Iowa's secondary roads contain nearly 15,000 bridges which are less than 40 ft (12.2 m) in length. Many of these bridges were built several decades ago and need to be replaced. Box culvert construction has proven to be an adequate bridge replacement technique. Recently a new bridge replacement alternative, called the Air-O-Form method, has emerged which has several potential advantages over box culvert construction. This new technique uses inflated balloons as the interior form in the construction of an arch culvert. Concrete was then shotcreted onto the balloon form. The objective of research project HR-313 was to construct an air formed arch culvert to determine the applicability of the Air-O-Form technique as a county bridge replacement alternative. The project had the following results: The Air-O-Form method can be used to construct a structurally sound arch culvert; and the method must become more economical if it is to compete with box culverts. Continued monitoring should be conducted in order to evaluate the long-term performance of the Air-O-Form method.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Iowa's secondary road network contains nearly 15,000 bridges which are less than 12 m (40 ft) long. Many of these bridges were built several decades ago and need to be replaced. Box culvert construction has proven to be an adequate bridge replacement technique. An alternative to box culverts is the Air-O-Form method of arch culvert construction. The Air-O-Form method has several potential advantages over box culvert construction. The new technique uses inflated balloons as the interior form in the construction of an arch culvert. Concrete is then shotcreted onto the balloon form to complete the arch culvert. The objective of the research project was to construct an air formed arch culvert to determine its applicability as an alternative county bridge replacement technique. The project had the following results: (1) The Air-O-Form method can be used to construct a structurally sound arch culvert; and (2) The method must become more economical if it is to compete with box culverts.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Iowa's public road system of 112,000 miles is one of the largest and the best in the nation. It represents a considerable financial investment of taxpayer revenues over the years. And, it requires a sustained investment to preserve an economical level of transport service into the future. In 1982, a Governor's Blue Ribbon Transportation Task Force evaluated the effectiveness of Iowa's entire transportation system. Four important Task Force recommendations dealt with public road administrative issues in Iowa. These issues were related to: (1) Design criteria and levels of maintenance; (2) Consistency in the use of standards among jurisdictions; (3) Consolidation of maintenance operations at one jurisdiction level; and (4) Jurisdicational authority for roads; The issues formed the background for Research Project HR-265.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The current shortage of highway funds precludes the immediate replacement of most of the bridges that have been evaluated as structurally deficient or functionally obsolete or both. A low water stream crossing (LWSC) affords an economical alternative to the replacement of a bridge with another bridge in many instances. However, the potential liability that might be incurred from the use of LWSCs has served as a deterrent to their use. Nor have guidelines for traffic control devices been developed for specific application to LWSCs. This research addressed the problems of liability and traffic control associated with the use of LWSCs. Input to the findings from this research was provided by several persons contacted by telephone plus 189 persons who responded to a questionnaire concerning their experience with LWSCs. It was concluded from this research that a significant potential for accidents and liability claims could result from the use of LWSCs. However, it was also concluded that this liability could be reduced to within acceptable limits if adequate warning of the presence of an LWSC were afforded to road users. The potential for accidents and liability could further be reduced if vehicular passage over an LWSC were precluded during periods when the road was flooded. Under these conditions, it is believed, the potential for liability from the use of an LWSC on an unpaved, rural road would be even less than that resulting from the continuing use of an inadequate bridge. The signs recommended for use in advance of an LWSC include two warning signs and one regulatory sign with legends as follows: FLOOD AREA AHEAD, IMPASSABLE DURING HIGH WATER, DO NOT ENTER WHEN FLOODED. Use of the regulatory sign would require an appropriate resolution by the Board of Supervisors having responsibility for a county road. Other recommendations include the optional use of either a supple mental distance advisory plate or an advisory speed plate, or both, under circumstances where these may be needed. It was also recommended HR-218 Liability & Traffic Control Considerations for Low Water Stream Crossings that LWSCs be used only on unpaved roads and that they not be used in locations where flooding of an LWSC would deprive dwelling places of emergency ground access.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The objective of this research project was to evaluate the construction and service performance of ammonium phosphate/fly ash (APFA) treated base courses of crushed fines and/or unprocessed sand. Specific test results related to construction of the test sections were included in the 1987 construction report by Iowa State University. The performance of the experimental sections is dealt with in this final report. This 1986 project demonstrated that in all cases the control sections utilizing a Type B base experienced dramatically less cracking in the surface than the APFA treated base sections. The cost per mix and subsequent surface maintenance costs for the APFA base sections, especially those having a substantial amount of limestone, were higher than the Type B base control sections. This type of construction may prove to be economical only when petroleum product costs escalate.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Seal coat and chip seal treatments are commonly used as an economical treatment to provide a new surface to an old asphalt roadway. To be successful, the aggregate or chips must be held in place on the roadway by the asphalt binder over a long period of time. It is common, over time, that the binder becomes aged and brittle and loses its ability to be flexible and hold the aggregate in place. Modifiers have been introduced to extend the life and adhesion characteristics of asphaltic binders.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The use of voids in the mineral aggregate (VMA) criteria for proper mix design of hot mix asphalt (HMA) mixtures is a time honored and fairly successful tool. Recent developments in the field of asphalt mix design have encouraged the use of mixtures with a coarse aggregate structure to resist the affect of heavy traffic loads. By using the equations presented, which account for both aggregate gradation and the volumetric properties of the materials, the mix designer is able to judge the proper VMA requirement for each unique blend of materials. By applying the new equations, the most economical mix may be selected without great risk of reduced durability. Supporting data from field application is presented to illustrate the use of the equations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Road Rater is a dynamic deflection measuring appa-ratus for flexible base pavements. The basic operating principle of the Road Rater is to impart a dynamic loading and measure the resultant movement of the pavement with velocity sensors. This data, when properly adjusted for temperature by use of a nomograph included in this report, can be used to determine pavement life expectancy and estimate overlay thickness required. Road Rater testing will be conducted in the spring, when pave-ments are in their weakest condition, until seasonal correction factors can be developed. The Road Rater does not have sufficient ram weight to effectively evaluate load carrying capacity of rigid pavements. All rigid pavements react similarly to Road Rater testing and generally deflect from 0.65 to 1.30 mils. Research will be continued to evaluate rigid pavements with the Road Rater, however. The Road Rater has proven to be a reliable, trouble free pavement evaluation machine. The deflection apparatus was originally front-mounted, but was rear-mounted during the winter of 1977-78. Since that time, van handling has greatly improved, and front suspension parts are no longer overstressed due to improper weight distribution. The Road Rater provides a fast, economical, nondestructive test method to evaluate flexible pavements. Road Rater test data can be used to predict pavement life, set priorities for asphaltic concrete resurfacing, and design asphaltic concrete overlays. Temperature and seasonal variations significantly affect Road Rater deflection readings and must be considered. A nomograph included in this report adjusts for temperature, but does not correct for seasonal effect. Road Rater testing will be conducted in the spring until seasonal correction factors can be developed. The Road Rater has not successfully evaluated rigid pavements, but research will continue in this area. 1. Recommendations for continuing Road Rater research, evaluation and application are as follows:A computer program should be established to reduce Road Rater raw data (Range and Sensor reading) to HR-178 Road Rater Dynamic Deflections For Determining Structural Rating Of Flexible Pavements mean deflection (mils) and/or structural rating. This computer printout would be similar to present friction testing printouts, and would greatly reduce Road Rater data reduction manpower needs and costs. 2. Seasonal variation study should continue to develop seasonal correction factors. Seasonal test roads will be studied concurrently with routine testing during 1979 to develop this relationship. All Road Rater testing will be conducted in the spring until the seasonal relationship is established. 3. An asphaltic concrete overlay design method should be established based on Road Rater de-flection readings. The AASHTO Interim Guide for Design of Pavement Structures 1972 will be used as a base document for this study. 4. AASHTO Structural numbers should be compared to Road Rater Structural Ratings during 1979 on asphaltic concrete overlay projects. This analysis will enable us to refine Road Rater evaluation of flexible pavements. Roads will be tested before resurfacing and several months

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fast Track concrete has proven to be successful in obtaining high early strengths. This benefit does not come without cost. Special Type III cement and insulating blankets to accelerate the cure add to its expense when compared to conventional paving. This research was intended to determine the benefit derived from the use of insulating blankets to accelerate strength gain in three concrete mixes using Type I cement. The goal was to determine mixes and curing procedures that would result in a range of opening times. This determination would allow the most economical design for a particular project by tailoring it to a specific time restraint. Three mixes of various cement content were tested in the field. Flexural beams were cast for each mix and tested at various ages. Two test sections were placed for each mix, one section being cured with the addition of insulating blankets and the other being cured with only conventional curing compound. Iowa Department of Transportation specifications require 500 psi flexural strength before a pavement can be opened to traffic. Concrete with Fast Track proportions (nominal 7 1/2 bag), Type I cement, and insulating blankets reached that strength in approximately 36 hr, a standard mix (nominal 6 1/2 bag) using the blankets in approximately 48 hr, and the Fast Track proportions with Type I cement without blankets in about 60 hr. The results showed a significant improvement in early strength gain with the use of insulating blankets.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Delamtect was introduced to the Iowa Department of Transportation through a 1975 Federal Highway Administration demonstration project. The Delamtect is a small mobile unit for conducting a rapid bridge deck survey to determine the extent of delaminations (subsurface fractures). Comparison of the Delamtect with manual sounding methods and drilled cores has demonstrated its reliability. This research has shown the Delamtect to be a more effective, more economical and safer method of surveying bridge decks than manual sounding methods. The Delamtect can also be used to provide a measure of the bond within membrane systems.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this research project is to determine if (1) epoxy lane markings will last an entire winter season without replacement, (2) epoxy lane marking is an economical alternative to standard paint on high-traffic multi-lane roadways where lane changing is frequent, and (3) there are worthwhile benefits derived from thorough cleaning of the pavement surface before painting. The success of epoxy lane marking depends on the success of the equipment with which it is mixed and applied. The epoxy lane marking material, if properly mixed and placed on a clean surface, has the durability required to withstand a high traffic volume and frequent lane changes for at least one year.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Iowa's public road system of 112,000 miles is one of the largest and the best in the nation. It represents a considerable financial investment of taxpayer revenues over the years. And, it requires a sustained investment to preserve an economical level of transport service into the future. In 1982, a Governor's Blue Ribbon Transportation Task Force evaluated the effectiveness of Iowa's entire transportation system. Four important Task Force recommendations dealt with public road administrative issues in Iowa. These issues were related to: 1. design criteria and levels of maintenance 2. consistency in the use of standards among jurisdictions 3. consolidation of maintenance operations at one jurisdictional level and 4. jurisdictional authority for roads. The issues formed the background for Research Project HR-265.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The objective of this research study is to evaluate the performance, maintenance requirements and cost effectiveness of constructing reinforced slope along a concrete bikeway overpass with a Geogrid system such as manufactured by Tensar Corporation or Reinforced Earth Company. This final report consists of two separate reports - construction and performance. An earlier design report and work plan was submitted to the Iowa DOT in 1989. From the Design Report, it was determined that the reinforced slope would be the most economical system for this particular bikeway project. Preliminary cost estimates for other design alternatives including concrete retaining walls, gabions and sheet pile walls ranged from $204/L.F. to $220/L.F. The actual final construction cost of the reinforced slope with GEDGRIDS was around $112/L.F. Although, since the reinforced slope system was not feasible next to the bridge overpass because of design constraints, a fair cost comparison should reflect costs of constructing a concrete retaining wall. Including the concrete retaining wall costs raises the per lineal foot cost to around $122/L.F. In addition to this initial construction cost effectiveness of the reinforced slope, there has been little or no maintenance needed for this reinforced slope. It was noted that some edge mowing or weed whacking could be done near the concrete bikeway slab to improve the visual quality of the slope, but no work has been assigned to city crews. It was added that this kind of weed whacking over such steep slope is more difficult and there could possibly be more potential for work related injury. The geogrid reinforced slope has performed really well once the vegetation took control and prevented soil washing across the bikeway slab. To that end, interim erosion control measures might need to be considered in future projects. Some construction observations were noted. First, there i s no specialized experience or equipment required for a contractor to successfully build a low-to-medium geogrid reinforced slope structure. Second, the adaptability of the reinforced earth structure enables the designer to best fit the shape of the structure to the environment and could enhance aesthetic quality. Finally, a reinforced slope can be built with relatively soft soils provided differential settlements between facing are limited to one or two percent.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There are many miles of portland cement concrete pavement in Iowa that due to normal wear, and in some cases accelerated wear from studded tires, the surface has become polished resulting in less than desirable friction values. Retexturing the surface may be an economical way to re-establish desirable friction values. Retexturing by grinding with diamond blades and transverse grooving with diamond blades are two methods of rehabilitating p.c.c. surfaces. MU Inc. of Lebanan, Tennessee proposed to provide without charge to the Iowa Department of Transportation, one 1500 ft x 12 ft section each of three methods of texturing. They are longitudinal grinding, transverse grooving and longitudinal grinding followed by transverse grooving. A section of 1500 feet is needed to properly evaluate a texturing method. It was decided by Iowa DOT personnel that due to possible differential friction it would be undesirable to texture only one lane. The decision was made to do test sections of 1500 ft x 24 ft with the cost of the additional texturing paid by the Iowa DOT. Iowa also has areas where the p.c.c. pavement has faulted at the joints and cracks which results in poor riding quality. Methods of correcting the faulting are to underseal the pavement where needed and/or grinding the surface to eliminate the faulted areas. It was decided to include in this research project a section for profiling by grinding.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A research project involving 2, 3, 4, and 5 in. (5.1, 7.6, 10.2, and 12.7 cm) of bonded portland cement concrete (PCC) overlay on a 1.3 mile (2.1 km) PCC pavement was conducted in Clayton County, Iowa, during September 1977, centering on the following objectives: (1) Determine the mixing and proportioning procedures required in using a conventional, central mix proportioning plant to produce a dense PCC mixture using standard mixes with super water reducing admixtures; (2) Determine the economics, longevity and maintenance performance of a bonded, thin-lift, non-reinforced PCC resurfacing course using conventional procedures, equipment and concrete paving mixtures both with and without super water reducing admixtures; and (3) Determine if an adequate bond between the existing pavement and an overlay of thin-lift, dense, non-reinforced PCC can be obtained with only special surface cleaning and no surface removal or grinding. The conclusions are as follows: (1) Normal mixing equipment and proportioning procedures could be used using a conventional central-mix proportioning plant. This was successful when used with super water reducing admixtures. Only minor changes need be made in procedures and timing. (2) The time has been too short since the completion of the project to determine how the new pavement will perform, however, initially it appears that the method is economical and no reason is seen at this time why the life of the pavement should not be comparable to an all new pavement. (3) The initial test results show that bond strength, regardless of which method of cleaning is used, scarifying, sand blasting or water blasting, far exceed what is considered the minimum bond strength of 200 psi (1379 kPa) except where the paint stripes were intentionally left, thus showing that the paint must be removed. (4) It appears that either cement and water grout or sand, cement and water grout may be used and still obtain the required bond.