41 resultados para Secondary CHD prevention


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document is the DMC Section of Iowa’s 2009 federal Juvenile Justice and Delinquency Prevention Act (JJDP Act) formula grant three year plan update. The Division of Criminal and Juvenile Justice Planning (CJJP) wrote this update. CJJP is the state agency responsible for administering the JJDP Act in Iowa. Federal officials refer to state administering agencies as the state planning agency (SPA). The Plan was developed and approved by Iowa’s Juvenile Justice Advisory Council. That Council assists with administration of the JJDP Act, and also provides guidance and direction to the SPA, the Governor and the legislature regarding juvenile justice issues in Iowa. Federal officials refer to such state level groups as state advisory groups (SAG’s). The acronyms SPA and SAG are used through this report.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Termed the “silent epidemic,” traumatic brain injury (TBI) is the most debilitating outcome of injury, and is characterized by the irreversibility of its damages, long-term effects on quality of life and healthcare costs. The latest data available from the CDC estimate that nationally, 52,000 people die each year from TBI2. In Iowa, TBI is a major public health problem. The numbers and rates of hospitalizations and emergency department (ED) visits due to TBIs are steadily increasing. From 2006 to 2008, there were on average 545 injury deaths per year. Among the injured Iowans, TBI constituted nearly 30 percent (545) of all injury deaths, ten percent (1,591) of people hospitalized and seven percent (17,696) of ED visitors. 3 The state of Iowa has been supporting secondary prevention services to TBI survivors for several years. An Iowa organization that has made a significant effort in assisting TBI survivors is the Brain Injury Association of Iowa (BIAIA). The BIAIA administers the IBIRN program in cooperation with the Iowa Department of Public Health (IDPH) through HRSA TBI Implementation grant funding and state appropriations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

CJJP found that for 2011, prison releasees who had gone throught the revamped MIFVPP were significantly less likely to be convicted of a violent assault on release from prison.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document is the DMC Section of Iowa’s 2009 federal Juvenile Justice and Delinquency Prevention Act (JJDP Act) formula grant three year plan update. The Division of Criminal and Juvenile Justice Planning (CJJP) wrote this update. CJJP is the state agency responsible for administering the JJDP Act in Iowa. Federal officials refer to state administering agencies as the state planning agency (SPA). The Plan was developed and approved by Iowa’s Juvenile Justice Advisory Council. That Council assists with administration of the JJDP Act, and also provides guidance and direction to the SPA, the Governor and the legislature regarding juvenile justice issues in Iowa. Federal officials refer to such state level groups as state advisory groups (SAG’s). The acronyms SPA and SAG are used through this report.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document contains two related, but separate reports. The Juvenile Crime Prevention Community Grant Fund Outcomes Report is a summary of outcomes from services and activities funded through the Juvenile Crime Prevention Community Grant Fund in FY2001. The Juvenile Justice Youth Development Program Summary describes Iowa communities’ current prevention and sanction programs supported with funding from the Division of Criminal and Juvenile Justice Planning (CJJP) during FY2002. The material in Juvenile Crime Prevention Community Grant Fund Outcomes Report is presented in response to a legislative mandate to report specific prevention outcomes for the community Grant Fund. It includes a brief description of a Youth Development Results Framework established by the Iowa Collaboration for Youth Development. Outcomes are reported using this results framework, which was developed by a number of state agencies as a common tool for various state programs involving youth development related planning and funding processes. Included in this report is a description of outcomes from the prevention activities funded, all or in part, by the Community Grant Fund, as reported by local communities. The program summaries presented in the Juvenile Justice Youth Development Program Summary provide an overview of local efforts to implement their 2002 Juvenile Justice Youth Development plans and include prevention and sanction programs funded through the combined resources of the State Community Grant Fund and the Federal Title V Prevention, Juvenile Justice & Delinquency Prevention Act Formula Grant and Juvenile Accountability Incentive Block Grant programs. These combined funds are referred to in this document as the Juvenile Justice Youth Development (JJYD) funds. To administer the JJYD funds, including funds from the Community Grant Fund, CJJP partners with local officials to facilitate a community planning process that determines the communities’ priorities for the use of the funds. The local planning is coordinated by the Iowa’s Decategorization Boards (Decats). These local officials and/or their staff have been leaders in providing oversight or staff support to a variety of local planning initiatives (e.g. child welfare, Comprehensive Strategy Pilot Projects, Empowerment, other) and bring child welfare and community planning experience to the table for the creation of comprehensive community longterm planning efforts. The allocation of these combined funds and the technical assistance received by the Decats from CJJP is believed to have helped enhance both child welfare and juvenile justice efforts locally and has provided for the recognition and establishment of connections for joint child welfare/juvenile justice planning. The allocation and local planning approach has allowed funding from CJJP to be “blended” or “braided” with other local, state, and federal dollars that flow to communities as a result of their local planning responsibilities. The program descriptions provided in this document reflect services and activities supported with JJYD funds. In many cases, however, additional funding sources have been used to fully fund the programs. Most of the information in this document’s two reports was submitted to CJJP by the communities through an on- line planning and reporting process established jointly by the DHS and CJJP.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

County engineers in Iowa face the dual problems of rapidly escalating costs and a decreasing rate of growth of revenues. Various priority systems are in use, ranking projects for inclusion in road improvement programs, but they generally have weaknesses when used to compare one project with another in a different location. The sufficiency rating system has proven to be a useful tool in developing a priority list of projects for primary road systems, but there are none currently in use for secondary road systems. The research reported here was undertaken to develop a sufficiency rating system which could be used for secondary roads in Iowa and to produce the necessary forms and instructions to aid county engineering personnel in their efforts to complete the ratings for roads within their county.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There are approximately 800 installations of destination lighting at secondary road intersections in Iowa. Approximately 90% of these have only a single luminaire. The other installations have two luminaires. No warrants currently exist for justifying the use of this type of lighting. Previous research has examined the safety benefits from full lighting of rural intersections that generally serve substantially higher traffic volumes than secondary road intersections in Iowa. However, the safety benefit of destination lighting at intersections carrying relatively low volumes has not been the subject of previous research. The research reported here, sponsored by the Iowa Department of Transportation, was undertaken to identify locations where destination lighting could be expected to improve highway safety. If destination lighting were shown to reduce accident frequency, warrants for its use on secondary roads could be developed. An inventory of secondary road lighting installations in Iowa was assembled. From this inventory, two samples were constituted that would permit two separate comparisons of the accident experience with and without destination lighting. Before and after comparisons were made for the same locations if accident records were available for at least one full year both preceding and following the installation of destination lighting. Accident records for this purpose were available from a statewide computerized record system covering the period from 1977 through 1982. The accident experience at locations having destination lighting installed before 1978 was compared with a sample of comparable locations not having destination lighting. The sample of secondary road intersections used for the before and after comparison included 91 locations. The sample of continuously lighted locations included 102 intersections. Accident experience at these locations was compared with the experience at 102 intersections that were not lighted. The intersections included in these samples averaged only 0.31 accidents per year. The accident rate at secondary road intersections that had destination lighting did not differ significantly from the accident rate at intersections that were not lighted. This conclusion was derived from both comparisons, the before and after experience and the comparison of experience at intersections that were continuously lighted with that at unlighted locations. Furthermore, no significant differences were noted between lighted and unlighted locations in the proportion of accidents that occurred at night. The distribution of accidents by type also did not differ between unlighted intersections and those having destination lighting. It was not possible to formulate warrants for destination lighting since analyses directed toward identifying specific characteristics of an intersection that could be correlated with highway safety did not yield any useful relationships. However, it was noted that the average damages for night accidents that occurred at lighted intersections were lower than for accidents at unlighted intersections. Even in the absence of a more definitive demonstration of beneficial effects, destination lighting is perceived by officials in most of the counties having such installations as yielding desirable effects and is recognized as helpful to motorists in performing the guidance function in driving. Given this benefit and a relatively low cost (an average of $74 per year for one luminaire), and given that the subjective criteria that have been used in the past to justify the installation of destination lighting have led to a high degree of public acceptance and satisfaction, it is recommended that the same subjective criteria continue to be used in lieu of definitive warrants.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The goal of this study is to develop a usable sufficiency rating system for secondary roads. There are several assumptions that have been made at the outset. These are: 1. County engineers currently use at least a limited set of decision criteria to make decisions regarding project priorities. 2. Some degree of consensus exists among the county engineers in terms of which are the most important criteria and that there is some agreement on their relative importance. Accordingly, a questionnaire was developed which could be used as a survey tool. The results of the survey were used to develop a final list of weighted rating elements which were used as part of the proposed sufficiency rating system. State and local jurisdictions from other states were also surveyed to determine the status of the use of sufficiency rating systems for secondary roads outside of Iowa and to gather some applicable data.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Snow removal on the 90,000 mile Iowa secondary road system is a major concern of county engineers. Rural residents rely almost entirely on motor vehicles for travel. They have come to expect passable roads during all types of weather and as most county engineers know, the public is less tolerant of problems in snow removal than in any other highway department function. To avoid snow removal problems, maintenance personnel begin preparation before the winter maintenance season. The slide tape presentation, "Snow Removal on Iowa's Secondary Roads", was developed to assist in training and retraining maintenance personnel each year prior to winter. The program covers preparation for winter, snow and ice removal, and after storm care of equipment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa counties have been successful in maintaining a good roadway environment on our 90,000 mile secondary road system. However, county highway personnel must remain vigilant in detecting, discovering and correcting potential problems if our roads are to remain so. This presentation was developed for those county personnel who work and travel on secondary roads. The presentation discusses things county personnel can look for during their daily operations which could possibly create a potential problem. If these situations are uncovered and corrected in a timely manner, our secondary road system will be maintained in an appropriate manner.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The information contained in this handbook attempts to outline the fraud problem in Iowa's unemployment compensation and provide some solutions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1951 Greene County and the Iowa Highway Research Board paved County Road E-33 from Iowa Highway No. 17 (now Iowa 4) to Farlin with various thicknesses [ranging from 4.5 in. (11.4 cm) to 6 in. (15.2 cm)] of portland cement concrete pavement. The project, designated HR-9, was divided into ten research sections. This formed pavement was placed on the existing grade. Eight of the sections were non-reinforced except for centerline tie bars and no contraction joints were used. Mesh reinforcing and contraction joints spaced at 29 ft 7 in. (9.02 m) intervals were used in two 4.5-in. (11.4-cm) thick sections. The concrete in one of the sections was air entrained. Signs denoting the design and limits of the research sections were placed along the roadway. The pavement has performed well over its 28-year life, carrying a light volume of traffic safely while requiring no major maintenance. The 4.5-in. (11.4-cm) thick mesh-reinforced pavement with contraction joints has exhibited the best overall performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project was directed at laboratory and field evaluation of sodium montmorillonite clay (bentonite) as a dust palliative for limestone surfaced secondary roads. It had been postulated that the electrically charged surfaces of the clay particles could interact with the charged surfaces of the limestone and act as a bonding agent to agglomerate fine (-#200) particulates and also to band the fine particulates to larger (+#200) limestone particles. Laboratory testing using soda ash dispersed bentonite treatment of limestone fines indicated significant improvement of compressive strength and slaking characteristics. It was recommended that the project proceed to field trials and test roads were constructed in Dallas and Adair counties in Iowa. Soda ash dispersed bentonite solutions can be field mixed and applied with conventional spray distribution equipment. A maximum of 1.5% bentonite(by weight of aggregate)can be applied at one time. Higher applications would have to be staged allowing the excess moisture to evaporate between applications. Construction of higher application treatments can be accomplished by adding dry bentonite to the surfacing material and then by dry road mixing. The soda ash water solution can then be spray applied and the treated surfacing material wet mixed by motor graders to a consistency of 3 to 4 inch slump concrete. Two motor graders working in tandem can provide rapid mixing for both methods of construction. Calcium and magnesium chloride treatments are 2 to 3 times more effective in dust reduction in the short term (3-4 months) but are prone to washboarding and potholing due to maintenance restrictions. Bentonite treatment at the 2-3% level is estimated to provide a 30-40% dust reduction over the long term(18-24 months). Normal maintenance blading operations can be used on bentonite treated areas. Vehicle braking characteristics are not adversely affected up to the 3.0% treatment level. The bentonite appears to be functioning as a banding agent to bind small particulates to larger particles and is acting to agglomerate fine particles of limestone. This bonding capability appears recoverable from environmental effects of winter, and from alternating wet and dry periods. The bentonite appears to be able to interact with new applications of limestone maintenance material and maintains a dust reduction capability. Soda ash dispersed bentonite treatment is approximately 10 times more cost effective per percent dust reduction than conventional chloride treatments with respect to time. However,the disadvantage is that there is not the initial dramatic reduction in dust generation as with the chloride treatment. Although dust is reduced 30-40% after treatment there is still dust being generated and the traveling public or residents may not perceive the reduction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project was directed at laboratory and field evaluation of sodium montmorillonite clay (Bentonite) as a dust palliative for limestone surfaced secondary roads. It was postulated that the electrically charged surfaces (negative) of the clay particles could interact with the charged surfaces (positive) of the limestone and act as a bonding agent to agglomerate fine (-#200) particulates, and also to bond the fine particulates to larger (+#200) limestone particles. One mile test roads were constructed in Tama, Appanoose, and Hancock counties in Iowa using Bentonite treatment levels (by weight of aggregate) ranging from 3.0 to 12.0%. Construction was accomplished by adding dry Bentonite to the surfacing material and then dry road mixing. The soda ash/water solution (dispersing agent) was spray applied and the treated surfacing material wet mixed by motor graders to a consistency of 2 to 3 inch slump concrete. Two motor graders working in tandem provided rapid mixing. Following wet mixing the material was surface spread and compacted by local traffic. Quantitative and qualitative periodic evaluations and testing of the test roads was conducted with respect to dust generation, crust development, roughness, and braking characteristics. As the Bentonite treatment level increased dust generation decreased. From a cost/benefit standpoint, an optimum level of treatment is about 8% (by weight of aggregate). For roads with light traffic, one application at this treatment level resulted in a 60-70% average dust reduction in the first season, 40-50% in the second season, and 20-30% in the third season. Crust development was rated at two times better than untreated control sections. No discernible trend was evident with respect to roughness. There was no evident difference in any of the test sections with respect to braking distance and braking handling characteristics, under wet surface conditions compared to the control sections. Chloride treatments are more effective in dust reduction in the short term (3-4 months). Bentonite treatment is capable of dust reduction over the long term (2-3 seasons). Normal maintenance blading operations can be used on Bentonite treated areas. Soda ash dispersed Bentonite treatment is estimated to be more than twice as cost effective per percent dust reduction than conventional chloride treatments, with respect to time. However, the disadvantage is that there is not the initial dramatic reduction in dust generation as with the chloride treatment. Although dust is reduced significantly after treatment there is still dust being generated. Video evidence indicates that the dust cloud in the Bentonite treated sections does not rise as high, or spread as wide as the cloud in the untreated section. It also settles faster than the cloud in the untreated section. This is considered important for driving safety of following traffic, and for nuisance dust invasion of residences and residential areas. The Bentonite appears to be functioning as a bonding agent.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research project HR-155 was initiated to study soil erosion problems along the secondary road system in Iowa and to find a substitute for straw for the control of soil erosion during the period of seed establishment. Accordingly, six field research sites were established to test the ability of commercial soil conditioners to control soil erosion. The six field research sites were selected on the basis of terrain and type of soil material exposed on the cut-slope areas.