23 resultados para Serra do Mar State Park


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Viking Lake State Park is beautiful resource which has been special to residents of Southwest Iowa and visitors from around the region. Unfortunately, Viking Lake itself is being impacted by non-point source pollution. Water quality conditions are becoming the reason that visitors are shying away from the park instead of flocking to it. To combat these non-point source problems the Viking Lake Water Quality Project has been initiated and $327,000 has been allocated through the Section 319/WSPF Program which will address water quality concerns in the watershed. Additionally, IDNR Fisheries is preparing for an entire renovation of Viking Lake in 2006. One funding gap remains, that may prevent this comprehensive water quality project from achieving a successful endpoint. Funds are still needed for the renovation of malfunctioning septic systems at Viking Village housing development which is adjacent to the park, and has been identified as a primary source of contamination entering the lake. The intent of this application is to secure funds so that these septic system problems can be corrected and water quality conditions of this important natural resource restored for public enjoyment.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lake Macbride is considered to be one of the top four lakes for fishing in the state of Iowa. It is widely used by the public and contributes significant economic benefits to the county. Lake Macbride is situated in the North Corridor which is one of the fastest growing areas in the state. The lake has a surface area of 940 acres and drains 16,205 acres. Lake Macbride is on the Iowa 303(d) list for excessive sediments and nutrients. In 2001, Lake Macbride State Park received over 2.5 million dollars from the Marine Fuel Tax and Fish and Wildlife Trust to install 2 silt basins and stabilize over 12 miles of shoreline in the lake. Also in 2001, the Johnson County SWCD received a WSPF allocation from DSC to address agriculture and urban runoff issues in the watershed. Section 319 funding was received in 2002 to continue watershed efforts to the present. A watershed assessment was completed in 2003 to guide watershed activities. In 2005, a TMDL was completed for the lake. Since 2001, over $645,000 dollars has been spent by landowners and funding partners to install conservation practices in the watershed. Watershed efforts have resulted in the reduction of over 4200 tons of soils from being delivered into Lake Macbride. Nutrient reductions have also occurred from the development of nutrient management plans on 2000 acres. The District is in the process of wrapping up watershed efforts on private land. A series of 13 structures is planned to be installed in the State Park over the next several years. One of the last remaining items that still needs addressed is 1,400 feet of eroding shoreline adjacent to Lake Macbride along Cottage Reserve Road. The road is under the jurisdiction of the Johnson County Board of Supervisors. Both the Board of Supervisors and the IDNR are willing to contribute substantial dollars to address the 250 tons of soil that are being directly delivered to Lake Macbride each year.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Reaudit report on the Lake Park Municipal Utilities for the period July 1, 2004 through June 30, 2005

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Report on a special investigation of the Rodman Volunteer Fire Department and Park and Recreation Department for the period January 1, 2006 through September 30, 2009

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report contains the results of the Park and Recreation Enhancement Study Committee on the current and future needs for artificial and natural lakes, state parks, forests, and recreational areas in Iowa and make recommendations on the development of the new facilities and the restoration and management of current facilities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Capitol grounds have been evolving through planned and unplanned actions for more than 150 years. The 1857 Constitutio established Des Moines as the capital. The commissioners appointed to choose a site decided on land donated by Wilson Alexander Scott and Harrison Lyon. Located on the east side of the Des Moines River, on a gently rising hill, the site for the Iowa State Capitol began with fewer than 10 acres. The Old Brick Capitol was built in the center of that 10-acre plot, and the area to the north was used as a public park until work began on the present day Capitol. In 1884, the two-year process of moving from the Old Brick Capitol to the new Capitol began. The state commissioned John Weidenman to design the first formal decoration of the grounds. Weidenman’s plans for the west approach to the Capitol included planting statues, and walkways. The State held some additional land but not necessarily land adjacent to the Capitol. In 1909, legislation was passed, and in 1913, the Thirty-Fifth General Assembly enacted controversial legislation to acquire additional land. A commission was formed to locate a purposed monument honoring the long-serving U.S. Senator William B. Allison. E.L. Masqueray was hired as the architect expert focusing on the selection of a proper site for the proposed Allison Memorial. Masqueray’s plan detailed the placement of buildings and potential monuments. Growth of the Capitol Complex, as known today, began.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Audit report on the City of University Park, Iowa for the year ended June 30, 2014

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Central Park Lake Watershed Assessment and Management Plan identified four categories where improvements are needed to remove the 23 acre lake from the impaired waters list. These include the wastewater system, runoff from surrounding lands, in-lake nutrient re-suspension and runoff from hard surfaces within the park. The lake is currently impaired for bacteria, algae and pH. Through outcomes of the Watershed Assessment and Management Plan, this proposal includes for abandonment and reclamation of the single cell wastewater lagoon site, replacement with three conventional septic systems and construction of two wetlands. One of the wetlands is located on the same site as the reclaimed lagoon and the other is located to intercept sediment and trap nutrients transported by tile lines. The prescribed wastewater system improvements are based on assessment by grab samples test by the State Hygienic Lab, development of a Preliminary Engineering Report, soil analysis and communication with IDNR wastewater officials. The two wetland sites were assessed by officials from IDALS and the Jones County SWCD. This project is part of $1.7 million lake restoration effort to reclaim the 47 year old lake. The lake has a positive economic impact of more than $7.6 million annually and supports an average annual visitation of 58,145, according to the Iowa Lakes Valuation Project, conducted by Iowa State University.