54 resultados para Green Infrastructure
Resumo:
Audit report on the Disaster Grants – Public Assistance program of the Green Bay Levee and Drainage District in Lee County, Iowa for the year ended June 30, 2009
Resumo:
This plan makes 25 recommendations that, when takes together, will take Iowa's infrastructure to the next level, ensure quality of life, and allow the economy to be globally competitive. It requires two fundamental changes in Iowans' prectices: cooperative planning and integration of infrastructure sectors.
Resumo:
The Rebuild Iowa Infrastructure and Transportation Task Force is acutely aware of the critical role infrastructure plays in Iowa’s communities, the lives of the residents, and the economic well-being of the state. With encouragement to the Rebuild Iowa Advisory Commission (RIAC) for its consideration of great need for infrastructure and transportation repairs, the Task Force provides its assessment and recommendations. As the RIAC fulfills its obligations to guide the recovery and reconstruction in Iowa, infrastructure and transportation must be recognized for its impact on all Iowans. The tornadoes, storms, and floods were devastating to infrastructure and transportation systems across the state. The damage did not distinguish between privately-owned and public assets. The significance of the damage emerges further with the magnitude of the damage estimates. Infrastructure includes components that some might initially overlook, such as communication systems, landfills, and water treatment. The miles of damaged roads and bridges are more evident to many Iowans. Given the reliance on infrastructure systems, many repairs are already underway, though gaps have emerged in the funding for repairs to certain infrastructure systems. Supplement Information to the August 2008
Resumo:
Per legislative requirement, attached is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II. Although a status report for the Bridge Safety Fund was already submitted to the directors of LSA and DOM, a status report on those projects is also included within this attachment for consistency with last year’s reporting. In addition, per request from LSA, status reports for the FY 2011 passenger rail appropriation from the Underground Storage Tank Fund and the FY 2010 Commercial Service Vertical Infrastructure appropriation from the General Fund are also listed in this report.
Report and Recommendations of the Iowa Vertical Infrastructure Advisory Committee, December 15, 2006
Resumo:
This report summaries the work of the committee over the last year and its vision for the future. The committee is followed with interest the work of the Department of Corrections and the Department of Veterans Affairs in evaluating the needs of their facilities and recommends similar evaluations of facilities around the state by other agencies. The committee members are ready to offer advice on the needs of the state's again infrastructure and steps that could be taken to evaluate vacant and underutilized buildings and reduce operational and maintenance costs.
Report and Recommendations of the Iowa Vertical Infrastructure Advisory Committee, December 15, 2009
Resumo:
This report summaries the work of the committee over the last year and its vision for the future. The committee is followed with interest the work of the Department of Corrections and the Department of Veterans Affairs in evaluating the needs of their facilities and recommends similar evaluations of facilities around the state by other agencies. The committee members are ready to offer advice on the needs of the state's again infrastructure and steps that could be taken to evaluate vacant and underutilized buildings and reduce operational and maintenance costs.
Report and Recommendations of the Iowa Vertical Infrastructure Advisory Committee, December 13, 2011
Resumo:
This report summaries the work of the committee over the last year and its vision for the future. The committee is followed with interest the work of the Department of Corrections and the Department of Veterans Affairs in evaluating the needs of their facilities and recommends similar evaluations of facilities around the state by other agencies. The committee members are ready to offer advice on the needs of the state's again infrastructure and steps that could be taken to evaluate vacant and underutilized buildings and reduce operational and maintenance costs.
Report and Recommendations of the Iowa Vertical Infrastructure Advisory Committee, December 15, 2010
Resumo:
This report summaries the work of the committee over the last year and its vision for the future. The committee is followed with interest the work of the Department of Corrections and the Department of Veterans Affairs in evaluating the needs of their facilities and recommends similar evaluations of facilities around the state by other agencies. The committee members are ready to offer advice on the needs of the state's again infrastructure and steps that could be taken to evaluate vacant and underutilized buildings and reduce operational and maintenance costs.
Resumo:
Per legislative requirement, attached is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II. In addition, we have included status reports for the FY11 passenger rail appropriation from the Underground Storage Tank Fund and the FY2010 Commercial Service Vertical Infrastructure appropriation from the General Fund.
Resumo:
Per legislative requirement, attached is the Iowa Department of Transportation’s summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Bridge Safety, Revenue Bonds Capitals, and Revenue Bonds Capitals II. In addition, we have included status reports for the FY11 passenger rail appropriation from the Underground Storage Tank Fund and the FY2010 Commercial Service Vertical Infrastructure appropriation from the General Fund.
Resumo:
Iowa’s infrastructure is at a crossroads. A stalwart collection of Iowans dared to consider Iowa’s future economy, the way ahead for future generations, and what infrastructure will be required – and what will not be required – for Iowa to excel. The findings are full of opportunity and challenge. The Infrastructure Plan for Iowa’s Future Economy: A Strategic Direction tells the story and points the way to a strong economy and quality of life for our children and our children’s children. This plan is different from most in that the motivation for its development came not from a requirement to comply or achieve a particular milestone, but, rather, from a recognition that infrastructure, in order to ensure a globally-competitive future economy, must transform from that of past generations. It is not news that all infrastructure – from our rich soil to our bridges – is a challenge to maintain. Prior to the natural disasters of 2008 and the national economic crisis, Iowa was tested in its capacity to sustain not only the infrastructure, but to anticipate future needs. It is imperative that wise investments and planning guide Iowa’s infrastructure development. This plan reflects Iowa’s collective assessment of its infrastructure– buildings, energy, natural resources, telecommunications, and transportation – as, literally, interdependent building blocks of our future. Over the months of planning, more than 200 Iowans participated as part of committees, a task force, or in community meetings. The plan is for all of Iowa, reflected in private, nonprofit, and public interests and involvement throughout the process. Iowa’s success depends on all of Iowa, in all sectors and interests, to engage in its implementation. The Infrastructure Plan for Iowa’s Future Economy: A Strategic Direction sets a clear and bold direction for all stakeholders, making it clear all have a responsibility and an opportunity to contribute to Iowa’s success.
Resumo:
An update of the following: Status of capital projects from prior year appropriations, appropriation from RIIF, and other other projects, current prison population, expected growth and over population, overview of revised classification system and how it affects bed planning, timeline for construction, 2009 funding, plan for the governor recommended $500,000 for project management and other infrastructure priorities.
Resumo:
The Greene County, Iowa overlay project, completed in October 1973, was inspected on October 16 & 17, 1978 After five years of service The 33 fibrous concrete sections, four CRCP sections, two mesh reinforced and two plain concrete sections with doweled reinforcement were rated relative to each other on a scale of 0 t o 100. The rating was conducted by the original members of the Project Planning Committee, Iowa DOT, Iowa Counties, Federal Highway Administration, University of Illinois and industry representatives . In all , there were 23 representatives who rated this project . The 23 values were then averaged to provide a final rating number for each section. The highest panel rating (90) was assigned to the 5-inch thick , deformed barre in forced PCC sections ; an 86t o a 3-inch thick , 160 lbs. of fiber and 600 lbs . of cement on a partial bonded surface ; an 84 to the 4-inch CRC with elastic joints (bonded) and an 84 to a 4-inch mesh reinforce section. One of the major factors influencing performance appears t o be the thickness. In the fibrous concrete overlay, The greatest influences appears t o be the fiber content. Overlay Sections containing 160 1b/yd3 of Fiber are, in almost all cases , outperforming those c o n t a i n i n g 60 or 100. It is obvious at This time meth at the 3-inch thick fibrous concrete overlays are, in general, out performing the 2-inch thick sections. The performance of the fibrous concrete the overlay appears to be favorably influenced by: (1) The use of higher a spectra fiber (0.025 x 2.5 i n c h e s ) v e r s u s (0.010 x 0.022 x 1.0 inches) (2) The use of a lower cement c o n t e n t ( 600 versus 750 1b/yd3) However, The set less well defined and the improvements in overlay performance attributed to high aspect ratio fibers and low cement contents.
Resumo:
Major maintenance; health, safety, loss of use; and Americans with Disabilities Act deficiencies at the Capitol Complex and statewide for twelve agencies and divisions participating in the Vertical Infrastructure Program in collaboration with the Governor's Vertical Infrastructure Advisory Committee, including the Department of Administrative Services; the Department of Commerce, Alcoholic Beverages Division; the Department of Corrections; the Department of Cultural Affairs; the Department of Education, including Iowa Public Television and Iowa Vocational Rehabilitation Services; the Department of Human Services; Iowa Law Enforcement Academy; the Department of Public Safety; Terrace Hill; Iowa Veterans Home and Iowa Workforce Development. The advisory committee meets on a monthly basis to review the progress of the work and to make recommendations on procedures and priorities.
Resumo:
Data sheet produced by the Iowa Department of Natural Resources is about different times of animals, insects, snakes, birds, fish, butterflies, etc. that can be found in Iowa.