29 resultados para Continuous quality improvement.


Relevância:

80.00% 80.00%

Publicador:

Resumo:

In-lake management can be a critical need for water quality improvement for impaired recreation lakes. Biomanipulation practices to achieve the proper balance of predatory fish, zooplankton grazing of algae, and native aquatic vegetation can sometimes restore water clarity of turbid, nutrient enriched lakes. Lakewood leaders have a renovation plan for Lake Colchester, involving several common and three innovative practices. Lakewood is prepared to pay for proven practices, but seeks WIRB grant support to test innovations in collaboration with Iowa DNR biologists, and ISU limnologists, serving as advisors and monitors for the entire project.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In August, 1994, the Office of Local Systems, Project Development Division, Iowa Department of Transportation established a Quality Improvement Team to review and improve upon the federal-aid project development process. The mission was to communicate federal-aid project development procedures to local agencies, beginning with the approval of the Statewide Transportation Improvement Program (STIP) and ending with obligation of federal funds by the Federal Highway Administration (FHWA). In January 1997, another Team (Make it Better) began meeting to clarify, update, and streamline the federal-aid project process. This Project Development Packet is a compilation of these efforts. The packet includes Project Development timelines, flow charts, guidelines, design criteria, Instructional Memorandums and forms to assist in the federal-aid project development process. The main (fold out) flow chart directs to other sections of the packet when appropriate.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tillage and manure application practices significantly impact surface and ground water quality in Iowa and other Midwestern states. Tillage and manure application that incorporates residue and disturbs soil result in higher levels of soil erosion and surface runoff. Phosphorus and sediment loading are closely linked to the increase in soil erosion and surface water runoff. Manure application (i.e., injection or incorporation) reduces surface residue cover, which can worsen soil erosion regardless of the tillage management system being used. An integrated system approach to manure and tillage management is critical to ensure effi cient nutrient use and improvement of soil and water quality. This approach, however, requires changes in manure application technology and tillage system management to ensure the success of an integrated

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This final report to the Iowa Watershed Improvement Review Board by the City of Remsen Utilities consists of accomplishments made by the Remsen Utilities as per this agreement. The City of Remsen Utilities did in fact purchase approximately 27 acres of land lying upstream of the city’s water well field. The land was purchased from Mr. Larry Rodesch and Mr. Rich Harpenau for the purpose of removing nitrates from Remsen’s water source and establishing native prairie grasses to assist in this removal.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The pmpose of the Watershed Improvement Fund is to enhance the water quality and flood prevention efforts in the state through a variety of impairment-based, locally­ directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enlmnce the water quality and flood prevention efforts in the state through a variety of impairment-based, locally­ directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest eamed on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enhance the water quality in the state through a variety of impairment-based, locally-directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enhance the water quality in the state through a variety of impairment-based, locally-directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Two sections of the Yellow River have been named to the State of Iowa’s 303d list of impaired waters. The listing reflects streams with pollution problems linked to habitat alterations, in addition to those with potential disease causing bacteria, viruses and parasites. This fact, combined with local knowledge of water quality problems, shows the need for land treatment practices and habitat improvement measures. This project would target the Yellow River watershed, which totals approximately 49,800 acres. Areas that drain directly into the Yellow River mainstream will be targeted. Individually, these areas are too small to be considered sub-watersheds. This project will assess the drainage areas for active gullies and prioritize grade stabilization structures based upon severity and impact on the fishery. Funding would be utilized to target high priority grade stabilization structure sites and provide cost-share for those projects. A prerequisite for cost-share allocation is 75% of the land contributing to the drainage area must have some form of treatment in place. The Allamakee SWCD has received an EPA Region 7 Grant toward grade stabilization structures in the same area. Landowners have indicated that 75% cost-share is necessary to implement practices. To meet this request, the EPA funding would be used at a 15% cost-share rate if matched with 60% cost-share from WIRB funding. If matched with Federal EQIP funds, 25% of funds obtained from WIRB would be used. If other funds were depleted, WIRB funds would be utilized for the entire 75% cost-share.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An overall effort has been initiated to improve the quality of the Yellow River in Northeast Iowa by reducing the amount of sediment and bacteria entering the stream. Funding for this project will be utilized to improve stream quality to the level of fully supporting game fish such as brown, rainbow and brook trout, walleye, northern pike and smallmouth bass. The Yellow River has the potential to be one of the top trout streams, not only in Iowa, but in the entire Upper Midwest. This project will greatly enhance recreational activities such as fishing, canoeing and inner tubing and will greatly increase tourism dollars to the state. The project will specifically address two sources of impairment: stream bank erosion and coliform bacteria from both livestock and inadequate human septic systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Watershed Improvement Fund and the Iowa Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The fifteen-member Board conducted seven meetings throughout the year in-person or via teleconference. Meetings were held January 23, February 27, April 17, June 18, July 24, September 25 and December 17. Attachment 1 lists the board members and their organization affiliation. The Board completed one Request For Applications (RFA) for the Watershed Improvement Fund. The RFA was announced November 6, 2014 and closed December 29, 2014. December 29, 2014 Closing Date Request For Applications: The Board received 16 applications in response to this RFA. These applications requested $2.8 million in Watershed Improvement Funds and leveraged an additional $9.1 million for a total of $11.9 million of watershed project activity proposed. After reviewing and ranking the applications individually from this RFA, the Board met and selected eight applications for funding. The eight applications were approved for $1,249,861 of Watershed Improvement Funds. Data on the eight selected projects in this RFA include the following: • These projects included portions of 12 counties. • The $1.2 million requested of Watershed Improvement Funds leveraged an additional $4.2 million for a total of $5.4 million in watershed improvements. • Approved projects ranged in funding from $41,980 to $250,000. Attachment 2 lists the approved projects’ name, applicant name, project length, county or counties where located, and funding amount for the RFA. Attachment 3 is a map showing the status of all projects funded since inception of the program. At the end of 2015 there are 111 completed projects and 39 active projects. In cooperation with the Treasurer of State, the WIRB submitted the 2015 year-end report for the Rebuild Iowa Infrastructure Fund to the Legislative Services Agency and the Department of Management. Attachment 4 contains the 2015 annual progress reports submitted from active projects or projects finished in 2015.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This is the annual appropriations report submitted on behalf of the Watershed Improvement Review Board (WIRB).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

2013 yea end summary for the Watershed Improvement Fund.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A specification for contractor moisture quality control (QC) in roadway embankment construction has been in use for approximately 10 years in Iowa on about 190 projects. The use of this QC specification and the development of the soils certification program for the Iowa Department of Transportation (DOT) originated from Iowa Highway Research Board (IHRB) embankment quality research projects. Since this research, the Iowa DOT has applied compaction with moisture control on most embankment work under pavements. This study set out to independently evaluate the actual quality of compaction using the current specifications. Results show that Proctor tests conducted by Iowa State University (ISU) using representative material obtained from each test section where field testing was conducted had optimum moisture contents and maximum dry densities that are different from what was selected by the Iowa DOT for QC/quality assurance (QA) testing. Comparisons between the measured and selected values showed a standard error of 2.9 lb/ft3 for maximum dry density and 2.1% for optimum moisture content. The difference in optimum moisture content was as high as 4% and the difference in maximum dry density was as high as 6.5 lb/ft3 . The difference at most test locations, however, were within the allowable variation suggested in AASHTO T 99 for test results between different laboratories. The ISU testing results showed higher rates of data outside of the target limits specified based on the available contractor QC data for cohesive materials. Also, during construction observations, wet fill materials were often observed. Several test points indicated that materials were placed and accepted at wet of the target moisture contents. The statistical analysis results indicate that the results obtained from this study showed improvements over results from previous embankment quality research projects (TR-401 Phases I through III and TR-492) in terms of the percentage of data that fell within the specification limits. Although there was evidence of improvement, QC/QA results are not consistently meeting the target limits/values. Recommendations are provided in this report for Iowa DOT consideration with three proposed options for improvements to the current specifications. Option 1 provides enhancements to current specifications in terms of material-dependent control limits, training, sampling, and process control. Option 2 addresses development of alternative specifications that incorporate dynamic cone penetrometer or light weight deflectometer testing into QC/QA. Option 3 addresses incorporating calibrated intelligent compaction measurements into QC/QA.