45 resultados para Street cleaning.
Resumo:
News from the Iowa Downtown Resource Center and Main Street Iowa office.
Resumo:
Methamphetamine (meth) drug labs are not a new hazard to Iowa. In 2004, federal, state and local authorities seized more than 1,400 Iowa labs. These labs are discovered in houses, apartments, motel rooms, motor vehicles, and even an occasional combine. A dramatic decrease in the number of meth labs occurred in 2005 when a law restricting the purchase of pseudoephedrine was implemented. Although the number of meth labs has decreased, they continue to exist. Since there is currently no official federal guidance or regulations on how to clean up a former meth lab, the Iowa Department of Public Health, Division of Environmental Health, has created these basic guidelines to assist public health officials, property owners and the general public in cleaning up former meth lab properties.
Resumo:
Main Street Messenger is a newsletter about the happenings that area going on in towns across Iowa. From shows to the start fair information this newsletter has many great informational pieces about Iowa towns.
Resumo:
Main Street Iowa News from the Iowa Downtown Resource Center of the Iowa Department of Economic Development
Resumo:
The Main Street Four Point Approach® is a proven development process and has provided both focus and opportunity to Iowa’s participating cities. Collectively, these progressive communities have documented thousands of volunteer hours and millions of dollars in private investment into the revitalization of their historic city centers.
Resumo:
News from Main Street Iowa
Resumo:
News from Main Street Iowa and the Iowa Downtown Resource Center
Resumo:
The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.
Resumo:
News from the Iowa Downtown Resource Center, Main Street Iowa
Resumo:
Culverts are common means to convey flow through the roadway system for small streams. In general, larger flows and road embankment heights entail the use of multibarrel culverts (a.k.a. multi-box) culverts. Box culverts are generally designed to handle events with a 50-year return period, and therefore convey considerably lower flows much of the time. While there are no issues with conveying high flows, many multi-box culverts in Iowa pose a significant problem related to sedimentation. The highly erosive Iowa soils can easily lead to the situation that some of the barrels can silt-in early after their construction, becoming partially filled with sediment in few years. Silting can reduce considerably the capacity of the culvert to handle larger flow events. Phase I of this Iowa Highway Research Board project (TR-545) led to an innovative solution for preventing sedimentation. The solution was comprehensively investigated through laboratory experiments and numerical modeling aimed at screening design alternatives and testing their hydraulic and sediment conveyance performance. Following this study phase, the Technical Advisory Committee suggested to implement the recommended sediment mitigation design to a field site. The site selected for implementation was a 3-box culvert crossing Willow Creek on IA Hwy 1W in Iowa City. The culvert was constructed in 1981 and the first cleanup was needed in 2000. Phase II of the TR 545 entailed the monitoring of the site with and without the selfcleaning sedimentation structure in place (similarly with the study conducted in laboratory). The first monitoring stage (Sept 2010 to December 2012) was aimed at providing a baseline for the operation of the as-designed culvert. In order to support Phase II research, a cleanup of the IA Hwy 1W culvert was conducted in September 2011. Subsequently, a monitoring program was initiated to document the sedimentation produced by individual and multiple storms propagating through the culvert. The first two years of monitoring showed inception of the sedimentation in the first spring following the cleanup. Sedimentation continued to increase throughout the monitoring program following the depositional patterns observed in the laboratory tests and those documented in the pre-cleaning surveys. The second part of Phase II of the study was aimed at monitoring the constructed self-cleaning structure. Since its construction in December 2012, the culvert site was continuously monitored through systematic observations. The evidence garnered in this phase of the study demonstrates the good performance of the self-cleaning structure in mitigating the sediment deposition at culverts. Besides their beneficial role in sediment mitigation, the designed self-cleaning structures maintain a clean and clear area upstream the culvert, keep a healthy flow through the central barrel offering hydraulic and aquatic habitat similar with that in the undisturbed stream reaches upstream and downstream the culvert. It can be concluded that the proposed self-cleaning structural solution “streamlines” the area upstream the culvert in a way that secures the safety of the culvert structure at high flows while producing much less disturbance in the stream behavior compared with the current constructive approaches.
Resumo:
Video from the Iowa Department of Transportation about the construction and remodel of the Benton Street Bridge in Iowa City. This video is a interview of Samuel Cartsens interviewed but Hank Zeletel the Librarian of the DOT at the time the video was produced.
Resumo:
The objective of this research was to evaluate two experimental D.S. Brown, Type SL450 and one D.S. Brown, Type SL750 expansion assemblies to identify possible construction problems and to determine the long term performances. These joints were installed in Wapello County on Jefferson Street viaduct in Ottumwa, Iowa. Visual inspections were made yearly. There is an indication that there may be a slow leakage at all three joints. The joint assemblies have performed well.
Resumo:
Methamphetamine (meth) drug labs are not a new hazard to Iowa. In 2004, federal, state and local authorities seized more than 1,400 Iowa labs. These labs are discovered in houses, apartments, motel rooms, motor vehicles, and even an occasional combine. A dramatic decrease in the number of meth labs occurred in 2005 when a law restricting the purchase of pseudo-ephedrine was implemented. Although the number of meth labs has decreased, they continue to exist. Since there is currently no official federal guidance or regulations on how to clean up a former meth lab, the Iowa Department of Public Health, Division of Environmental Health, has created these basic guidelines to assist public health officials, property owners and the general public in cleaning up former meth lab properties.
Resumo:
News from the Iowa Downtown Resource Center, Main Street Iowa
Resumo:
News from the Iowa Downtown Resource Center, Main Street Iowa