70 resultados para Temporary river
Resumo:
study of channel catfish in the Mississippi River to determine differences in year class abundance and causative factors
Resumo:
This paper describes the application of the Soil and Water Assessment Tool (SWAT) model to the Maquoketa River watershed, located in northeast Iowa. The inputs to the model were obtained from the Environmental Protection Agency’s geographic information/database system called Better Assessment Science Integrating Point and Nonpoint Sources (BASINS). Climatic data from six weather stations located in and around the watershed, and measured streamflow data from a U.S. Geological Survey gage station at the watershed outlet were used in the sensitivity analysis of SWAT model parameters as well as its calibration and validation for watershed hydrology and streamflow. A sensitivity analysis was performed using an influence coefficient method to evaluate surface runoff and base flow variations in response to changes in model input hydrologic parameters. The curve number, evaporation compensation factor, and soil available water capacity were found to be the most sensitive parameters among eight selected parameters when applying SWAT to the Maquoketa River watershed. Model calibration, facilitated by the sensitivity analysis, was performed for the period 1988 through 1993, and validation was performed for 1982 through 1987. The model performance was evaluated by well-established statistical methods and was found to explain at least 86% and 69% of the variability in the measured stream flow data for the calibration and validation periods, respectively. This initial hydrologic modeling analysis will facilitate future applications of SWAT to the Maquoketa River watershed for various watershed analysis, including water quality.
Resumo:
Audit report on the Great River Regional Waste Authority for the year ended June 30, 2009
Resumo:
Audit report on the Disaster Grants – Public Assistance program of the Iowa River - Flint Creek Levee District in Des Moines County and Louisa County, Iowa for the year ended June 30, 2009
Resumo:
Audit report on the Great River Regional Waste Authority for the year ended June 30, 2010
Resumo:
Public travel by motor vehicles is often necessary in road and street sections that have been officially closed for construction, repair, and/or other reasons. This authorization is permitted in order to provide access to homes and businesses located beyond the point of closure. The MUTCD does address appropriate use of specific regulatory signs at the entrance to closed sections; however, direct guidance for temporary traffic control measures within these areas is not included but may be needed. Interpretation and enforcement of common practices may vary among transportation agencies. For example, some law enforcement officers in Iowa have indicated a concern regarding enforcement and jurisdiction of traffic laws in these areas because the Code of Iowa only appears to address violations on roadways open to “public travel.” Enforcement of traffic laws in closed road sections is desirable to maintain safety for workers and for specifically authorized road users. In addition, occasional unauthorized entry by motor vehicles is experienced in closed road areas causing property damage. Citations beyond simple trespass may be advisable to provide better security for construction sites, reduce economic losses from damage to completed work, and create safer work zones.
Resumo:
Audit report on the Great River Regional Waste Authority for the year ended June 30, 2011
Resumo:
Five Seasons Transportation & Parking (FSTP) and the Johnson County Council of Governments (JCCOG) are interested in evaluating the feasibility of prospective passenger rail service(s) that would operate over existing trackage of the Cedar Rapids and Iowa City Railway Company (CRANDIC), seen below left, and/or the Iowa Interstate Railroad System (IAIS), seen below right, connecting Cedar Rapids, Iowa City and the Amana Colonies. To perform the study, FSTP and JCCOG selected R.L. Banks & Associates, Inc. (RLBA) as Prime Contractors, HNTB Corporation (HNTB) and Snyder & Associates, Inc. (Snyder) as Subcontractors, hereafter Consultant Team. Both railroads participated in the study and contributed time and resources, as did many local government and civic organizations. The purpose of the study is to determine whether it is feasible to establish regularly scheduled passenger rail service and/or special event excursion rail service, in conjunction with the Five Seasons Transit system, Iowa City Transit, East Central Iowa Transit, Coralville Transit and the University of Iowa CAMBUS.
Resumo:
The Missouri River Flood Recovery newsletter is published by the Iowa Homeland Security and Emergency Management Division in cooperation with members of the Missouri River Recovery Coordination Task Force.
Resumo:
The Missouri River Flood Recovery newsletter is published by the Iowa Homeland Security and Emergency Management Division in cooperation with members of the Missouri River Recovery Coordination Task Force.
Resumo:
The Missouri River Flood Recovery newsletter is published by the Iowa Homeland Security and Emergency Management Division in cooperation with members of the Missouri River Recovery Coordination Task Force.
Resumo:
The Missouri River Flood Recovery newsletter is published by the Iowa Homeland Security and Emergency Management Division in cooperation with members of the Missouri River Recovery Coordination Task Force.
Resumo:
The Missouri River Flood Recovery newsletter is published by the Iowa Homeland Security and Emergency Management Division in cooperation with members of the Missouri River Recovery Coordination Task Force.
Resumo:
Audit report on the Great River Regional Waste Authority for the year ended June 30, 2012
Resumo:
Report on a special investigation of the City of Grand River for the period July 1, 2004 through March 7, 2012