27 resultados para Underground reservoirs
Resumo:
Per legislative requirement, attached is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II. In addition, we have included status reports for the FY11 passenger rail appropriation from the Underground Storage Tank Fund and the FY2010 Commercial Service Vertical Infrastructure appropriation from the General Fund.
Resumo:
Per legislative requirement, attached is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II. In addition, we have included status reports for the FY11 passenger rail appropriation from the Underground Storage Tank Fund and the FY2010 Commercial Service Vertical Infrastructure appropriation from the General Fund.
Resumo:
The Missouri River floods of 2011 will go down in history as the longest duration flooding event this state has seen to date. The combination of above normal snowfall in the upper Missouri River basin followed by the equivalent of nearly one year’s worth of rainfall in May created an above normal runoff situation which filled the Missouri River and the six main reservoirs within the basin. Compounding this problem was colder than normal temperatures which kept much of the snowpack in the upper basin on the ground longer into the spring, setting the stage for this historic event. The U.S. Army Corps of Engineers (USACE) began increasing the outflow at Gavin’s Point, near Yankton, South Dakota in May. On June 14, 2011, the outflow reached a record rate of over 160,000 cubic feet per second (cfs), over twice the previous record outflow set in 1997. This increased output from Gavin’s Point caused the Missouri River to flow out of its banks covering over 283,000 acres of land in Iowa, forcing hundreds of evacuations, damaging 255,000 acres of cropland and significantly impacting the levee system on the Missouri River basin. Over the course of the summer, approximately 64 miles of primary roads closed due to Missouri River flooding, including 54 miles of Interstate Highway. Many county secondary roads were closed by high water or overburdened due to the numerous detours and road closures in this area. As the Missouri River levels began to increase, municipalities and counties aided by State and Federal agencies began preparing for a sustained flood event. Citizens, businesses, state agencies, local governments and non‐profits made substantial preparations, in some cases expending millions of dollars on emergency protective measures to protect their facilities from the impending flood. Levee monitors detected weak spots in the levee system in all affected counties, with several levees being identified as at risk levees that could potentially fail. Of particular concern was the 28 miles of levees protecting Council Bluffs. Based on this concern, Council Bluffs prepared an evacuation plan for the approximately 30,000 residents that resided in the protected area. On May 25, 2011, Governor Branstad directed the execution of the Iowa Emergency Response Plan in accordance with Section 401 of the Stafford Act. On May 31, 2011, HSEMD Administrator, Brigadier General J. Derek Hill, formally requested the USACE to provide technical assistance and advanced measures for the communities along the Missouri River basin. On June 2, 2011 Governor Branstad issued a State of Iowa Proclamation of Disaster Emergency for Fremont, Harrison, Mills, Monona, Pottawattamie, and Woodbury counties. The length of this flood event created a unique set of challenges for Federal, State and local entities. In many cases, these organizations were conducting response and recovery operations simultaneously. Due to the length of this entire event, the State Emergency Operations Center and the local Emergency Operations Centers remained open for an extended period of time, putting additional strain on many organizations and resources. In response to this disaster, Governor Branstad created the Missouri River Recovery Coordination Task Force to oversee the State’s recovery efforts. The Governor announced the creation of this Task Force on October 17, 2011 and appointed Brigadier General J. Derek Hill, HSEMD Administrator as the chairman. This Task Force would be a temporary group of State agency representatives and interested stakeholders brought together to support the recovery efforts of the Iowa communities impacted by the Missouri River Flood. Collectively, this group would analyze and share damage assessment data, coordinate assistance across various stakeholders, monitor progress, capture best practices and identify lessons learned.
Resumo:
Iowa’s first annual Energy Independence Plan kicks off a new era of state leadership in energy transformation. Supported by Governor Chet Culver, Lieutenant Governor Patty Judge, and the General Assembly, the Office of Energy Independence was established in 2007 to coordinate state activities for energy independence. The commitment of the state to lead by example creates opportunities for state government to move boldly to achieve its goals, track its progress, measure the results, and report the findings. In moving to energy independence, the active engagement of every Iowan will be sought as the state works in partnership with others in achieving the goals. While leading ongoing efforts within the state, Iowa can also show the nation how to effectively address the critical, complex challenges of shifting to a secure energy future of affordable energy, cost-effective efficiency, reliance on sustainable energy, and enhanced natural resources and environment. In accordance with House File 918, “the plan shall provide cost effective options and strategies for reducing the state’s consumption of energy, dependence on foreign sources of energy, use of fossil fuels, and greenhouse gas emissions. The options and strategies developed in the plan shall provide for achieving energy independence from foreign sources of energy by the year 2025.” Energy independence is a term which means different things to different people. We use the term to mean that we are charting our own course in the emerging energy economy. Iowa can chart its own course by taking advantage of its resources: a well-educated population and an abundance of natural resources, including rich soil, abundant surface and underground water, and consistent wind patterns. Charting our own course also includes further developing our in-state industry, capturing renewable energy, and working toward improved energy efficiency. Charting our own course will allow Iowa to manage its economic destiny while protecting our environment, while creating new, “green collar” industries in every corner of Iowa. Today Iowa is in a remarkable position to capitalize on the current situation globally and at home. Energy drives the economy and has impacts on the environment, undeniable links that are integral for energy security and independence. With the resources available within the state, the combination of significant global changes in energy and research leading to new technologies that continue to drive down the costs of sustainable energy, Iowa can take bold strides toward the goal of energy independence by 2025. The Office of Energy Independence, with able assistance from hundreds of individuals, organizations, agencies, and advisors, presents its plan for Iowa’s Energy Independence.
Resumo:
In May 2011, very heavy rains combined with above average snowpack caused reservoirs throughout the Upper Missouri River basin to swell. The river carried more water in May and June than it does in an average year. The six Iowa counties bordering the river—Fremont, Harrison, Mills, Monona, Pottawattamie and Woodbury—suffered from major flooding which persisted throughout the spring and summer. On June 2, Governor Terry Branstad issued a Proclamation of Disaster Emergency for the six impacted counties. The Iowa Homeland Security and Emergency Management Division (HSEMD) activated the State Emergency Operations Center (SEOC) on June 10 to coordinate State, Federal, private sector, and voluntary agency preparedness and response activities in the affected area. The severity and duration of the flooding presented operational challenges for the SEOC and its partner agencies, which were further complicated by severe weather. The flooding forced the SEOC to conduct simultaneous response and recovery operations for an usually long period of time. The Missouri River floods caused major economic losses in Western Iowa. As a result of these economic losses, President Barack Obama issued a Major Disaster Declaration (FEMA-1998-DR) which made six counties eligible for Federal Public Assistance. The disaster declaration was subsequently amended on October 18, making five counties eligible for Federal Individual Assistance.
Resumo:
The Missouri River floods of 2011 will go down in history as the longest duration flooding event this state has seen to date. The combination of above normal snowfall in the upper Missouri River basin followed by the equivalent of nearly one year’s worth of rainfall in May created an above normal runoff situation which filled the Missouri River and the six main reservoirs within the basin. Compounding this problem was colder than normal temperatures which kept much of the snow pack in the upper basin on the ground longer into the spring, setting the stage for this historic event.
Resumo:
Conventional concrete is typically cured using external methods. External curing prevents drying of the surface, allows the mixture to stay warm and moist, and results in continued cement hydration (Taylor 2014). Internal curing is a relatively recent technique that has been developed to prolong cement hydration by providing internal water reservoirs in a concrete mixture that do not adversely affect the concrete mixture’s fresh or hardened physical properties. Internal curing grew out of the need for more durable structural concretes that were resistant to shrinkage cracking. Joint spacing for concrete overlays can be increased if slab warping is reduced or eliminated. One of the most promising potential benefits from using internal curing for concrete overlays, then, is the reduced number of joints due to increased joint spacing (Wei and Hansen 2008).
Resumo:
The relationship between Iowa’s roads and drainage developed when rural roads were originally constructed. The land parallel to roadways was excavated to create road embankments. The resulting ditches provided an outlet for shallow tiles to drain nearby fields for farming. Iowa’s climate and terrain are nearly ideal for farming, and more than 90 percent of the land suits the purpose. Much of the land, however, needs to be artificially drained to achieve maximum productivity. Most of this drainage has been accomplished with an extensive network of levees, open ditches, and underground tiles. The U.S. Census Bureau estimated that as early as 1920 approximately nine million acres of Iowa farm land had been artificially drained or needed to be. Couple this drainage system with Iowa’s extensive surface transportation system—approximately 100,000 miles of roads and streets, 90,000 on local systems— and potential for conflicts will naturally arise. This is particularly true with urban expansion resulting in residential and commercial development of rural land. This manual contains summaries of and references to the laws most relevant to drainage in Iowa. It also includes frequently asked questions about transportation agencies’ responsibilities related to drainage. Typical policies and agreement forms used by agencies to address drainage issues are illustrated and a glossary of common terms is included.
Resumo:
Trenchless technologies are methods used for the construction and rehabilitation of underground utility pipes. These methods are growing increasingly popular due to their versatility and their potential to lower project costs. However, the use of trenchless technologies in Iowa and their effects on surrounding soil and nearby structures has not been adequately documented. Surveys of and interviews with professionals working in trenchless-related industries in Iowa were conducted, and the results were analyzed and compared to survey results from the United States as a whole. The surveys focused on method familiarity, pavement distress observed, reliability of trenchless methods, and future improvements. Results indicate that the frequency of pavement distress or other trenchless-related issues are an ongoing problem in the industry. Inadequate soil information and quality control/quality assurance (QC/QA) are partially to blame. Fieldwork involving the observation of trenchless construction projects was undertaken with the purpose of documenting current practices and applications of trenchless technology in the United States and Iowa. Field tests were performed in which push-in pressure cells were used to measure the soil stresses induced by trenchless construction methods. A program of laboratory soil testing was carried out in conjunction with the field testing. Soil testing showed that the installations were made in sandy clay or well-graded sand with silt and gravel. Pipes were installed primarily using horizontal directional drilling with pipe diameters from 3 to 12 inches. Pressure cell monitoring was conducted during the following construction phases: pilot bore, pre-reaming, and combined pipe pulling and reaming. The greatest increase in lateral earth pressure was 5.6 psi and was detected 2.1 feet from the centerline of the bore during a pilot hole operation in sandy lean clay. Measurements from 1.0 to 2.5 psi were common. Comparisons were made between field measurements and analytical and finite element calculation methods.
Resumo:
Bridge deck and substructure deterioration due to the corrosive effects of deicing chemicals on reinforcing steel is a problem facing many transportation agencies. The main concern is protection of older bridges with uncoated reinforcing steel. Many different methods have been tried over the past years to repair bridge decks. The Iowa system of bridge deck rehabilitation has proven to be very effective. It consists of scarifying the deck surface, removing any deteriorated concrete, and overlaying with low slump dense concrete. Another rehabilitation method that has emerged is cathodic protection. It has been used for many years in the protection of underground pipelines and in 1973 was first installed on a bridge deck. Cathodic protection works by applying an external source of direct current to the embedded reinforcing steel, thereby changing the electrochemical process of corrosion. The corroding steel, which is anodic, is protected by changing it to a cathodic state. The technology involved in cathodic protection as applied to bridge decks has improved over the last 12 years. One company marketing new technology in cathodic protection systems is Raychem Corporation of Menlo Park, California. Their system utilizes a Ferex anode mesh that distributes the impressed direct current over the deck surface. Ferex mesh was selected because it seemed readily adaptable to the Iowa system of bridge deck rehabilitation. The bridge deck would be scarified, deteriorated concrete removed, Ferex anode mesh installed, and overlaid with low slump dense concrete. The Federal Highway Administration (FHWA) promotes cathodic protection under Demonstration Project No. 34, "Cathodic Protection for Reinforced Concrete Bridge Decks."
Resumo:
Human trafficking has become a topic receiving much interest both in Iowa and nationally. However, estimates of human trafficking incidents and victims are difficult to derive given the underground nature of the offense. The purpose of this analysis is to gather data on human trafficking incidents in the state of Iowa.
Resumo:
The Iowa Department of Natural Resources (IDNR) asked the Iowa Department of Public Health (IDPH) Hazardous Waste Site Health Assessment Program to perform a health consultation for the Climbing Hill, Iowa, groundwater contamination site. IDNR wants to know if the site poses a public health hazard. The information in this health consultation was current at the time of writing. Data that emerges later could alter this document’s conclusions and recommendations. Climbing Hill is an unincorporated town in Woodbury County, Iowa, approximately 15 miles southeast of Sioux City. The town has approximately 120 residents. All of the residents and most businesses within the town use private wells to supply their drinking water. The local restaurant has an individual well that is classified as a public water supply system because it has the potential to serve more than 25 people in a day. Several wells in the town have become contaminated with gasoline and diesel fuel leaking from two underground storage tanks. All of the wells are roughly 75–80 feet deep (R. Cardinale, IDNR, Underground Storage Tank Section, personal communication, January 30, 2004).