29 resultados para Electronic data processing - Auditing
Resumo:
Iowa Community Colleges transmit fall enrollment data to the Department of Education after the 14th day of the fall term start date. All data included in this report, except where noted, are taken from the Management Information System (MIS) electronic data files and are confirmed by the community college.
Resumo:
Iowa Community Colleges transmit fall enrollment data to the Department of Education after the 14th day of the fall term start date. All data included in this report, except where noted, are taken from the Management Information System (MIS) electronic data files and are confirmed by the community college.
Resumo:
Iowa Community Colleges transmit fall enrollment data to the Department of Education after the 14th day of the fall term start date. All data included in this report, except where noted, are taken from the Management Information System (MIS) electronic data files and are confirmed by the community college.
Resumo:
Iowa Community Colleges transmit fall enrollment data to the Department of Education after the 14th day of the fall term start date. All data included in this report, except where noted, are taken from the Management Information System (MIS) electronic data files and are confirmed by the community college.
Resumo:
Iowa Community Colleges transmit fall enrollment data to the Department of Education after the 14th day of the fall term start date. All data included in this report, except where noted, are taken from the Management Information System (MIS) electronic data files and are confirmed by the community college.
Resumo:
Iowa Community Colleges transmit fall enrollment data to the Department of Education after the 14th day of the fall term start date. All data included in this report, except where noted, are taken from the Management Information System (MIS) electronic data files and are confirmed by the community college.
Resumo:
Iowa Community Colleges transmit fall enrollment data to the Department of Education after the 14th day of the fall term start date. All data included in this report, except where noted, are taken from the Management Information System (MIS) electronic data files and are confirmed by the community college.
Resumo:
Expanded abstract: Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some new best practices for field staff to assist in the inventory, inspection and maintenance of assets along the roadway. The team has spent the past year working through the complexities of identifying the most appropriate tablet hardware for field data collection. A small scale deployment of tablets occurred in spring of 2013 to collect several safety related assets (culverts, signs, guardrail, and incidents). Data can be collected in disconnected or connected modes and there is an associated desktop environment where data can be viewed and queried after being synced into the master database. The development of a deployment plan and related workflow processes are underway; which will eventually feed information into IA DOTs larger asset management system and make the information available for decision making. The team is also working with the IA DOT Design Office on Computer Aided Drafting (CAD) data processing and the IA DOT Construction office with a new digital As-Built plan process to leverage the complete data life-cycle so information can be developed once and leveraged by the Maintenance staff farther along in the process.
Resumo:
The purpose of this project was to investigate the potential for collecting and using data from mobile terrestrial laser scanning (MTLS) technology that would reduce the need for traditional survey methods for the development of highway improvement projects at the Iowa Department of Transportation (Iowa DOT). The primary interest in investigating mobile scanning technology is to minimize the exposure of field surveyors to dangerous high volume traffic situations. Issues investigated were cost, timeframe, accuracy, contracting specifications, data capture extents, data extraction capabilities and data storage issues associated with mobile scanning. The project area selected for evaluation was the I-35/IA 92 interchange in Warren County, Iowa. This project covers approximately one mile of I-35, one mile of IA 92, 4 interchange ramps, and bridges within these limits. Delivered LAS and image files for this project totaled almost 31GB. There is nearly a 6-fold increase in the size of the scan data after post-processing. Camera data, when enabled, produced approximately 900MB of imagery data per mile using a 2- camera, 5 megapixel system. A comparison was done between 1823 points on the pavement that were surveyed by Iowa DOT staff using a total station and the same points generated through the MTLS process. The data acquired through the MTLS and data processing met the Iowa DOT specifications for engineering survey. A list of benefits and challenges is included in the detailed report. With the success of this project, it is anticipate[d] that additional projects will be scanned for the Iowa DOT for use in the development of highway improvement projects.
Resumo:
This report is divided into two volumes. This volume (Volume I) summarizes a structural health monitoring (SHM) system that was developed for the Iowa DOT to remotely and continuously monitor fatigue critical bridges (FCB) to aid in the detection of crack formation. The developed FCB SHM system enables bridge owners to remotely monitor FCB for gradual or sudden damage formation. The SHM system utilizes fiber bragg grating (FBG) fiber optic sensors (FOSs) to measure strains at critical locations. The strain-based SHM system is trained with measured performance data to identify typical bridge response when subjected to ambient traffic loads, and that knowledge is used to evaluate newly collected data. At specified intervals, the SHM system autonomously generates evaluation reports that summarize the current behavior of the bridge. The evaluation reports are collected and distributed to the bridge owner for interpretation and decision making. Volume II summarizes the development and demonstration of an autonomous, continuous SHM system that can be used to monitor typical girder bridges. The developed SHM system can be grouped into two main categories: an office component and a field component. The office component is a structural analysis software program that can be used to generate thresholds which are used for identifying isolated events. The field component includes hardware and field monitoring software which performs data processing and evaluation. The hardware system consists of sensors, data acquisition equipment, and a communication system backbone. The field monitoring software has been developed such that, once started, it will operate autonomously with minimal user interaction. In general, the SHM system features two key uses. First, the system can be integrated into an active bridge management system that tracks usage and structural changes. Second, the system helps owners to identify damage and deterioration.
Resumo:
Community Colleges of Iowa transmit fiscal year enrollment data to the Department of Education. All data included in this report, except where noted, are taken from the Management Information System (MIS) electronic data files and are confirmed by the community college.
Resumo:
Community Colleges of Iowa transmit fiscal year enrollment data to the Department of Education. All data included in this report, except where noted, are taken from the Management Information System (MIS) electronic data files and are confirmed by the community college.
Resumo:
Community Colleges of Iowa transmit fiscal year enrollment data to the Department of Education. All data included in this report, except where noted, are taken from the Management Information System (MIS) electronic data files and are confirmed by the community college.
Resumo:
Community Colleges of Iowa transmit fiscal year enrollment data to the Department of Education. All data included in this report, except where noted, are taken from the Management Information System (MIS) electronic data files and are confirmed by the community college.