83 resultados para Jurisdiction over aircraft.
Resumo:
State Audit Reports
Resumo:
The objective of the study presented in this report was to document the launch of the Iowa River Bridge and to monitor and evaluate the structural performance of the bridge superstructure and substructure during the launch. The Iowa Department of Transportation used an incremental launching method, which is relatively unique for steel I-girder bridges, to construct the Iowa River Bridge over an environmentally sensitive river valley in central Iowa. The bridge was designed as two separate roadways consisting of four steel plate girders each that are approximately 11 ft deep and span approximately 301 ft each over five spans. The concrete bridge deck was not placed until after both roadways had been launched. One of the most significant monitoring and evaluation observations related to the superstructure was that the bottom flange (and associated web region) was subjected to extremely large stresses during the crossing of launch rollers. Regarding the substructure performance, the column stresses did not exceed reasonable design limits during the daylong launches. The scope of the study did not allow adequate quantification of the measured applied launch forces at the piers. Future proposed esearch should provide an opportunity to address this. The overall experimental performance of the bridge during the launch was compared with the predicted design performance. In general, the substructure design, girder contact stress, and total launching force assumptions correlated well with the experimental results. The design assumptions for total axial force in crossframe members, on the other hand, differed from the experimental results by as much as 300%.
Resumo:
State Audit Reports
Resumo:
State University Audit Report
Resumo:
Audit report on a review of selected general and application controls over the University of Northern Iowa’s Modern Executive Management Financial Information System (MEMFIS) human resources and payroll modules for the period May 22, 2006 through June 12, 2006.
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Transportation’s Resource Management System for the period May 5, 2006 through August 4, 2006.
Resumo:
Audit report on the review of selected general and application controls over the State University of Iowa University of Iowa) ProTrav system for the period June 5, 2006 through July 28, 2006
Resumo:
Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System (IPERS) Benefits Administration System for the period April 23, 2007 through May 16, 2007
Resumo:
Report on the review of selected general and application controls over the State University of Iowa (University of Iowa) PeopleSoft General Ledger system for the period June 4, 2007 through July 27, 2007
Resumo:
Report on a review of selected general and application controls over the Iowa State University of Science and Technology payroll system for the period March 27 through May 11, 2007
Resumo:
Report on a review of selected general and application controls over the Iowa State University of Science and Technology tuition and fees system for the period of April 11 through May 2, 2008
Resumo:
Report on a review of selected general and application controls over the University of Northern Iowa’s tuition and fees system for the period May 24, 2007 through July 3, 2007
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Transportation’s Contractor Pay System for the period May 5, 2008 through July 31, 2008
Resumo:
Report on the review of selected general and application controls over the State University of Iowa PeopleSoft Human Resources Information System (HRIS) for the period June 3, 2008 through July 25, 2008
Resumo:
Purposes of this Report: • Recommend the most logical and economical options to address state governmental space needs in the Polk County metropolitan area to the year 2010. • Include building size, location, phasing, financing, method of project delivery and estimated cost. • Develop a software tool to compare costs of leasing vs. ownership of space. Methodology: Identify: 1. Current amount and location of owned and leased space, by agency; 2. Types of space and whether best located on or off of the Capitol Complex; 3. Utilization of space, noting over-crowding and under-utilization; 4. Current number of workstations for full and part time employees, Personnel Employment Organization (PEO) workers, contractors, interns, etc.; and, 5. History of staff levels to assist in the prediction of staff growth. Scope: This report focuses on 10 state-owned buildings located on the Capitol Complex and 48 leased spaces in the Polk County metropolitan area. (See Figures 1 and 2.) • Due to a separate space study under way by the Legislature, implications of area and staff for the State Capitol building are included only for the Governor, Lieutenant Governor, Treasurer, Secretary of State, Auditor and the Department of Management. • Because it is largely a museum building that does not have office space available for other agencies, the area and staff of the Historical Building are not fully addressed. • Only the parking implications of the new Judicial Building are included in this study because the building space is under the jurisdiction of the Judicial Branch and not available for other agencies. Several state-owned buildings are not included in the scope of this report, generally because they have highly focused purposes, and their space is not available for assignment to other agencies. Several leased locations are not included for similar reasons, including leases that do not fall within the authority of the Department of General Services.