Research project HR-231, "Special Surface Preparation Prior to Bituminous Overlay", was initiated in 1982 to study the effectiveness of three different crack fillers in extending pavement life. In particular, this project was designed to determine if any of the fillers could substantially reduce the rate of subsurface deterioration and general deterioration of an asphalt pavement at crack locations. This project also sought to determine the effects of the various crack filling procedures on different thicknesses of bituminous overlays. The three fillers, a fly ash slurry, an emulsion, and a rubberized asphalt mixture, were used along with a control section with no crack filler material on a 2.5 mile section of Cerro Gordo Trunk Route S-25 south of the town of Thornton. This report discusses the construction and performance of each filler material and makes recommendations concerning future use of any of the materials used.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years, ultra-thin whitetopping (UTW) has evolved as a viable rehabilitation technique for deteriorated asphalt cement concrete (ACC) pavement. Numerous UTW projects have been constructed and tested, enabling researchers to identify key elements contributing to their successful performance. These elements include foundation support, the interface bonding condition, portland cement concrete (PCC) overlay thickness, synthetic fiber reinforcement usage, joint spacing, and joint sealing. The interface bonding condition is the most important of these elements. It enables the pavement to act as a composite structure, thus reducing tensile stresses and allowing an ultra-thin PCC overlay to perform as intended. Although the main factors affecting UTW performance have been identified in previous research, neither the impact that external variables have on the elements nor the element interaction have been thoroughly investigated. The objective of this research was to investigate the interface bonding condition between an ultra-thin PCC overlay and an ACC base over time, considering the previously mentioned variables. Laboratory testing and full scale field testing were planned to accomplish the research objective. Laboratory testing involved monitoring interface strains in fabricated PCC/ACC composite test beams subjected to either static or dynamic flexural loading. Variables investigated included ACC surface preparation, PCC thickness, and synthetic fiber reinforcement usage. Field testing involved monitoring PCC/ACC interface stains and temperatures, falling weight deflectometer (FWD) deflection responses, direct shear strengths, and distresses on a 7.2 mile Iowa Department of Transportation (Iowa DOT) UTW project (HR-559). The project was located on Iowa Highway 21 between Iowa Highway 212 and U.S. Highway 6 in Iowa County, near Belle Plaine, Iowa. Variables investigated included ACC surface preparation, PCC thickness, synthetic fiber reinforcement usage, joint spacing, and joint sealing. This report documents the planning, equipment selection, and construction of the project built in 1994.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the years, the Iowa Department of Transportation has established an outstanding network of connector highways across the state of Iowa. Construction and paving of these primary roadways has essentially been completed. Unfortunately, many of these primary highway pavements are reaching their design life and are in need of rehabilitation. The emphasis, therefore, has shifted from the construction of new highways to the maintenance and rehabilitation of existing highways. The Iowa DOT in recent years has become more concerned with preventing the ingress of surface water into the pavement structure. Crack sealing is receiving greater emphasis. Specifications have been modified to require improved low modulus crack and joint sealing materials.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Four Iowa DOT asphalt concrete pavement crack sealing projects were selected to evaluate the benefits of heat lance crack preparation. Two, one-half mile sections, both with and without heat lance preparation, were constructed in Story, Monroe, Clinton and Wayne Counties in 1991 and 1992. They were visually evaluated annually from 1992 through 1996. The heat lance preparation did not yield improved seal performance or extended longevity. There was no perceivable difference between crack sealing with and without heat lance preparation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Standard Specifications for this project included requirements for placing two 500 foot test sections of Type B asphaltic concrete with 1-1/2 per cent asbestos fibres (mix size 3/8 inch, lift thickness 3/4 inch) as part of the regular construction of the surface course. These requirements were designed to provide asbestos modified mixtures for laboratory analysis and road performance evaluation. This report provides the preliminary results and analysis of test data obtained from tests on the mixtures placed on the roadway. Previous research by G. S. Zuelke (1) and J. H. Kestzman et al (2) indicated that asphaltic concrete mixtures modified with asbestos fibres improved stability, decreased permeability, and allowed the use of higher bitumen contents. This study indicated that the addition of asbestos fibres would permit the use of higher bitumen contents, theoretically improving durability, without adverse results. An indication was also obtained to the effect that asbestos mixtures were more difficult to compact in the field.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this research was to evaluate the performance of portland cement concrete pavement contraction joints utilizing a variety of sealants and joint preparations and to identify an effective sealant system. The variables evaluated were: (1) sealant material; (2) joint preparation; (3) size of saw cut (sealant reservoir); and (4) the use of backing material. This progress report contains project results to date.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In some asphaltic concrete mixes asphalt absorption in field mixes is difficult to predict by the routine mix design tests presently being used. Latent or slow absorption in hot mixes is hard to compensate for in field control due to aggregate gradations being near maximum density. If critical asphalt need could be changed by increasing voids in the mineral aggregate so that more freedom could be exercised in compensating for the absorption, this may aid in design. The voids in the mineral aggregate can be related to composite gradation of total aggregate in a mixture, i.e. if a composite gradation of aggregate is finer than that of maximum density curve, the V.M.A. will be greater than that of a mix of maximum density. The typical gradation of Iowa Type 'A' mixes is finer than a gradation which is near the centerline of the specification at sieves larger than the No. 30 and coarser at the lower sieve sizes. The mixes of the typical gradation will have higher V.M.A. than those of the near centerline mixes. By studying properties of the mixes of the typical gradation and comparing them with those of the mixes of maximum density, it may aid in the modification and simplification of our present testing methods and specification requirements while still maintaining control of quality of the mix by controlling voids, stability, gradation and asphalt content.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Friction testing of pavements has been a continuing effort by the Iowa Department of Transportation since 1969. This report details results of tests of asphaltic concrete pavements on the primary and interstate road systems. Both sprinkle treated and non-sprinkle treated pavements placed between 1975 - 1985 are included. A total of 1785 miles representing 216 separate paving projects were examined. The effect of fog sealing sprinkle treated pavements was studied by testing friction levels before and after the application of the fog seals. Conclusions of the report are: 1. Current aggregate selection criteria for a.c. pavement surface courses provides adequate friction levels through 10 years and should remain effective through a 15 year design life. 2. Sprinkle treatment of pavements has, for the most part, provided macrotexture in the pavement surface as evidenced by smooth tire testing. 3. Fog sealing sprinkle treated pavements does not significantly alter the friction properties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As of December 31, 1970 there were 57,270 miles of Local Secondary roads and 32,958 miles of Farm to Market roads in the Iowa secondary road system. The Local Secondary system carried a traffic load of 2,714,180 daily vehicle miles, accounting for 32% of all traffic in the secondary system. For all Local Secondary roads having some form of surfacing, 98% were surfaced with gravel or crushed stone. During the 1970 construction year 335 miles of surfaced roads were constructed in the Local Secondary system with 78% being surfaced with gravel or crushed stone. The total maintenance expenditure for all secondary roads in Iowa during 1970 amounted to $40,086,091. Of this, 42%, or $17,020,332, was spent for aggregate replacement on existing gravel or crushed stone roads with an additional 31% ($12,604,456) being spent on maintenance other than resurfacing. This amounts to 73% of the total maintenance budget and are the largest two maintenance expenditure items out of a list of 10 ranging from bridges to drainage assessments. The next largest item was 7%, for maintenance of existing flexible bases. Three concurrent phases of study were included in this project: (1) laboratory screenings studies of various additives thought to have potential for long-lasting dust palliation, soil additive strength, durability, and additive retention potential; (2) test road construction using those additives that indicated promise for performance-serviceability usage; and (3) observations and tests of constructed sections for evaluation of the additive's contribution to performance and serviceability as well as the relationship to initial costs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A combined study of dust control and low-cost surface improvements of soil and aggregate materials for immediate (and intermediate) use as a treated surface course is being conducted in three concurrent phases: (1) laboratory screening of various additives thought to have potential for long-lasting dust palliation, soil-additive strength, durability, and additive retention potential; (2) test road construction, using those additives from the screening studies that indicate promise for performance and serviceability; and (3) observation and tests of constructed sections for evaluation of the additive's contribution to performance and serviceability as well as relationship to initial costs. A brief review is presented of the problem, some methods of measuring it, previously adopted approaches to it, project field tests and a portion of the results thus far, and portions of the laboratory work accomplished in the screening studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Six subject areas prompted the broad field of inquiry of this mission-oriented dust control and surface improvement project for unpaved roads: • DUST--Hundreds of thousands of tons of dust are created annually by vehicles on Iowa's 70,000 miles of unpaved roads and streets. Such dust is often regarded as a nuisance by Iowa's highway engineers. • REGULATIONS--Establishment of "fugitive dust" regulations by the Iowa DEQ in 1971 has created debates, conferences, legal opinions, financial responsibilities, and limited compromises regarding "reasonable precaution" and "ordinary travel," both terms being undefined judgment factors. • THE PUBLIC--Increased awareness by the public that regulations regarding dust do in fact exist creates a discord of telephone calls, petitions, and increasing numbers of legal citations. Both engineers and politicians are frustrated into allowing either the courts or regulatory agencies to resolve what is basically a professional engineering responsibility. • COST--Economics seldom appear as a tenet of regulatory strategies, and in the case of "fugitive dust," four-way struggles often occur between the highway professions, political bodies, regulatory agencies, and the general public as to who is responsible, what can be done, how much it will cost, or why it wasn't done yesterday. • CONFUSION--The engineer lacks authority, and guidelines and specifications to design and construct a low-cost surf acing system are nebulous, i.e., construct something between the present crushed stone/gravel surface and a high-type pavement. • SOLUTION--The engineer must demonstrate that dust control and surface improvement may be engineered at a reasonable cost to the public, so that a higher degree of regulatory responsibility can be vested in engineering solutions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Concern about premature joint sealant failures occurring in portland cement concrete (PCC) pavements gave impetus to initiating this research project. Eight sealants, including three silicone sealants, were evaluated and tested in the lab as well as incorporated in approximately 700 joints in the field and evaluated over a six-year period. The preliminary data show that among the silicone sealants, Dow Corning 888 rated the highest. However, this was rated third overall behind the W. R. Meadows cold-applied Sof Seal and Crafco #231 hot pour sealants. The W. R. Meadows and Crafco sealants cost approximately 30 percent and 50 percent less to furnish and place than the Dow Corning product. All joint sealants will continue to be evaluated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project covered a wide range of activities that allowed researchers to understand the relationship between stability, pavement distress, and recycled portland cement concrete (RPCC) subbase aggregate materials. Detailed laboratory and field tests, including pavement distress surveys, were conducted at 26 sites in Iowa. Findings show that specific gravities of RPCC are lower than those of crushed limestone. RPCC aggregate material varies from poorly or well-graded sand to gravel. A modified Micro-Deval test procedure showed that abrasion losses of virgin aggregate materials were within the maximum Micro-Deval abrasion loss of 30% recommended by ASTM D6028-06. Micro-Deval abrasion loss of RPCC aggregate materials, however, was much higher than that of virgin materials and exceeded 30% loss. Modulus of elasticity of RPCC subbase materials is high but variable. RPCC subbase layers normally have low permeability. The pavement surfaces for both virgin and RPCC subbase across Iowa were evaluated to fulfill the objectives of this study related to field evaluation. Visual distress surveys were conducted to gather the detailed current pavement condition information including the type, extent, and severity of the pavement distresses. The historical pavement condition information for the surveyed field sections was extracted from the Iowa DOT's Pavement Management Information System (PMIS). The current surface condition of existing field pavements with RPCC subbase was compared with the virgin aggregate subbase sections using two different approaches. The changes in pavement condition indices (PCI and IRI) with time for both types of pavements (subbases) were compared.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cities and counties in Iowa have more than 8,890 steel bridges, most of which are painted with red lead paint. The Iowa Department of Transportation (Iowa DOT) maintains less than 35 bridges coated with red lead paint, including seven of the large border bridges over the Mississippi and Missouri Rivers. Because of the federal and state regulations for bridge painting, many governmental agencies have opted not to repaint, or otherwise maintain, lead paint coatings. Consequently, the paint condition on many of these bridges is poor, and some bridges are experiencing severe rusting of structural members. This research project was developed with two objectives: 1) to evaluate the effectiveness of preparing the structural steel surface of a bridge with high pressure water jetting instead of abrasive blasting and 2) to coat the structural steel surface with a moisture-cured polyurethane paint under different surface preparation conditions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Wet pavement friction is known to be one of the most important roadway safety parameters. In this research, frictional properties of flexible (asphalt) pavements were investigated. As a part of this study, a laboratory device to polish asphalt specimens was refined and a procedure to evaluate mixture frictional properties was proposed. Following this procedure, 46 different Superpave mixtures, one stone matrix asphalt (SMA) mixture and one porous friction course (PFC) mixture were tested. In addition, 23 different asphalt and two concrete field sections were also tested for friction and noise. The results of both field and laboratory measurements were used to develop an International Friction Index (IFI)-based protocol for measurement of the frictional characteristics of asphalt pavements for laboratory friction measurements. Based on the results of the study, it appears the content of high friction aggregate should be 20% or more of the total aggregate blend when used with other, polish susceptible coarse aggregates; the frictional properties increased substantially as the friction aggregate content increased above 20%. Both steel slag and quartzite were found to improve the frictional properties of the blend, though steel slag had a lower polishing rate. In general, mixes containing soft limestone demonstrated lower friction values than comparable mixes with hard limestone or dolomite. Larger nominal maximum aggregate size mixes had better overall frictional performance than smaller sized mixes. In addition, mixes with higher fineness moduli generally had higher macrotexture and friction.