photos taken of disaster-stricken areas. Long-term recovery challenges and goals remaining for Iowa are also addressed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The RIO’S October Quarterly Report details the economic recovery strategy in housing; business; workforce development; infrastructure investments; individual services and guidance; local economic recovery; smart growth; mitigation planning; floodplain and watershed management; floodplain mapping; quality of life; and emergency management.The report also includes an updated selection of charts showing the flow of federal and state disaster recovery funding to the state, counties, cities and individuals affected by the 2008 disasters.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mitigation pays. It includes any activities that prevent an emergency, reduce the chance of an emergency happening, or lessen the damaging effects of unavoidable emergencies. Investing in mitigation steps now such as constructing barriers such as levees and purchasing flood insurance will help reduce the amount of structural damage to your home and financial loss from building and crop damage should a flood or flash flood occur.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The RIO’S January 2010 Quarterly Report details the economic recovery strategy in housing; business; workforce development; infrastructure investments; individual services and guidance; local economic recovery; smart growth; mitigation planning; floodplain and watershed management; floodplain mapping; quality of life; and emergency management.The report also includes an updated selection of charts showing the flow of federal and state disaster recovery funding to the state, counties, cities and individuals affected by the 2008 disasters.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The RIO’S April 2010 Quarterly Report details the economic recovery strategy in housing; business; workforce development; infrastructure investments; individual services and guidance; local economic recovery; smart growth; mitigation planning; floodplain and watershed management; floodplain mapping; quality of life; and emergency management.The report also includes an updated selection of charts showing the flow of federal and state disaster recovery funding to the state, counties, cities and individuals affected by the 2008 disasters.