62 resultados para Storm surges
Resumo:
In anticipation of regulation involving numeric turbidity limit at highway construction sites, research was done into the most appropriate, affordable methods for surface water monitoring. Measuring sediment concentration in streams may be conducted a number of ways. As part of a project funded by the Iowa Department of Transportation, several testing methods were explored to determine the most affordable, appropriate methods for data collection both in the field and in the lab. The primary purpose of the research was to determine the exchangeability of the acrylic transparency tube for water clarity analysis as compared to the turbidimeter.
Resumo:
According to the 1972 Clean Water Act, the Environmental Protection Agency (EPA) established a set of regulations for the National Pollutant Discharge Elimination System (NPDES). The purpose of these regulations is to reduce pollution of the nation’s waterways. In addition to other pollutants, the NPDES regulates stormwater discharges associated with industrial activities, municipal storm sewer systems, and construction sites. Phase II of the NPDES stormwater regulations, which went into effect in Iowa in 2003, applies to construction activities that disturb more than one acre of ground. The regulations also require certain communities with Municipal Separate Storm Sewer Systems (MS4) to perform education, inspection, and regulation activities to reduce stormwater pollution within their communities. Iowa does not currently have a resource to provide guidance on the stormwater regulations to contractors, designers, engineers, and municipal staff. The Statewide Urban Design and Specifications (SUDAS) manuals are widely accepted as the statewide standard for public improvements. The SUDAS Design manual currently contains a brief chapter (Chapter 7) on erosion and sediment control; however, it is outdated, and Phase II of the NPDES stormwater regulations is not discussed. In response to the need for guidance, this chapter was completely rewritten. It now escribes the need for erosion and sediment control and explains the NPDES stormwater regulations. It provides information for the development and completion of Stormwater Pollution Prevention Plans (SWPPPs) that comply with the stormwater regulations, as well as the proper design and implementation of 28 different erosion and sediment control practices. In addition to the design chapter, this project also updated a section in the SUDAS Specifications manual (Section 9040), which describes the proper materials and methods of construction for the erosion and sediment control practices.
Resumo:
Blowing snow can cause significant problems for mobility and safety during winter weather in three distinct ways. It may drift onto the road, thus requiring almost continuous plowing while the wind is blowing (which may occur when a given winter storm is over). Snow may drift onto wet pavement (perhaps caused by ice control chemicals) and dilute out the chemicals on the road, creating ice on the road. And sufficient blowing snow can cause a major deterioration in visibility on the road, a factor which has been shown to be significant in winter crashes. The problem of blowing snow can be very effectively addressed by creating a snow storage device upwind of the road that requires protection from snow drifting. Typically, these storage devices are fences. Extensive design guidance exists for the required height and placement of such fences for a given annual snowfall and given local topography. However, the design information on the placement of living snow fences is less complete. The purpose of this report is to present the results of three seasons of study on using standing corn as snow fences. In addition, the experience of using switch grass as a snow storage medium is also presented. On the basis of these experimental data, a design guide has been developed that makes use of the somewhat unique snow storage characteristics of standing corn snow fences. The results of the field tests on using standing corn showed that multiple rows of standing corn store snow rather differently than a traditional wooden snow fence. Specifically, while a traditional fence stores most of the snow downwind from the fence (and thus must be placed a significant distance upwind of the road to be protected, specifically at least 35 times the snow fence height) rows of standing corn store the majority of the snow within the rows. Results from the three winters of testing show that the standing corn snow fences can store as much snow within the rows of standing corn as a traditional fence of typical height for operation in Iowa (4 to 6 feet) can store. This finding is significant because it means that the snow fences can be placed at the edge of the farmer’s field closest to the road, and still be effective. This is typically much more convenient for the farmer and thus may mean that more farmers would be willing to participate in a program that uses standing corn than in traditional programs. ii On the basis of the experimental data, design guidance for the use of standing corn as a snow storage device in Iowa is given in the report. Specifically, it is recommended that if the fetch in a location to be protected is less than 5,000 feet, then 16 rows of standing corn should be used, at the edge of the field adjacent to the right of way. If the fetch is greater than 5,000 feet, then 24 rows of standing corn should be used. This is based on a row spacing of 22 inches. Further, it should be noted that these design recommendations are ONLY for the State of Iowa. Other states of course have different winter weather and without extensive further study, it cannot be said that these guidelines would be effective in other locations with other winter conditions.
Resumo:
FY2008 was a productive year for the Iowa Grape and Wine Development Commission. Sixteen proposals were recommended for funding from FY2008 funds and carryover totaling just over $396,000 in outlays. Included in the approved proposals were staffing and equipment for the Midwest Grape and Wine Industry Institute’s wine diagnostics laboratory at Iowa State University, continued support for the viticulturist position at Des Moines Area Community College, funding for the second annual Mid-American Wine Competition, and assistance for marketing and promotion of Ice coats an Iowa vineyard after a February 2008 ice storm. Photo by Mike White and courtesy of Iowa State University. 16 two wine trail associations and seven festivals and events. Commission funding supported a salaried position within IDALS to manage the Iowa Grape and Wine Development Fund and to serve as the Director of the Iowa Grape and Wine Development Commission. The Commission approved funding for a Scholarship Program. The formally created Scholarship Committee met twice in FY2008 to finalize details for the Program and to approve scholarships to twenty-six applicants to aid with the expenses of accredited coursework. Based on data collected by IDALS, the Iowa Department of Economic Development, the Iowa Alcoholic Beverages Division, and Iowa State University the Iowa grape and wine industry appears to continue to be very viable and growth continues at a strong pace. Presently, Iowa ranks 14th in the nation for the number of wineries, and wine produced in the state for 2008 was estimated at a market value in excess of $14.0 million. A tabulation of the budget revealed that just over $1,080,000 in wine gallonage tax appropriations and legislative appropriations have been deposited into the Grape and Wine Development Fund from FY2003 through FY2008. Removing encumbered funds, expenditures have totaled just over $942,500 during that same time. “Financial” funding – used for fostering public awareness and participation of industry events - increased from 6% of expenditures in FY2007 to 9% in FY2008. Used for support of research, education, and outreach, a little over 80% of expenditures and encumbered funds were earmarked for “Technical” spending. Over time, funds invested in “Technical” programs will translate into an increasingly educated and institutionally-supported industry. Local, regional, and statewide events also appeared to be increasing in popularity. The Commission was encouraged to see increased support for these events. It is hoped, too, that the Scholarship Program will provide needed funding to help meet the educational goals of the industry’s workforce. As they continue to support Iowa’s grape and wine industry, the Commissioners look forward to working with individuals, commercial enterprises, state and federal agencies, and industry-sponsored institutions in FY2009 and in years to come.
Resumo:
The purpose of this Iowa manual is to serve as a guide, provide solutions, and offer suggestions on construction sites to comply with Iowa's current soil erosion and storm water runoff regulations. This need is particularly important when land undergoes a land use change. Information provided in this manual will be helpful to land owners, developers, consultants, contractors, planners, local government, as well as the general public. This manual is intended to provide techniques that will meet the mandates of current legislation. Innovations that will benefit the user and still provide effective control are encouraged.
Resumo:
Highlights: * U.S. Labor Secretary Hilda Solis visited Iowa at the end of July....pg. 2 * The Shoes for Veterans campaign began following a visit to a homeless shelter in the Quad Cities....pg. 2 * Are You Prepared? An emergency – be it a flood, tornado, winter storm or power outage – can occur quickly and without warning...pg. 3 * The Southwest Iowa Employers’ Council & Iowa Workforce Development in conjunction with the Iowa Committee for ESGR will present two valuable training sessions for businesses.....pg. 3
Resumo:
The leading cause of death during winter storms is transportation accidents. Preparing your vehicle for the winter season and knowing how to react if stranded or lost on the road are the keys to safe winter driving.
Resumo:
One of the challenges that faces the winter maintainer is how much chemical to apply to the road under given conditions. Insufficient chemical can lead to the road surface becoming slick, and the road thus becoming unsafe. In all likelihood, additional applications will have to be made, requiring additional effort and use of resources. However, too much chemical can also be bad. While an excess of chemical will ensure (in most circumstances) that a safe road condition is achieved, it may also result in a substantial waste of chemical (with associated costs for this waste) and in ancillary damage to the road itself and to the surrounding environment. Ideally, one should apply what might be termed the “goldilocks” amount of chemical to the road: Not too much, and not too little, but just right. Of course the reality of winter maintenance makes achieving the “goldilocks” application rate somewhat of a fairy tale. In the midst of a severe storm, when conditions are poor and getting worse, the last thing on a plow operator’s mind is a minute adjustment in the amount of chemical being applied to the road. However, there may be considerable benefit and substantial savings to be achieved if chemical applications can be optimized to some degree, so that wastage is minimized without compromising safety. The goal of this study was to begin to develop such information through a series of laboratory studies in which the force needed to scrape ice from concrete blocks was measured, under a variety of chemical application conditions.
Resumo:
The leading cause of death during winter storms is transportation accidents. Preparing your vehicle for the winter season and knowing how to react if stranded or lost on the road are the keys to safe winter driving.
Resumo:
This report documents Phase IV of the Highway Maintenance Concept Vehicle (HMCV) project, a pooled fund study sponsored by the Departments of Transportation of Iowa, Pennsylvania, and Wisconsin. This report provides the background, including a brief history of the earlier phases of the project, a systems overview, and descriptions of the research conducted in Phase IV. Finally, the report provides conclusions and recommendations for future research. Background The goal of the Highway Maintenance Concept Vehicle Pooled Fund Study is to provide travelers with the level of service defined by policy during the winter season at the least cost to taxpayers. This goal is to be accomplished by using information regarding actual road conditions to facilitate and adjust snow and ice control activities. The approach used in this study was to bring technology applications from other industries to the highway maintenance vehicle. This approach is evolutionary in that as emerging technologies and applications are found to be acceptable to the pooled fund states and as they appear that to have potential for supporting the study goals they become candidates for our research. The objective of Phase IV is to: Conduct limited deployment of selected technologies from Phase III by equipping a vehicle with proven advanced technologies and creating a mobile test laboratory for collecting road weather data. The research quickly pointed out that investments in winter storm maintenance assets must be based on benefit/cost analysis and related to improving level of service. For example, Iowa has estimated the average cost of fighting a winter storm to be about $60,000 to $70,000 per hour typically. The maintenance concept vehicle will have advanced technology equipment capable of applying precisely the correct amount of material, accurately tailored to the existing and predicted pavement conditions. Hence, a state using advanced technology could expect to have a noticeable impact on the average time taken to establish the winter driving service level. If the concept vehicle and data produced by the vehicle are used to support decision-making leading to reducing material usage and the average time by one hour, a reasonable benefit/cost will result. Data from the friction meter can be used to monitor and adjust snow and ice control activities and inform travelers of pavement surface conditions. Therefore, final selection of successfully performing technologies will be based on the foundation statements and criteria developed by the study team.
Resumo:
Pieces of Iowa’s Past, published by the Iowa State Capitol Tour Guides weekly during the legislative session, features historical facts about Iowa, the Capitol, and the early workings of state government. All historical publications are reproduced here with the actual spelling, punctuation, and grammar retained. THIS WEEK: 1973 Iowa Spring Snow Storm Hits the First Quarter of the Year; the U.S. Energy Crisis Hits the Last Quarter of the Year BACKGROUND: 65TH IOWA GENERAL ASSEMBLY The Sixty-fifth General Assembly was the third General Assembly to meet annually. Prior to the Sixty-third General Assembly, the Iowa Legislature met biennially. The first year of the Sixty-fifth General Assembly convened January 8 and adjourned June 24, 1973—a 168-day session. The second year of the Sixty-fifth General Assembly convened January 14 and adjourned May 4, 1974—a 111-day session. There were 22 Democratic members in the Senate and 44 Democratic members in the House of Representatives. There were 28 Republican members in the Senate and 56 Republican members in the House—a total of 150 legislators. Lieutenant Governor Arthur Neu was presiding in the Senate and Andrew Varley was the Speaker of the House of Representatives. Robert Ray was Iowa’s Governor, having been inaugurated for his first term January 16, 1969, at the age of 40. The 1970 federal census showed Iowa’s population at 2,825,368.
Resumo:
It is intuitively obvious that snow or ice on a road surface will make that surface more slippery and thus more hazardous. However, quantifying this slipperiness by measuring the friction between the road surface and a vehicle is rather difficult. If such friction readings could be easily made, they might provide a means to control winter maintenance activities more efficiently than at present. This study is a preliminary examination of the possibility of using friction as an operational tool in winter maintenance. In particular, the relationship of friction to traffic volume and speed, and accident rates is examined, and the current lack of knowledge in this area is outlined. The state of the art of friction measuring techniques is reviewed. A series of experiments whereby greater knowledge of how friction deteriorates during a storm and is restored by treatment is proposed. The relationship between plowing forces and the ice-pavement bond strength is discussed. The challenge of integrating all these potential sources of information into a useful final product is presented together with a potential approach. A preliminary cost-benefit analysis of friction measuring devices is performed and suggests that considerable savings might be realized if certain assumptions should hold true. The steps required to bring friction from its current state as a research tool to full deployment as an operational tool are presented and discussed. While much remains to be done in this regard, it is apparent that friction could be an extremely effective operational tool in winter maintenance activities of the future.
Resumo:
Snow removal on the 90,000 mile Iowa secondary road system is a major concern of county engineers. Rural residents rely almost entirely on motor vehicles for travel. They have come to expect passable roads during all types of weather and as most county engineers know, the public is less tolerant of problems in snow removal than in any other highway department function. To avoid snow removal problems, maintenance personnel begin preparation before the winter maintenance season. The slide tape presentation, "Snow Removal on Iowa's Secondary Roads", was developed to assist in training and retraining maintenance personnel each year prior to winter. The program covers preparation for winter, snow and ice removal, and after storm care of equipment.
Resumo:
Severe flooding occurred during July 19-25, 1999, in the Wapsipinicon and Cedar River Basins following two thunderstorms over northeast Iowa. During July 18-19, as much as 6 inches ofrainfall was centered over Cerro Gordo, Floyd, Mitchell, and Worth Counties. During July 20-21, a second storm occurred in which an additional rainfall of as much as 8 inches was centered over Chickasaw and Floyd Counties. The cumulative effect of the storms produced floods with new maximum peak discharges at the following streamflow-gaging stations: Wapsipinicon River near Tripoli, 19,400 cubic feet per second; Cedar River at Charles City, 31,200 cubic feet per second (recurrence interval about 90 years); Cedar River at Janesville, 42,200 cubic feet per second (recurrence interval about 80 years); and Flood Creek near Powersville, 19,000 cubic feet per second. Profiles of flood elevations for the July 1999 flood are presented in this report for selected reaches along the Wapsipinicon, Cedar, and Shell Rock Rivers and along Flood Creek. Information about the river basins, rain storms, and flooding are presented along with information on temporary bench marks and reference points in the Wapsipinicon and Cedar River Basins.