35 resultados para Environmental Site Design


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in bridge engineering, with the objective of producing safer bridges that have a minimum service life of 75 years and reduced maintenance cost. Material deterioration was identified as one of the primary challenges to achieving the objective of extended life. In substructural applications (e.g., deep foundations), construction materials such as timber, steel, and concrete are subjected to deterioration due to environmental impacts. Using innovative and new materials for foundation applications makes the AASHTO objective of 75 years service life achievable. Ultra High Performance Concrete (UHPC) with compressive strength of 180 MPa (26,000 psi) and excellent durability has been used in superstructure applications but not in geotechnical and foundation applications. This study explores the use of precast, prestressed UHPC piles in future foundations of bridges and other structures. An H-shaped UHPC section, which is 10-in. (250-mm) deep with weight similar to that of an HP10×57 steel pile, was designed to improve constructability and reduce cost. In this project, instrumented UHPC piles were cast and laboratory and field tests were conducted. Laboratory tests were used to verify the moment-curvature response of UHPC pile section. In the field, two UHPC piles have been successfully driven in glacial till clay soil and load tested under vertical and lateral loads. This report provides a complete set of results for the field investigation conducted on UHPC H-shaped piles. Test results, durability, drivability, and other material advantages over normal concrete and steel indicate that UHPC piles are a viable alternative to achieve the goals of AASHTO strategic plan.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

DESCRIPTION OF PROPOSED ACTION This Environmental Assessment (EA) has been prepared in compliance with the requirements of the National Environmental Policy Act of 1969 (NEPA). This EA informs the public and interested agencies of the proposed action and alternatives to the proposed action in order to gather feedback on the improvements under consideration. Proposed Action The Iowa Department of Transportation (Iowa DOT) and the Federal Highway Administration (FHWA) are evaluating potential alternatives to improve IA 122 in the City of Mason City. IA 122/Business US 18 is a primary east-west travel route through the City that transitions from a 4- lane undivided roadway, to 2-lane one-way pairs, then back to a 4-lane undivided roadway (Figure 1-1). The Iowa DOT proposes to flatten the tight reverse curves on the east end of the project. The one-way pairs will be narrowed by eliminating on-street parking along the corridor to more clearly define travel lanes. This will serve to calm traffic flows and reduce crashes along the highway. Additionally, improvements to intersections as well as consolidating or removing access points to improve traffic operations are proposed within the project corridor. A new access road for the Mason City Fire Department on the west end of the project will allow emergency trucks better access to travel south and east. Study Area The primary area of investigation for the Project is generally bounded by IA 122 through Mason City, known locally as 5th and 6th Street Southwest from South Monroe Avenue to South Carolina Avenue. US 65, known locally as Federal Avenue, bisects the study area. At this intersection of US 65 and Iowa 122, the 5th and 6th Street SW changes to 5th and 6th St SE. For the purposes of this discussion, this area will be referred to collectively as the IA 122 corridor. The Study Area boundaries were established to allow the development of a wide range of alternatives that could address the purpose and need for the project. The Study Area is larger than the area proposed for construction activities for the Project. However, some impacts may extend beyond the Study Area; where this occurs, it will be noted and addressed in the Environmental Analysis Section (Section 5). Figure 1-1 outlines the Study Area of the proposed action.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Drainage-basin and channel-geometry multiple-regression equations are presented for estimating design-flood discharges having recurrence intervals of 2, 5, 10, 25, 50, and 100 years at stream sites on rural, unregulated streams in Iowa. Design-flood discharge estimates determined by Pearson Type-III analyses using data collected through the 1990 water year are reported for the 188 streamflow-gaging stations used in either the drainage-basin or channel-geometry regression analyses. Ordinary least-squares multiple-regression techniques were used to identify selected drainage-basin and channel-geometry regions. Weighted least-squares multiple-regression techniques, which account for differences in the variance of flows at different gaging stations and for variable lengths in station records, were used to estimate the regression parameters. Statewide drainage-basin equations were developed from analyses of 164 streamflow-gaging stations. Drainage-basin characteristics were quantified using a geographic-information-system (GIS) procedure to process topographic maps and digital cartographic data. The significant characteristics identified for the drainage-basin equations included contributing drainage area, relative relief, drainage frequency, and 2-year, 24-hour precipitation intensity. The average standard errors of prediction for the drainage-basin equations ranged from 38.6% to 50.2%. The GIS procedure expanded the capability to quantitatively relate drainage-basin characteristics to the magnitude and frequency of floods for stream sites in Iowa and provides a flood-estimation method that is independent of hydrologic regionalization. Statewide and regional channel-geometry regression equations were developed from analyses of 157 streamflow-gaging stations. Channel-geometry characteristics were measured on site and on topographic maps. Statewide and regional channel-geometry regression equations that are dependent on whether a stream has been channelized were developed on the basis of bankfull and active-channel characteristics. The significant channel-geometry characteristics identified for the statewide and regional regression equations included bankfull width and bankfull depth for natural channels unaffected by channelization, and active-channel width for stabilized channels affected by channelization. The average standard errors of prediction ranged from 41.0% to 68.4% for the statewide channel-geometry equations and from 30.3% to 70.0% for the regional channel-geometry equations. Procedures provided for applying the drainage-basin and channel-geometry regression equations depend on whether the design-flood discharge estimate is for a site on an ungaged stream, an ungaged site on a gaged stream, or a gaged site. When both a drainage-basin and a channel-geometry regression-equation estimate are available for a stream site, a procedure is presented for determining a weighted average of the two flood estimates.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Culverts are common means to convey flow through the roadway system for small streams. In general, larger flows and road embankment heights entail the use of multibarrel culverts (a.k.a. multi-box) culverts. Box culverts are generally designed to handle events with a 50-year return period, and therefore convey considerably lower flows much of the time. While there are no issues with conveying high flows, many multi-box culverts in Iowa pose a significant problem related to sedimentation. The highly erosive Iowa soils can easily lead to the situation that some of the barrels can silt-in early after their construction, becoming partially filled with sediment in few years. Silting can reduce considerably the capacity of the culvert to handle larger flow events. Phase I of this Iowa Highway Research Board project (TR-545) led to an innovative solution for preventing sedimentation. The solution was comprehensively investigated through laboratory experiments and numerical modeling aimed at screening design alternatives and testing their hydraulic and sediment conveyance performance. Following this study phase, the Technical Advisory Committee suggested to implement the recommended sediment mitigation design to a field site. The site selected for implementation was a 3-box culvert crossing Willow Creek on IA Hwy 1W in Iowa City. The culvert was constructed in 1981 and the first cleanup was needed in 2000. Phase II of the TR 545 entailed the monitoring of the site with and without the selfcleaning sedimentation structure in place (similarly with the study conducted in laboratory). The first monitoring stage (Sept 2010 to December 2012) was aimed at providing a baseline for the operation of the as-designed culvert. In order to support Phase II research, a cleanup of the IA Hwy 1W culvert was conducted in September 2011. Subsequently, a monitoring program was initiated to document the sedimentation produced by individual and multiple storms propagating through the culvert. The first two years of monitoring showed inception of the sedimentation in the first spring following the cleanup. Sedimentation continued to increase throughout the monitoring program following the depositional patterns observed in the laboratory tests and those documented in the pre-cleaning surveys. The second part of Phase II of the study was aimed at monitoring the constructed self-cleaning structure. Since its construction in December 2012, the culvert site was continuously monitored through systematic observations. The evidence garnered in this phase of the study demonstrates the good performance of the self-cleaning structure in mitigating the sediment deposition at culverts. Besides their beneficial role in sediment mitigation, the designed self-cleaning structures maintain a clean and clear area upstream the culvert, keep a healthy flow through the central barrel offering hydraulic and aquatic habitat similar with that in the undisturbed stream reaches upstream and downstream the culvert. It can be concluded that the proposed self-cleaning structural solution “streamlines” the area upstream the culvert in a way that secures the safety of the culvert structure at high flows while producing much less disturbance in the stream behavior compared with the current constructive approaches.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report is formatted to independently present four individual investigations related to similar web gap fatigue problems. Multiple steel girder bridges commonly exhibit fatigue cracking due to out-of-plane displacement of the web near the diaphragm connections. This fatigue-prone web gap area is typically located in negative moment regions of the girders where the diaphragm stiffener is not attached to the top flange. In the past, the Iowa Department of Transportation has attempted to stop fatigue crack propagation in these steel girder bridges by drilling holes at the crack tips. Other nondestructive retrofits have been tried; in a particular case on a two-girder bridge with floor beams, angles were bolted between the stiffener and top flange. The bolted angle retrofit has failed in the past and may not be a viable solution for diaphragm bridges. The drilled hole retrofit is often only a temporary solution, so a more permanent and effective retrofit is required. A new field retrofit has been developed that involves loosening the bolts in the connection between the diaphragm and the girders. Research on the retrofit has been initiated; however, no long-term studies of the effects of bolt loosening have been performed. The intent of this research is to study the short-term effects of the bolt loosening retrofit on I-beam and channel diaphragm bridges. The research also addressed the development of a continuous remote monitoring system to investigate the bolt loosening retrofit on an X-type diaphragm bridge over a number of months, ensuring that the measured strain and displacement reductions are not affected by time and continuous traffic loading on the bridge. The testing for the first three investigations is based on instrumentation of web gaps in a negative moment region on Iowa Department of Transportation bridges with I-beam, channel, and X-type diaphragms. One bridge of each type was instrumented with strain gages and deflection transducers. Field tests, using loaded trucks of known weight and configuration, were conducted on the bridges with the bolts in the tight condition and after implementing the bolt loosening retrofit to measure the effects of loosening the diaphragm bolts. Long-term data were also collected on the X-diaphragm bridge by a data acquisition system that collected the data continuously under ambient truck loading. The collected data were retrievable by an off-site modem connection to the remote data acquisition system. The data collection features and ruggedness of this system for remote bridge monitoring make it viable as a pilot system for future monitoring projects in Iowa. Results indicate that loosening the diaphragm bolts reduces strain and out-of-plane displacement in the web gap, and that the reduction is not affected over time by traffic or environmental loading on the bridge. Reducing the strain in the web gap allows the bridge to support more cycles of loading before experiencing fatigue, thus increase the service life of the bridge. Two-girder floor beam bridges may also exhibit fatigue cracking in girder webs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In June 2001, the Iowa Department of Transportation announced the imminent closure and disposal of selected highway maintenance facilities as part of cost-cutting measures mandated by the Iowa legislature, an action that was to be completed by July 31, 2001. The DOT recognized that some of these facilities might be "historical sites," which in the Iowa Code are defined as any district, site, building or structure listed on the National Register of Historic Places or identified as eligible for listing in the National Register by the State Historic Preservation Office. Section 303 of the Code requires state agencies to "enter into an agreement with the Department of Cultural Affairs [in which the SHPO is located] to ensure the proper management, maintenance and development of historical sites." The DOT saw this disposal action as an opportunity to compile information about its highway maintenance facilities that could be employed in development of a management program for historic highway maintenance facilities in the future. Subsequently, the DOT authorized a similar study of highway weigh stations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in bridge engineering, with the objective of producing safer bridges that have a minimum service life of 75 years and reduced maintenance cost. Material deterioration was identified as one of the primary challenges to achieving the objective of extended life. In substructural applications (e.g., deep foundations), construction materials such as timber, steel, and concrete are subjected to deterioration due to environmental impacts. Using innovative and new materials for foundation applications makes the AASHTO objective of 75 years service life achievable. Ultra High Performance Concrete (UHPC) with compressive strength of 180 MPa (26,000 psi) and excellent durability has been used in superstructure applications but not in geotechnical and foundation applications. This study explores the use of precast, prestressed UHPC piles in future foundations of bridges and other structures. An H-shaped UHPC section, which is 10-in. (250-mm) deep with weight similar to that of an HP10×57 steel pile, was designed to improve constructability and reduce cost. In this project, instrumented UHPC piles were cast and laboratory and field tests were conducted. Laboratory tests were used to verify the moment-curvature response of UHPC pile section. In the field, two UHPC piles have been successfully driven in glacial till clay soil and load tested under vertical and lateral loads. This report provides a complete set of results for the field investigation conducted on UHPC H-shaped piles. Test results, durability, drivability, and other material advantages over normal concrete and steel indicate that UHPC piles are a viable alternative to achieve the goals of AASHTO strategic plan.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

From Proposed Action: "The proposed action consists of reconstructing the East 1st Street/I-35 interchange with a Diverging Diamond interchange, widening I-35 from four (4) lanes to six (6) lanes, and widening East 1st Street from four (4) lanes to five (5) lanes from Delaware Avenue to Frisk Drive. The project also proposes to reconstruct the intersections of East 1st Street/Creekview Drive and East 1st Street/Frisk Drive."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

From Proposed Action: "Iowa Northland Regional Council of Governments (INRCOG) and the City of Cedar Falls, in coordination with the Iowa Department of Transportation (Iowa DOT) and the Federal Highway Administration (FHWA), are proposing to upgrade and modernize an approximate 4,900-foot segment of Iowa Highway 57 (IA 57), locally known as West 1st Street, in Cedar Falls, Black Hawk County, Iowa."

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The United States Environmental Protection Agency (EPA) has requested the Iowa Department of Public Health (IDPH) to evaluate the health impacts associated with exposure to contaminants of concern that have been found at the former Chamberlain Manufacturing Site. The EPA has been involved in the investigation and remediation of the Former Chamberlain Manufacturing Site since 2005. As part of these investigative activities, on-site soil sampling and both on-and off-site groundwater sampling has been completed. In addition, sub-slab soil gas, indoor air, and ambient air sampling at properties located near the Former Chamberlain Manufacturing Site has been completed. This health consultation addresses potential health risks to the public from exposure to the soil, groundwater and potential vapors within homes or buildings at or near the Former Chamberlain Manufacturing Site. The information in this health consultation was current at the time of writing. Data that emerges later could alter this document’s conclusions and recommendations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Department of Natural Resources (IDNR) has requested that the Iowa Department of Public Health (IDPH) complete an update of the health consultation for the Hills, Iowa Perchlorate Groundwater Contamination Site that was originally completed in June 2004. In this updated health consultation, the IDPH will: 1) summarize background information on this site, 2) summarize the progress of work that has been completed regarding the site, 3) summarize the environmental data that has been collected, 4) summarize toxicological information and regulatory information regarding perchlorate, and 5) provide an update to any conclusions and recommendations from the Iowa Department of Public Health. The Iowa Department of Public Health’s priority is to ensure the Hills community has the best information possible to safeguard its health and the IDNR has the best information to guide its activities. That information is included in the following paragraphs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Prairie Trail Development Area is located in the southern portion of Ankeny, Iowa. This development area is located in an area that was formally occupied by the Des Moines Ordnance Plant. The Des Moines Ordnance Plant was constructed for the production and testing of small arms munitions for use during World War II. The Landfill and Lagoon Complex was utilized for disposal of wastes from the ordnance plant and also from various entities that utilized the site property until 1991. The United States Environmental Protection Agency (EPA) is verseeing the cleanup of the Landfill and Lagoon Complex. A portion of the remainder of the site property had been used for burning of scrap explosives, the storage and disposal of chemicals, a disposal pond, testing of products, and various munitions manufacturing activities. The Iowa Department of Natural Resources (IDNR) is overseeing the cleanup of this remaining portion of the site property. The Iowa Department of Public Health has been contacted by residents within the Prairie Trail Development Area and by individuals that have an interest in relocating to the Prairie Trail Development Area. These residents are concerned with any environmental contamination that will be left after site remedial activities are completed. These residents want to know if any remaining environmental contamination will adversely impact their health or the health of their families.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The U.S. Environmental Protection Agency (EPA) is completing a third five-year review of the E.I. du Pont de Nemours & Co., Inc., County Road X-23 Superfund site in Lee County, Iowa. The site is also known as the Baier and McCarl subsites. The EPA is inviting public comment on whether the current site remedy continues to be protective of public health and the environment. The Iowa Department of Public Health in cooperation with the Agency for Toxic Substances and Disease Registry (ATSDR) prepared this health consultation to review the current status of the Baier and McCarl subsites and to provide an evaluation of the public health status of these subsites. The information in this health consultation was current at the time of writing. Data that emerges later could alter this docum ent’s conclusions and recommendations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The United States Environmental Protection Agency (EPA) has requested the Iowa Department of Public Health (IDPH) Hazardous Waste Site Health Assessment Program to evaluate the health impacts of the proposed remedial strategy to be implemented at the Iowa City Former Manufactured Gas Plant Site (FMGP). The proposed remedial strategy to be implemented incorporates the following: 1) access restrictions through the continued operation of the Iowa-Illinois Manor and restriction on any future water well installation through continued implementation of a local environmental covenant; 2) previous site decommissioning activities that have restricted access to site contaminants; and 3) continued monitoring of the groundwater to ensure that contaminant levels in groundwater remain the same or are declining in concentration. This health consultation addresses potential health risks to people from exposure to the soil and vapors within the property. The information in this health consultation was current at the time of writing. Data that emerges later could alter this document’s conclusions and recommendations.