The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.
Resumo:
Iowa’s Rail Environment Iowa’s rail transportation system provides both freight and passenger service. Rail serves a variety of trips, including those within Iowa and those to other states as well as to foreign markets. While rail competes with other modes, it also cooperates with those modes to provide intermodal services to Iowans. In 2009 Iowa’s rail transportation system could be described as follows: Freight Iowa’s 130,000-mile freight transportation system includes an extensive railroad network, a well-developed highway system, two bordering navigable waterways, and a pipeline network as well as air cargo facilities. While rail accounts for only 3 percent of the freight network, it carries 43 percent of Iowa’s freight tonnage. A great variety of commodities ranging from fresh fish to textiles to optical products are moved by rail. However, most of the Iowa rail shipments consist of bulk commodities, including grain, grain products, coal, ethanol, and fertilizers. The railroad network performs an important role in moving bulk commodities produced and consumed in the state to local processors, livestock feeders, river terminals and ports for foreign export. The railroad’s ability to haul large volumes, long distances at low costs will continue to be a major factor in moving freight and improving the economy of Iowa. Key 2008 Facts • 3,945 miles of track • 18 railroads • 49.5 million tons shipped • 39.7 million tons received • 2 Amtrak routes • 6 Amtrak stations • 66,286 rail passenger rides Key Rail Trends • slightly fewer miles being operated; • railroads serving Iowa has remained the same; • more rail freight traffic; • more tons hauled per car; • higher average rail rates per ton-mile since 2002; • more car and tons hauled per locomotive; and • more ton miles per gallon of fuel consumed. Iowa’s rail system and service has been evolving over time relative to its size, financial conditions, and competition from other modes.
Resumo:
The IPERS Member Handbook summarizes the retirement plan that is provided for most employees of Iowa’s schools, cities, counties, townships, state agencies, and other governmental units. This publication explains the rights and benefits of IPERS membership in as clear and useful a manner as possible; however, it is not intended to be a complete presentation of the IPERS law and policies. Benefits provided under IPERS differ for Special service members—sheriffs, deputy sheriffs, and those working in other protection occupations, such as firefighters, police, correctional officers, and conservation officers. This publication explains what these differences are. To help you find information that applies only to you, IPERS also publishes a variety of booklets and brochures to guide you through IPERS benefits at specific stages of your career, from membership enrollment to retirement. These educational resources are available for viewing or printing from our website at www.ipers.org. You may also contact IPERS and request a free printed copy. Alternative formats containing the information in this publication are available upon request. Note: This publication reflects the law as of July 2011. Some provisions will become effective at later dates, as noted. Any inconsistencies or inadvertent omissions will be resolved in favor of the law.
Resumo:
This report fulfills the requirements of the following Code of Iowa Sections: Section 327J.3(1): “The director may expend moneys from the fund to pay the costs associated with the initiation, operation, and maintenance of rail passenger service. The director shall report by February 1 of each year to the legislative services agency concerning the status of the fund including anticipated expenditures for the following fiscal year.” Section 327J.3(5): "The director shall report annually to the general assembly concerning the development and operation of the midwest regional rail system and the state's passenger rail service."
Resumo:
Executive Summary I. Survey The Task Force conducted a wide-ranging survey of more than 9,000 licensed Iowa attorneys and judges to obtain their input on a variety of civil justice system topics. The survey results helped inform the Task Force of problem areas in Iowa’s civil justice system. II. Two-Tier Justice System The Task Force recommends a pilot program based on a two-tier civil justice system. A two-tier system would streamline litigation processes—including rules of evidence and discovery disclosures—and reduce litigation costs of certain cases falling below a threshold dollar value. III. One Judge/One Case and Date Certain for Trial Some jurisdictions in Iowa have adopted one judge/one case and date certain for trial in certain cases. The assignment of one judge to each case for the life of the matter and the establishment of dates certain for civil trials could enhance Iowans’ access to the courts, improve judicial management, promote consistency and adherence to deadlines, and reduce discovery excesses. IV. Discovery Processes Reforms addressing inefficient discovery processes will reduce delays in and costs of litigation. Such measures include adopting an aspirational purpose for discovery rules to “secure the just, speedy, and inexpensive determination of every action,” holding discovery proportional to the size and nature of the case, requiring initial disclosures, limiting the number of expert witnesses, and enforcing existing rules. V. Expert Witness Fees The Task Force acknowledges the probable need to revisit the statutory additional daily compensation limit for expert witness fees. Leaving the compensation level to the discretion of the trial court is one potential solution. VI. Jurors Additions to the standard juror questionnaire would provide a better understanding of the potential jurors’ backgrounds and suitability for jury service. The Task Force encourages adoption of more modern juror educational materials and video. Rehabilitation of prospective jurors who express an unwillingness or inability to be fair should include a presumption of dismissal. VII. Video and Teleconferencing Options When court resources are constrained both by limited numbers of personnel and budget cuts, it is logical to look to video and teleconferencing technology to streamline the court process and reduce costs. The judicial branch should embrace technological developments in ways that will not compromise the fairness, dignity, solemnity, and decorum of judicial proceedings. VIII. Court-Annexed Alternative Dispute Resolution(ADR) Litigants and practitioners in Iowa are generally satisfied with the current use of private, voluntary ADR for civil cases. There is concern, however, that maintaining the status quo may have steep future costs. Court-annexed ADR is an important aspect of any justice system reform effort, and the Task Force perceives benefits and detriments to reforming this aspect of the Iowa civil justice system. IX. Relaxed Requirement of Findings of Fact and Conclusions of Law A rule authorizing parties to waive findings of fact and conclusions of law could expedite resolution of nonjury civil cases. X. Business (Specialty) Courts Specialty business courts have achieved widespread support across the country. In addition, specialty courts provide excellent vehicles for implementing or piloting other court innovations that may be useful in a broader court system context. A business specialty court should be and could be piloted in Iowa within the existing court system framework of the Iowa Judicial Branch. Appendix included as a separate document, is 176 pages.
Resumo:
In June 2009, the Iowa Department of Human Service (IDHS) developed a Child and Family Service Plan (CFSP) that sets forth the Department’s vision and goals to be accomplished for FYs 2010 through 2014. The purpose of the CFSP is to strengthen the States’ overall child welfare system and to facilitate the state’s integration of the programs that serve children and families into a comprehensive and continuum array of child welfare services from prevention and protection through permanency. These programs include title IV-B, subparts 1 and 2 of the Act, the Child Abuse Prevention and Treatment Act (CAPTA), the Chafee Foster Care Independence Program (CFCIP), and the Education and Training Vouchers (ETV) programs for older and/or former foster care youth. IDHS administers the IV-B, CAPTA, CFCIP and the ETV programs described within Iowa’s CFSP. Iowa’s Annual Progress and Services Report (APSR) provides an annual update on the progress made toward accomplishing the goals and objectives identified in the state’s CFSP for the previous fiscal year (2009-2010) and the planned activities for next fiscal year (2010-2011) .
Resumo:
The IPERS plan is a defined benefit pension plan. The lifetime monthly benefit you receive is predictable and stable because it is calculated using a formula. Your benefits grow with you throughout your IPERS-covered employment. As your years of service and salary increase, your IPERS benefits grow too. IPERS, a public agency, was established for the sole purpose of providing a retirement plan to public employees throughout Iowa. As a public agency, IPERS’ goals are aligned with members’. IPERS benefits are designed to supplement personal savings and Social Security benefits in retirement. Benefits also offer financial protection for families in the event of death or disability.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs. In 2001, Iowa DOT and FHWA initiated the Council Bluffs Interstate System (CBIS) Improvements Project. The agencies concluded that the environmental study process would be conducted in two stages; that is, a tiered approach would be applied. The project is being conducted pursuant to the National Environmental Policy Act (NEPA) regulations issued by the Council on Environmental Quality (CEQ), 40 Code of Federal Regulations (CFR) Part 1502.20, and FHWA 23 CFR Part 771.111, that permit tiering for large, complex NEPA studies. Tier 1 is an examination of the overall interstate system improvement needs, including a clear explanation of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation is at a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. Tier 1 includes preparation of a draft and final Environmental Impact Statement (EIS) that would disclose the potential environmental and social effects (evaluated at a planning level that considers a variety of conceptual designs) of the proposed improvements. The final EIS will conclude with a Record of Decision (ROD) that states the preferred plan for improvements to be implemented. Essentially, the Tier 1 document will establish the planning framework for the needed improvements. Because the scope of the overall system improvements is large, the interstate improvements would be implemented as a series of individual projects that fit into the overall planning framework. The Tier 1 Area of Potential Impact, which is discussed in detail in Section 4 is an alternative that considers a combination of the most reasonable concepts that have been developed, buffered by approximately 100 or more feet to ensure that any Tier 2 design modifications would remain inside the outer boundary.
Resumo:
The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.
Resumo:
Five Seasons Transportation & Parking (FSTP) and the Johnson County Council of Governments (JCCOG) are interested in evaluating the feasibility of prospective passenger rail service(s) that would operate over existing trackage of the Cedar Rapids and Iowa City Railway Company (CRANDIC), seen below left, and/or the Iowa Interstate Railroad System (IAIS), seen below right, connecting Cedar Rapids, Iowa City and the Amana Colonies. To perform the study, FSTP and JCCOG selected R.L. Banks & Associates, Inc. (RLBA) as Prime Contractors, HNTB Corporation (HNTB) and Snyder & Associates, Inc. (Snyder) as Subcontractors, hereafter Consultant Team. Both railroads participated in the study and contributed time and resources, as did many local government and civic organizations. The purpose of the study is to determine whether it is feasible to establish regularly scheduled passenger rail service and/or special event excursion rail service, in conjunction with the Five Seasons Transit system, Iowa City Transit, East Central Iowa Transit, Coralville Transit and the University of Iowa CAMBUS.
Resumo:
The 2009 Iowa Railroad System Plan is intended to guide the Iowa Department of Transportation (DOT) in its activities of promoting access to rail transportation, helping to improve the freight railroad transportation system, expanding passenger rail service, and promoting improved safety both on the rail system and where the rail system interacts with people and other transportation modes. The Iowa DOT has been developing railroad transportation plans since the late 1970s. The original plan was prepared in 1978 during a time of crisis in the Iowa railroad system. Several large Iowa railroad carriers had filed for bankruptcy and were reorganizing both their businesses and physical systems. The 1978 plan was a guide for determining which railroad lines the state would partner with to preserve and improve the lines. In the 1970s, 1980s and 1990s, the railroad system mileage in Iowa was reduced from about
Resumo:
This report provides the status of the Passenger Rail Service Revolving Fund and the development and operation of the midwest regional rail system and the state's passenger rail service.
Resumo:
This report provides the status of the Passenger Rail Service Revolving Fund and the development and operation of the midwest regional rail system and the state's passenger rail service.