21 resultados para Dickinson, Jonathan, 1688-1747


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Dickinson SWCD is applying for $486,800 over three years from the Watershed Improvement Fund to enhance water quality in Dickinson County through an impairment-based, locally directed watershed improvement project dealing specifically with storm water runoff. The LID Project will provide a cost share incentive and technical expertise to individual and business owners in specially targeted districts who are willing to implement low impact development techniques such as rain gardens, bioswales, pervious paving to reduce storm water runoff from their properties. Goals for the project include: 1) Defining and prioritizing urban watersheds in the Iowa Great Lakes region for implementation of Low Impact Development Practices; 2) Providing technical expertise in the form of a graduate assistant/project manager to design and oversee construction; 3) Continuing public education of such practices and their local existence through project kiosk, brochures, County Naturalist programs, local cable television shows, tours and other interactions of the Clean Water Alliance with its 50 partners in the area concerned about water quality; and 4) Completing 125 separate projects over a three year period.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Dickinson County, Iowa for the year ended June 30, 2015

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Newsletter produced by the Division of Deaf Services

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Newsletter produced by Iowa Department of Agriculture and Land Stewardship

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Description of the Proposed Action The Iowa Department of Transportation (Iowa DOT) and the Federal Highway Administration (FHWA) propose to improve a 3.9-mile segment of Iowa Highway 86 (IA 86) from Iowa Highway 9 (IA 9) to near the Minnesota border within Dickinson County, Iowa (the Project). The existing IA 86 has narrow travel lanes and shoulders, steep foreslopes, and poor vertical alignment. Environmental Assessment Availability The Environmental Assessment (EA) for the Project was signed on June 30, 2011, and distributed to selected federal, state, and local resource agencies on July 5, 2011, for review and comment. A Notice of Public Hearing and Environmental Assessment Availability was published in the legal section of the Estherville Daily News on July 5, 2011, and the Ocheyedan Press-Melvin News and Dickinson County News on July 6, 2011. Review and Comment Period A review and comment period was established for receipt of comments on the EA, with an expiration date of August 8, 2011. A public hearing for the Project was held at the Dickinson County Courthouse on July 21, 2011. The public hearing used a combined open forum and formal format. A transcript of this meeting has been prepared and is available upon request.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

East Okoboji Beach was platted on April 20, 1961 and includes over 90.4 acres with 489 lots. The East Okoboji Beach project includes a complete storm water discharge system, which includes low impact development and reconstruction of the roadways in East Okoboji Beach. The East Okoboji Beach Project is an enormous project that is the first Dickinson County project to retrofit LID practices, lake-friendly storm-water drainage systems and roadway reconstruction throughout an existing sub- division. This cooperative project between DNR, Dickinson County, and EOB landowners includes engineering retention ponds, rain gardens, bio-swales and other LID practices to reduce nutrient and sediment pollutants flowing directly into East Okoboji. The nature of the problem stems back to that original plat where small lots were platted and developed without planning for storm water discharge. There was no consideration of the effects of filling in and developing over the many wetland areas existing in EOB. The scope of the problem covers the entire 90.4 acres in East Okoboji Beach, the DNR owned land and the farmed land to the east. The nature of the problem stems from storm water runoff flowing throughout the watershed and into East Okoboji Beach where it flows down self-made paths and then into East Lake Okoboji. That storm water runoff dumps nutrient and sediment pollutions directly into East Lake Okoboji. The expected result of this project is a new roadway and drainage system constructed with engineering that is intended to protect East Lake Okoboji and the land and homes in East Okoboji Beach. The benefit will be the improvement in the waters and the reduction of the siltation in the East Lake Okoboji.