26 resultados para Vertical Crack


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Four Iowa DOT asphalt concrete pavement crack sealing projects were selected to evaluate the benefits of heat lance crack preparation. Two, one-half mile sections, both with and without heat lance preparation, were constructed in Story, Monroe, Clinton and Wayne Counties in 1991 and 1992. They were visually evaluated annually from 1992 through 1996. The heat lance preparation did not yield improved seal performance or extended longevity. There was no perceivable difference between crack sealing with and without heat lance preparation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bridge deck cracking occasionally occurs during construction for any number of reasons. Improper design, concrete placement or deck curing can result in cracks. One contributing factor toward cracking may be dead load deflections induced during concrete placement. For both continuous and non-continuous bridges, specific placement sequences are required to minimize harmful deflections in previously placed sections. Set retarding admixtures are also used to keep previously placed concrete plastic until the pour is completed. The problem is--at what point does movement of the concrete cause permanent damage to the deck. The study evaluated the time to crack formation relationship for mixes with low and high dosages of set retarding admixtures currently approved for use in Iowa state and county projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Vertical delineators are intended to warn drivers of an approaching curve while providing them with a better appreciation of the sharpness of a curve. Drivers can then select an appropriate speed before entering the curve. Delineation can also provide continuous tracking information once drivers are within the curve to help position their vehicles within the travel lane while traversing the curve. The most common type of vertical delineation is post mounted delineators (PMDs). These devices are usually flexible or rigid posts with some amount of reflective surface mounted along the roadside to provide additional delineation. Another treatment that has been used is to provide additional delineation on chevron posts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The three miles of fibrous concrete resurfacing in Greene County, Iowa were placed in September and early October, 1973. It was recognized in advance that cracking and other performance characteristics of the fibrous concrete sections and of the control sections would be major factors in the evaluation of the project. A low level aerial survey was made of the old pavement. During construction of the resurfacing, the aerial survey was checked to insure that cracks in the old pavement were referenced to the 100 ft. station marks placed in the resurfacing. A final report for research project HR-165, based upon overall performance evaluation was published in December 1978.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The crack and seat (C & S) method of rehabilitating concrete pavements has been proposed to reduce the incidence of reflective cracking in asphalt overlays. These cracked pieces help reduce the thermal effects on lateral joint movement while the seating of slab pieces reduces vertical movement. This 1986 project demonstrated that a 0.6 m x 0.9 m (2 ft x 3 ft) cracking pattern was optimal to retard reflective cracking in an asphalt overlay. The best performance among three C & S test sections was section 4 with a 0.6 m x 0.9 m (2 ft x 3 ft) cracking pattern and 7.6 cm (3 in) overlay. Structural ratings determined from the Road Rater™ indicated little difference between each C & S section with varying AC thicknesses and crack spacings. Although reflection cracking is reduced in the early years after construction, the effectiveness of the C & S method diminishes over time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A mechanical gauge was developed to monitor the movement of crack or joint openings in portland cement concrete structures, in general, and portland cement concrete pavements in particular. Designed to be inexpensive and simple to operate, this gauge is capable of recording maximum, minimum, and instantaneous crack or joint openings. Specific recommendations were made for recording minimum and maximum pavement temperature over the monitoring period. The report was written as a set of guidelines for design, fabrication, installation, and operation of the gauge as well as the temperature measuring device.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa DOT has been using the AASHTO Present Serviceability Index (PSI) rating procedure since 1968 to rate the condition of pavement sections. A ride factor and a cracking and patching factor make up the PSI value. Crack and patch surveys have been done by sending crews out to measure and record the distress. Advances in video equipment and computers make it practical to videotape roads and do the crack and patch measurements in the office. The objective of the study was to determine the feasibility of converting the crack and patch survey operation to a video recording system with manual post processing. The summary and conclusions are as follows: Video crack and patch surveying is a feasible alternative to the current crack and patch procedure. The cost per mile should be about 25 percent less than the current procedure. More importantly, the risk of accidents is reduced by getting the people and vehicles off the roadway and shoulder. Another benefit is the elimination of the negative public perceptions of the survey crew on the shoulder.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This Phase II follow-up study of IHRB Project TR-473 focused on the performance evaluation of rubblized pavements in Iowa. The primary objective of this study was to evaluate the structural condition of existing rubblized concrete pavements across Iowa through Falling Weight Deflectometer (FWD) tests, Dynamic Cone Penetrometer (DCP) tests, visual pavement distress surveys, etc. Through backcalculation of FWD deflection data using the Iowa State University's advanced layer moduli backcalculation program, the rubblized layer moduli were determined for various projects and compared with each other for correlating with the long-term pavement performance. The AASHTO structural layer coefficient for rubblized layer was also calculated using the rubblized layer moduli. To validate the mechanistic-empirical (M-E) hot mix asphalt (HMA) overlay thickness design procedure developed during the Phase I study, the actual HMA overlay thicknesses from the rubblization projects were compared with the predicted thicknesses obtained from the design software. The results of this study show that rubblization is a valid option to use in Iowa in the rehabilitation of portland cement concrete pavements provided the foundation is strong enough to support construction operations during the rubblization process. The M-E structural design methodology developed during Phase I can estimate the HMA overlay thickness reasonably well to achieve long-lasting performance of HMA pavements. The rehabilitation strategy is recommended for continued use in Iowa under those conditions conducive for rubblization.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Early entry sawing applies sawing earlier and more shallowly than conventional sawing and is believed to increase sawing productivity and reduce the cost of the joint sawing operations. However, some early entry sawing joints (transverse joints) in Iowa were found to experience delayed cracking, sometimes up to 30 days. A concern is whether early entry sawing can lead to late-age random cracking. The present study investigated the effects of different sawing methods on random cracking in portland cement concrete (PCC) pavements. The approach was to assess the cracking potential at sawing joints by measuring the strain development of the concrete at the joints using concrete embedment strain gages. Ten joints were made with the early entry sawing method to a depth of 1.5 in., and two strain gages were installed in each of the joints. Another ten joints were made with the conventional sawing method, five of which were sawed to a depth of one-third of the pavement thickness (3.3 in.), and the other five of which were sawed to a depth of one-quarter of the pavement thickness (2.5 in.). One strain gage was installed in each joint made using conventional sawing. In total, 30 strain gages were installed in 20 joints. The results from the present study indicate that all 30 joints cracked within 25 days after paving, though most joints made using early entry sawing cracked later than the joints made using conventional sawing. No random cracking was observed in the early entry sawing test sections two months after construction. Additionally, it was found that the strain gages used were capable of monitoring the deformations at the joints. The joint crack times (or crack initiation time) measured by the strain gages were generally consistent with the visual observations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reflective cracks form in pavements when hot-mix asphalt (HMA) overlays are placed over jointed and/or severely cracked rigid and flexible pavements. In the first part of the research, survival analysis was conducted to identify the most appropriate rehabilitation method for composite pavements and to evaluate the influence of different factors on reflective crack development. Four rehabilitation methods, including mill and fill, overlay, heater scarification (SCR), and rubblization, were analyzed using three performance indicators: reflective cracking, international roughness index (IRI), and pavement condition index (PCI). It was found that rubblization can significantly retard reflective cracking development compared to the other three methods. No significant difference for PCI was seen among the four rehabilitation methods. Heater scarification showed the lowest survival probability for both reflective cracking and IRI, while an overlay resulted in the poorest overall pavement condition based on PCI. In addition, traffic level was found not to be a significant factor for reflective cracking development. An increase in overlay thickness can significantly delay the propagation of reflective cracking for all four treatments. Soil types in rubblization pavement sites were assessed, and no close relationship was found between rubblized pavement performance and subgrade soil condition. In the second part of the research, the study objective was to evaluate the modulus and performance of four reflective cracking treatments: full rubblization, modified rubblization, crack and seat, and rock interlayer. A total of 16 pavement sites were tested by the surface wave method (SWM), and in the first four sites both falling weight deflectometer (FWD) and SWM were conducted for a preliminary analysis. The SWM gave close concrete layer moduli compared to the FWD moduli on a conventional composite pavement. However, the SWM provided higher moduli for the rubblized concrete layer. After the preliminary analysis, another 12 pavement sites were tested by the SWM. The results showed that the crack and seat method provided the highest moduli, followed by the modified rubblization method. The full rubblization and the rock interlayer methods gave similar, but lower, moduli. Pavement performance surveys were also conducted during the field study. In general, none of the pavement sites had rutting problems. The conventional composite pavement site had the largest amount of reflective cracking. A moderate amount of reflective cracking was observed for the two pavement sites with full rubblization. Pavements with the rock interlayer and modified rubblization treatments had much less reflective cracking. It is recommended that use of the modified rubblization and rock interlayer treatments for reflective cracking mitigation are best.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Vertical Clearance Log is prepared for the purpose of providing vertical clearance restrictions by route on the primary road system. This report is used by the Iowa Department of Transportation’s Motor Carrier Services to route oversize vehicles around structures with vertical restrictions too low for the cargo height. The source of the data is the Geographic Information Management System (GIMS) that is managed by the Office of Research & Analytics in the Performance & Technology Division. The data is collected by inspection crews and through the use of LiDAR technology to reflect changes to structures on the primary road system. This log is produced annually.