32 resultados para Audubon Park


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the history of Lake Macbride State Park written by Golda Leighton Jenkinson and dedicated to the Iowa State Conservation Commission. It includes the history of how the park developed through its history as a state park. Numerous pictures are included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Audubon County, Iowa for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Parks, Institutional Road Projects Planning Program produced by the Iowa Department of Transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Provides information on Pilot Knob State Park, Merrick State Park, Eagle Lake State Park, Rice Lake State Park and Crystal, East and West Twin, and Duck Lakes including history, maps, location, terrain, photos, vegetation and wildlife.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Audubon County, Iowa for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report contains the results of the Park and Recreation Enhancement Study Committee on the current and future needs for artificial and natural lakes, state parks, forests, and recreational areas in Iowa and make recommendations on the development of the new facilities and the restoration and management of current facilities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Audubon County, Iowa for the year ended June 30, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Audubon County, Iowa for the year ended June 30, 2006.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An asphalt concrete (ACC) overlay is most often the rehabilitative effort used to maintain the serviceability of either an ACC or PCC pavement. The major problem in durability of this ACC overlay comes from reflective cracking. These cracks usually open, allowing water to enter the unsealed crack and strip the ACC in the overlay. The stripping of the ACC allows accelerated deterioration at the crack. Two engineering fabrics were evaluated in this project in order to determine their effectiveness in reducing reflective cracking. These two materials are: PavePrep, Contech Construction Products, Inc., and Pro-Guard, Phillips Fiber Corporation. A 4.2 km (2.6 mi) roadway in Audubon County was selected for the research project. The roadway was divided into eight test sections. Four of the test sections are conventional resurfacing. The other four sections are split between the two engineering fabrics (two Pro-Guard and two PavePrep). A 75 mm (3 in.) thick overlay was placed over the entire project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This issue review provides an overview of Cedar Rock State Park, that is part of Iowa's park system and managed by the Department of Natural Resources, or DNR.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the City of University Park, Iowa for the year ended June 30, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Audubon County, Iowa for the year ended June 30, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An ACC overlay is most often the rehabilitative effort used to maintain the serviceability of either an ACC or PCC pavement. The major problem in durability of this ACC overlay comes from reflective cracking. These cracks usually open, allowing water to enter the unsealed crack and strip the ACC in the overlay. The stripping of the ACC allows accelerated deterioration at the crack. Two engineering fabrics were evaluated in this project in order to determine their effectiveness in reducing reflective cracking. These two materials are: • PavePrep, Contech Construction Products Inc. • ProGuard, Phillips Fiber Corporation The data indicated a statistically significant decrease in reflective crack formation in the ProGuard fabric sections compared to control. There was little evidence of a similar effect from the PavePrep fabric sections compared to control. However, the rate of cracking (the rate of formation of new cracks) for both fabrics and control tended to be similar after three years. The benefits of using these fabrics (possible delay of some crack formation by two years) on this project did not outweigh the costs of up to $4200.00 per mile.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This booklet, no. 1 in the Park Booklet Series, contains general information, features, history, geology and photos of Ledges State Park.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Central Park Lake Watershed Assessment and Management Plan identified four categories where improvements are needed to remove the 23 acre lake from the impaired waters list. These include the wastewater system, runoff from surrounding lands, in-lake nutrient re-suspension and runoff from hard surfaces within the park. The lake is currently impaired for bacteria, algae and pH. Through outcomes of the Watershed Assessment and Management Plan, this proposal includes for abandonment and reclamation of the single cell wastewater lagoon site, replacement with three conventional septic systems and construction of two wetlands. One of the wetlands is located on the same site as the reclaimed lagoon and the other is located to intercept sediment and trap nutrients transported by tile lines. The prescribed wastewater system improvements are based on assessment by grab samples test by the State Hygienic Lab, development of a Preliminary Engineering Report, soil analysis and communication with IDNR wastewater officials. The two wetland sites were assessed by officials from IDALS and the Jones County SWCD. This project is part of $1.7 million lake restoration effort to reclaim the 47 year old lake. The lake has a positive economic impact of more than $7.6 million annually and supports an average annual visitation of 58,145, according to the Iowa Lakes Valuation Project, conducted by Iowa State University.