Seven experimental texture sections were constructed on the Polk-Jasper RP-163-1(50)--16--77 project just east of Des Moines. The experimental sections included two groove depths for a longitudinal tine texture and 13 mm (1/2 in.), 19 mm (1 in.) and variable spaced transverse tine textures. An artificial turf textured section was also included. Friction values and a rating of objectionable noise were determined for all sections. All transverse tine textures generated a high level of objectionable noise. The longitudinal tine texture was rated very good in regard to objectionable noise. At this time, all tined textures are providing satisfactory friction values.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The major objective of this work was to evaluate the potential of image analysis for characterizing air voids in Portland cement Concrete (PCC), voids and constituents of Asphalt Concrete (AC) and aggregate gradation in AC. Images for analysis were obtained from a scanning electron microscope (SEM). Sample preparation techniques are presented that enhance signal differences so that backscattered electron (BSE) imaging, which is sensitive to atomic number changes, can be effectively employed. Work with PCC and AC pavement core samples has shown that the low vacuum scanning electron microscope (LVSEM) is better suited towards rapid analyses. The conventional high vacuum SEM can also be used for AC and PCC analyses but some distortion within the sample matrix will occur. Images with improved resolution can be obtained from scanning electron microscope (SEM) backscatter electron (BSE) micrographs. In a BSE image, voids filled with barium sulfate/resin yield excellent contrast in both PCC and AC. There is a good correlation between percent of air by image analysis and linear traverse.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Concrete paving is often at a disadvantage in terms of pavement type selection due to the time of curing required prior to opening the pavement to traffic. The State of Iowa has been able to reduce traffic delay constraints through material selection and construction methods to date. Methods for monitoring concrete strength gain and quality have not changed since the first concrete pavements were constructed in Iowa. In 1995, Lee County and the Iowa DOT cooperated in a research project, HR-380, to construct a 7.1 mile (11. 43 km) project to evaluate the use of maturity and pulse velocity nondestructive testing (NDT) methods in the estimation of concrete strength gain. The research identified the pros and cons of each method and suggested an instructional memorandum to utilize maturity measurements to meet traffic delay demands. Maturity was used to reduce the traffic delay opening time from 5-7 days to less than 2 days through the implementation of maturity measurements and special traffic control measures. Recommendations on the development of the maturity curve for each project and the location and monitoring of the maturity thermocouples are included. Examples of equipment that could easily be used by project personnel to estimate the concrete strength using the maturity methods is described.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In conventional construction practices, a longitudinal joint is sawed in a PCC (Portland Cement Concrete) pavement to control concrete shrinkage cracking between two lanes of traffic. Sawing a joint in hardened concrete is an expensive and time consuming operation. The longitudinal joint is not a working joint (in comparison to a transverse joint) as it is typically tied with a tie bar at 30 inch spacing. The open joint reservoir, left by the saw blade, typically is filled or sealed with a durable crack sealant to keep incompressibles and water from getting into the joint reservoir. An experimental joint forming knife has been developed. It is installed under the paving machine to form the longitudinal joint in the wet concrete as a part of the paving process. Through this research method, forming a very narrow longitudinal joint during the paving process, two conventional paving operations can be eliminated. Joint forming eliminates the need of the joint sawing operation in the hard concrete, and as the joint that is formed does not leave a wide-open reservoir, but only a hairline crack, it does not need the joint filling or sealing operation. Therefore, the two conventional longitudinal joint sawing and sealing operations are both being eliminated by this innovation. A laboratory scale prototype joint forming knife was built and tested, initially forming joints in small concrete beams. The results were positive so the method was proposed for field testing. Initial field tests were done in the construction season of 2001, limited to one paving contractor. A number of modifications were made to the knife throughout the field tests. About 3000 feet of longitudinal joint was formed in 2001. Additional testing was done in the 2002 construction season, working with the same contractor. About 150,000 feet of longitudinal joint was formed in 2002. Evaluations of the formed joints were done to determine longitudinal joint hairline crack development rate and appearance. Additional tests will be done in the next construction season to improve or perfect the longitudinal joint forming technique.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Portland cement concrete pavements have given excellent service history for Iowa. Many of these pavements placed during the 1920’s and 1930’s are still in service today. Many factors go in to achieve a long term durable concrete pavement. Probably the most important is the durability of the aggregate. Until the 1930’s, pit run gravel was the most predominant aggregate used. Many of these gravels provided long term performance and their durability is dependent upon the carbonate fraction of the gravel. Later, limestone (calcium carbonate) and dolomite (calcium, magnesium carbonate) sources were mined across Iowa. The durability of these carbonate aggregates is largely dependent upon the pore system which can cause freeze thaw problems known as D-cracking, which was a problem with some sources during the 1960’s. Also, some of these carbonate aggregates are also susceptible to deterioration from deicing salts. Geologists have identified the major components that affect the durability of these carbonate aggregates and sources are tested to ensure long term performance in Portland cement concrete. Air entrainment was originally put in concrete to improve scaling resistance. It is well known that air entrainment is required to provide freeze thaw protection in concrete pavements today. In Iowa, air entrainment was not introduced in concrete pavements until 1952. This research investigates properties that made older concrete pavements durable without air entrainment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Early deterioration has shown up in a number of Iowa PCC pavements placed between 1986 and 1994. Research has shown that inadequate air content and spacing factors have contributed to the deterioration. Ettringite infilling of air voids is nearly always noted in cores obtained from pavements exhibiting deterioration. This research is to document the early deterioration on I-29 in Pottawattamie county from MP 59 to 72 in both directions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1990, early distress had shown up on US 20 in Hamilton/Webster counties, three years after paving. Since that time, over a dozen more projects, constructed between 1984 and 1994, have been found to exhibit similar early distress. Several changes to the concrete and Portland cement specifications occurred in 1994 and 1996. This study was undertaken to investigate in place concrete pavements before and after specification changes were implemented. The objective of this research is to evaluate the impact of Portland cement and concrete specification changes made in 1994 and 1996 on PCC durability. Cores were obtained in 1998 and 2003 from projects constructed in 1992, before specification changes, and 1997 after specification changes. The following is a brief summary of the conclusions: 1. The pavements in the study constructed under the new specifications are performing much better after 5 years of service than the pavements constructed under the old specifications. 2. According to ISU, micro-cracking is evident in all concrete that has been in service, due to thermal stresses and loading stresses. Also, the low vacuum SEM will desiccate the concrete enough to cause micro-cracking. The SEM should not be used as a tool to indicate micro-cracking. 3. Use of Type II cement (C3A <8%) and a 3.0% SO3 limit does not completely eliminate ettringite infilling in air voids, as indicated in the bottom of the 1997 cores. 4. In areas of high moisture (bottom of the core), infilling is present in most of the 1997 cores. 5. Low air content and high spacing factor in the top of 1992 cores apparently causes F/T cycling cracking and then increased moisture paths from cracking causes infilling. 6. Use of ground granulated blast furnace slag (GGBFS) and fly ash reduces ettringite infilling either by diluting the aluminate (C3A) or lowering permeability, which slows ingress of moisture. 7. The specification changes that made the biggest impact on pavement durability are the limits on vibration and increase in air content in September 1994. 8. Investigations of cores from pavements placed in 2002 and 2003 indicate improved air contents and spacing factors. In-place air content and spacing factors should be monitored to determine if appropriate air void parameters are being met.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The members of the Iowa Concrete Paving Association, the National Concrete Pavement Technology Center Research Committee, and the Iowa Highway Research Board commissioned a study to examine alternative ways of developing transverse joints in portland cement concrete pavements. The present study investigated six separate variations of vertical metal strips placed above and below the dowels in conventional baskets. In addition, the study investigated existing patented assemblies and a new assembly developed in Spain and used in Australia. The metal assemblies were placed in a new pavement and allowed to stay in place for 30 days before the Iowa Department of Transportation staff terminated the test by directing the contractor to saw and seal the joints. This report describes the design, construction, testing, and conclusions of the project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To provide insight into subgrade non-uniformity and its effects on pavement performance, this study investigated the influence of non-uniform subgrade support on pavement responses (stress and deflection) that affect pavement performance. Several reconstructed PCC pavement projects in Iowa were studied to document and evaluate the influence of subgrade/subbase non-uniformity on pavement performance. In situ field tests were performed at 12 sites to determine the subgrade/subbase engineering properties and develop a database of engineering parameter values for statistical and numerical analysis. Results of stiffness, moisture and density, strength, and soil classification were used to determine the spatial variability of a given property. Natural subgrade soils, fly ash-stabilized subgrade, reclaimed hydrated fly ash subbase, and granular subbase were studied. The influence of the spatial variability of subgrade/subbase on pavement performance was then evaluated by modeling the elastic properties of the pavement and subgrade using the ISLAB2000 finite element analysis program. A major conclusion from this study is that non-uniform subgrade/subbase stiffness increases localized deflections and causes principal stress concentrations in the pavement, which can lead to fatigue cracking and other types of pavement distresses. Field data show that hydrated fly ash, self-cementing fly ash-stabilized subgrade, and granular subbases exhibit lower variability than natural subgrade soils. Pavement life should be increased through the use of more uniform subgrade support. Subgrade/subbase construction in the future should consider uniformity as a key to long-term pavement performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mixture materials, mix design, and pavement construction are not isolated steps in the concrete paving process. Each affects the other in ways that determine overall pavement quality and long-term performance. However, equipment and procedures commonly used to test concrete materials and concrete pavements have not changed in decades, leaving gaps in our ability to understand and control the factors that determine concrete durability. The concrete paving community needs tests that will adequately characterize the materials, predict interactions, and monitor the properties of the concrete. The overall objectives of this study are (1) to evaluate conventional and new methods for testing concrete and concrete materials to prevent material and construction problems that could lead to premature concrete pavement distress and (2) to examine and refine a suite of tests that can accurately evaluate concrete pavement properties. The project included three phases. In Phase I, the research team contacted each of 16 participating states to gather information about concrete and concrete material tests. A preliminary suite of tests to ensure long-term pavement performance was developed. The tests were selected to provide useful and easy-to-interpret results that can be performed reasonably and routinely in terms of time, expertise, training, and cost. The tests examine concrete pavement properties in five focal areas critical to the long life and durability of concrete pavements: (1) workability, (2) strength development, (3) air system, (4) permeability, and (5) shrinkage. The tests were relevant at three stages in the concrete paving process: mix design, preconstruction verification, and construction quality control. In Phase II, the research team conducted field testing in each participating state to evaluate the preliminary suite of tests and demonstrate the testing technologies and procedures using local materials. A Mobile Concrete Research Lab was designed and equipped to facilitate the demonstrations. This report documents the results of the 16 state projects. Phase III refined and finalized lab and field tests based on state project test data. The results of the overall project are detailed herein. The final suite of tests is detailed in the accompanying testing guide.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction of an excellent network of primary highways across the State of Iowa has essentially been completed. The major task facing the Iowa Department of Transportation today is the maintenance and rehabilitation of that network. The most commonly utilized rehabilitation practice is asphalt concrete resurfacing. This practice will normally provide a good driving surface for at least 10 additional years. The major problem with asphalt concrete resurfacing is the reflection cracking from underlying cracks and joints in the portland cement concrete (PCC) pavement. Deterioration and spaling occur at these reflection cracks and are the limiting factor of the-effective life of the asphalt concrete resurfacing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The MIT Scan T2 device has been implemented in Iowa as a new method for determining PCC pavement thickness compliance. The T2 device utilizes a magnetic pulse induction technology to measure the distance from a sensor to a metal target. The objective of this project was to conduct an interlaboratory study (ASTM C802) to determine the precision of the test.Fifteen MIT Scan T2 gauges and fifteen operators performed testing on three reference platforms and nine pavement locations of varying thicknesses. The testing was conducted on October 29, 2014 at two sites near Ames, Iowa. Usable data was obtained from every operator at all locations.