This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dr. Gilbert Y. Baladi of Michigan State University has developed a new device intended for reliable determination of asphalt concrete mechanical properties such as Poisson's ratio, resilient modulus, and indirect tensile strength. The device is the result of an effort to improve upon procedures and equipment currently available for evaluation of mechanical properties. A duplicate of this device was fabricated in the Iowa Department of Transportation, Materials Lab Machine Shop in 1989. This report details the results of an evaluation of the effectiveness of the device in testing Marshall specimens for indirect tensile strength as compared to results obtained with standard equipment described in AASHTO T-283. Conclusions of the report are: l. Results obtained with the Baladi device average 6 to 8 percent higher than those obtained with the standard device. 2. The standard device exhibited a slightly greater degree of precision than did the Baladi device. 3. The Baladi device is easier and quicker to use than the standard apparatus. 4. It may be possible to estimate indirect tensile strength from the stability/flow ratio by dividing by factors of 1.8 and 1.5 for 50 blow and 75 blow mixes respectively.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Currently, individuals including designers, contractors, and owners learn about the project requirements by studying a combination of paper and electronic copies of the construction documents including the drawings, specifications (standard and supplemental), road and bridge standard drawings, design criteria, contracts, addenda, and change orders. This can be a tedious process since one needs to go back and forth between the various documents (paper or electronic) to obtain information about the entire project. Object-oriented computer-aided design (OO-CAD) is an innovative technology that can bring a change to this process by graphical portrayal of information. OO-CAD allows users to point and click on portions of an object-oriented drawing that are then linked to relevant databases of information (e.g., specifications, procurement status, and shop drawings). The vision of this study is to turn paper-based design standards and construction specifications into an object-oriented design and specification (OODAS) system or a visual electronic reference library (ERL). Individuals can use the system through a handheld wireless book-size laptop that includes all of the necessary software for operating in a 3D environment. All parties involved in transportation projects can access all of the standards and requirements simultaneously using a 3D graphical interface. By using this system, users will have all of the design elements and all of the specifications readily available without concerns of omissions. A prototype object-oriented model was created and demonstrated to potential users representing counties, cities, and the state. Findings suggest that a system like this could improve productivity to find information by as much as 75% and provide a greater sense of confidence that all relevant information had been identified. It was also apparent that this system would be used by more people in construction than in design. There was also concern related to the cost to develop and maintain the complete system. The future direction should focus on a project-based system that can help the contractors and DOT inspectors find information (e.g., road standards, specifications, instructional memorandums) more rapidly as it pertains to a specific project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Soil consolidation and erosion caused by roadway runoff have exposed the upper portions of steel piles at the abutments of numerous bridges, leaving them susceptible to accelerated corrosion rates due to the abundance of moisture, oxygen, and chlorides at these locations. This problem is compounded by the relative inaccessibility of abutment piles for close-up inspection and repair. The objective of this study was to provide bridge owners with recommendations for effective methods of addressing corrosion of steel abutment piles in existing and future bridges A review of available literature on the performance and protection of steel piles exposed to a variety of environments was performed. Eight potential coating systems for use in protecting existing and/or new piles were selected and subjected to accelerated corrosion conditions in the laboratory. Two surface preparation methods were evaluated in the field and three coating systems were installed on three piles at an existing bridge where abutment piles had been exposed by erosion. In addition, a passive cathodic protection (CP) system using sacrificial zinc anodes was tested in the laboratory. Several trial flowable mortar mixes were evaluated for use in conjunction with the CP system. For existing abutment piles, application of a protective coating system is a promising method of mitigating corrosion. Based on its excellent performance in accelerated corrosion conditions in the laboratory on steel test specimens with SSPC-SP3, -SP6, and -SP10 surface preparations, glass flake polyester is recommended for use on existing piles. An alternative is epoxy over organic zinc rich primer. Surface preparation of existing piles should include abrasive blast cleaning to SSPC-SP6. Although additional field testing is needed, based on the results of the laboratory testing, a passive CP system could provide an effective means of protecting piles in existing bridges when combined with a pumped mortar used to fill voids between the abutment footing and soil. The addition of a corrosion inhibitor to the mortar appears to be beneficial. For new construction, shop application of thermally sprayed aluminum or glass flake polyester to the upper portion of the piles is recommended.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Bridge construction projects are becoming increasingly complex as the demand for context-sensitive solutions, aesthetic designs, and accelerated bridge construction becomes more prevalent. In addition, the Iowa Department of Transportation (Iowa DOT) is entering a phase of design and construction of large border bridges, such as the I-80 (let 2008 for $56 million) and US 34 bridges over the Missouri River and I-74 over the Mississippi River. Compared to typical construction projects, these bridges generate more contractor Requests for Information (RFIs), Value Engineering (VE) proposals, Requests for Changes (RFCs), and shop drawings. Management of these submittals is a significant challenge for Resident Construction Engineers (RCEs) and other Iowa DOT staff. In addition, some submittals require cross-departmental and project consultant reviews. Commercially available software exists for managing submittals and project collaboration teams; in-house solutions may also be possible. Implementation is intended to speed construction submittal review time, reduce incidence of delay claims, and free up Iowa DOT staff from project management administrative tasks. Researchers from Iowa State University working with the Iowa DOT conducted a multi-pronged approach to indentify a web-based collaboration solution for Iowa DOT bridge projects. An investigation was launched to determine the functional needs of the Iowa DOT. Commercially available software programs were also evaluated to find what functionality is currently available. A Request for Proposals (RFP) was written to select a commercial web-based collaboration solution for pilot testing. In the second phase of research, a solution will be selected and implemented on two pilot projects. Lessons learned from these pilot projects will assist the Iowa DOT in developing and implementing a long-term solution to improve the management of Iowa DOT bridge projects.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report describes the first phase in a project to develop an electronic reference library (ERL) to help Iowa transportation officials efficiently access information in critical and heavily used documents. These documents include Standard Specifications for Bridge and Highway Construction (hereinafter called Standard Specifications), design manuals, standard drawings, the Construction Manual, and Material Instruction Memoranda (hereinafter called Material IMs). Additional items that could be included to enhance the ERL include phone books, letting dates, Internet links, computer programs distributed by the Iowa Department of Transportation (DOT), and local specifications, such as the Urban Standard Specifications of Public Improvements. All cross-references should be hyper linked, and a search engine should be provided. Revisions noted in the General Supplemental Specifications (hereinafter called the Supplemental Specifications) should be incorporated into the text of the Standard Specifications. The Standard Specifications should refer to related sections of other documents, and there should be reciprocal hyper links in those other documents. These features would speed research on critical issues and save staff time. A master plan and a pilot version were both developed in this first phase of the ERL.