In 1975, Kossuth County had 492 miles of asphalt pavements, sixty percent of which were between l5 and 20 years old. Many of these roadways were in need of rehabilitation. Normally, asphaltic resurfacing would be the procedure for correcting the pavement deterioration. There are areas within the state of Iowa which do not have Class I aggregate readily available for asphalt cement concrete paving. Kossuth County is one of those areas. The problem is typified by this project. Limestone aggregate to be incorporated into the asphalt resurfacing had to be hauled 53 miles from the quarry to the plant site. The cost of hauling good quality aggregate coupled with the increasing cost of asphalt cement encouraged Kossuth County to investigate the possibility of asphaltic pavement recycling. Another problem, possibly unique to Kossuth County, was the way the original roadways had been constructed. A good clay soil was present under 3 to 4 feet of poorer soil. In order to obtain this good clay soil for subbase construction, the roadway ditches were excavated 1 to 3 feet into the clay soil layer. The resultant roadway tops were several feet above the surrounding farm land and generally less than 26 feet wide. To bring the existing roadway up to current minimum design width, there were two choices: One was to widen the roadway by truck hauling soil and constructing new 4 to 6 foot shoulders. The cost of widening by this method averaged $36,000 per mile in 1975. The other choice was to remove the old pavement and widen the roadway by lowering the grade line. The desire to provide wider paved roadways gave Kossuth County the additional incentive needed to proceed with a pavement recycling project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The primary objectives of this research project were: 1. Determine and recommend solutions for problems relating to shipping, storing and batching of fly ash. 2. Establish a procedure for batching, mixing and placing uniform concrete with specified air content and consistency. 3. Demonstrate that concrete of comparable quality can be produced.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In May 1950 a proposal for a research project was submitted to the newly formed Iowa Highway Research Board for consideration and action. This project, designated RPSl by the Board, encompassed the study, development, preparation of preliminary plans and specifications for the construction of a wheel track to be used in the accelerated testing of highway pavements. The device envisioned in the proposal was a circular track about seventy-five feet in diameter equipped with a suitable automobile-tired device to test pavements about five feet in width laid into the track under regular construction practices by small scale construction equipment. The Board, upon review, revised and expanded the basic concepts of the project. The project as revised by the Board included a study of the feasibility of developing, constructing and operating an accelerated testing track in which pavements, bases and subgrades may be laid one full lane, or at least ten feet, in width by full size construction equipment in conformity with usual construction practices. The pavements so laid are to be subjected, during test, to conditions as nearly simulating actual traffic as possible.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Heavy traffic volumes frequently cause distress in asphalt pavements which were designed under accepted design methods and criteria. The distress appears in the form of rutting in the wheel tracks and rippling or shoving in areas where traffic accelerates or decelerates. Apparently accepted stability test methods alone do not always assure the desired service performance of asphaltic pavements under heavy traffic. The Bituminous Research Laboratory, Engineering Research Institute of Iowa State University undertook the development of a laboratory device by which the resistance of an asphalt paving mix to displacement under traffic might be evaluated, and also be used as a supplemental test to determine adequacy of design of the mix by stability procedures.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A study was undertaken by the Bituminous Research Laboratory of the Engineering Research Institute at Iowa State University, under the sponsorship of the Iowa Highway Research Board, project HR 100, to ascertain the effects of a number of characteristics and properties of asphaltic concrete mixes upon the service behavior of the mixes as evaluated by the Traffic Simulator and by field observations. The study included: Investigations of the relations, of gradation, fraction and resistance to wear of aggregates; of stability, cohesion, per cent voids and asphalt content: of a number of laboratory and field mixes to service behavior as indicated by the Traffic Simulator under various test conditions. Based upon the results of the tests and the relationships noted, tentative criteria for the Traffic Simulator test were devised, subject to verification by observations and measurements of field service behavior of the mixes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

When mixing asphalt in thin film and at high temperatures, as in the production of asphalt concrete, it has been shown that asphalt will harden due essentially to two factors: (1) losses of volatiles and (2) oxidation. The degree of hardening as expressed by percent loss in penetration varied from as low as 7% to about 57% depending on mixing temperatures, aggregate types, gradation, asphalt content, penetration and other characteristics of asphalts used. Methods used to predict hardening during mixing include loss on heat and thin film oven tests, with the latter showing better correlation with the field findings. However, information on other physical and chemical changes that may occur as a result of mixing in the production of hot-mix asphaltic concrete is limited, The purpose of this research project was to ascertain the changes of asphalt cement properties, both physical and chemical, during mixing operation and to determine whether one or more of the several tests of asphalt cements were critical enough to indicate these changes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The objective of this research was to evaluate the performance of portland cement concrete pavement contraction joints utilizing a variety of sealants and joint preparations and to identify an effective sealant system. The variables evaluated were: (1) sealant material; (2) joint preparation; (3) size of saw cut (sealant reservoir); and (4) the use of backing material. This progress report contains project results to date.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The report documents the development and installation of an instrumented pavement on I-80 in Iowa for the purposes of demonstration and answering current pavement questions. Its two primary objectives include documentation of the installation and verification of existing design procedures through monitoring of the continuous traffic stream reactions in the pavement. Some 120 instruments were installed in a forty foot segment of reconstructed pavement. The instruments included concrete strain gages, weldable strain gages on dowels, LVDT-deflection gages and temperature sensors in the concrete and base material. Five tubes were placed under three joints and two midslabs to measure the relative moisture and density at the interface between the pavement and base with atomic equipment. The instruments were placed ahead of the paving and over 92% of the instruments responded after paving. Planning requirements, problems encountered and costs of installation are presented. The site will use piezoelectric cables in a weigh-in-motion arrangement to trigger the data collection, a microcomputer controlled data acquisition system to analyze multiple sensors simultaneously, and telemetry to monitor the site remotely. Details provide the first time user of instrumentation with valuable information on the planning, problems, costs and coordination required to establish and operate such a site.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The main consideration for base construction under the pavement, in the design of Iowa's interstate, was structural capacity. The material was dense graded with the aim of supporting the pavement and distributing the load as it is transferred to the underlying grade. The drainage characteristics of the base was apparently not given adequate consideration. On jointed portland cement concrete pavement, the water that is trapped immediately beneath the pavement causes severe problems. The traffic causes rapid movement of the water resulting in the hydraulic pressures or "pumping" (movement and redeposit of base fine material), further resulting in faulting between individual slabs. The objective of this evaluation is to determine if longitudinal subdrains are effective in preventing or reducing pumping, faulting and related deterioration. Results suggest that, based upon the flow from the outlets observed during periodic checks and evidence of water flow at the outlets, it appears that to date the subdrains are effective in draining the subbase and subgrade. Because of the limited data available at this time, however, the pavement condition and faulting results are inconclusive.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Construction of the interstate highway system began in 1956. This U.S. network of highway consists of more than 41,000 miles with 790 miles in Iowa. There have been many benefits of the controlled access roadway, but probably the most significant is the improved safety for the motorist. In Iowa, we have always endeavored to utilize quality locally available materials in our construction using the most economical or cost effective methods. Obviously when the effort is to build a cost effective system, there will be some portions of the network that will not perform as well as expected. In the design of our interstate, the main consideration for base construction under the pavement was structural capacity. The material was dense graded with the aim of supporting the pavement and distributing the load as it is transferred to the underlying grade. The drainage characteristic of the base was apparently not given adequate consideration. On jointed portland cement concrete (pcc) pavement, the water that is trapped immediately beneath the pavement causes severe problems. The traffic causes rapid movement of the water resulting in the hydraulic pressures or "pumping" (movement and redeposit of base fine material) resulting in faulting between individual slabs. Recognizing the need for maintaining this large national highway network, the Federal Highway Administration has initiated a funding program for resurfacing, restoration and rehabilitation (3R). Many miles of the system are more than 20 years old and in need of major maintenance. This new 3R Program necessitated a complete inventory of the Iowa interstate system to establish priorities and to identify those sections in need of immediate remedial treatments.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Stopping and turning maneuvers on high traffic volume asphalt cement concrete surfaced roads and streets often causes distortion of the pavement. Distortion may show up as excessive rutting in the wheel path, shoving of the pavement and/or rippling of the surface. Often times repeated corrective work such as cold milling or heater planing is required in these areas to maintain the pavement surface in a reasonable condition. In recent years polymer additives have been developed for asphalt cement concrete paving mixes that show promise in improving the inplace stability of the pavements. AC-13 (Styrelf 13) available from Bitucote Products Company, St. Louis, Missouri is an asphalt cement that has been modified by an additive to exhibit characteristics of very high stability in asphalt mixes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Approximately 40,000 tons of slightly damaged asphalt concrete has been removed from Interstate 80 in Cass and stockpiled. Laboratory tests had indicated that this material had considerable value when upgraded with new aggregate and asphalt cement. This report documents the procedures used and results obtained on an experimental recycling project. It was demonstrated that present drum mixing-recycling equipment and procedures can be used to utilize this material with satisfactory results. Laboratory analyses of material components and mixtures were performed; these analyses indicate mixture can be produced that is uniform, stable, and very closely resembles mixture produced with all new material. Follow~up evaluations will be made to determine the effects of traffic and environment. Preliminary data indicate that plans should be made to incorporate the stockpiled material in projects near the stockpile site.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Department of Transportation research project HR-1013 is the evaluation of a prototype continuous monitoring nuclear density unit. The Unit, the Consolidation Monitoring Device (CMD), mounts on the rear of a slip-form paver and measures the density of the concrete while still in the plastic state. The evaluation performed determined the usefulness, accuracy, precision and reproducibility of the unit. The CMD was calibrated and tested in the laboratory for one week before field evaluation. The field evaluation consisted of monitoring at least 5 miles of paving and then correlating the CMD data with two conventional density methods. The two supplemental methods were density measurement with a Troxler nuclear gauge and densities obtained from core samples.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In some asphaltic concrete mixes asphalt absorption in field mixes is difficult to predict by the routine mix design tests presently being used. Latent or slow absorption in hot mixes is hard to compensate for in field control due to aggregate gradations being near maximum density. If critical asphalt need could be changed by increasing voids in the mineral aggregate so that more freedom could be exercised in compensating for the absorption, this may aid in design. The voids in the mineral aggregate can be related to composite gradation of total aggregate in a mixture, i.e. if a composite gradation of aggregate is finer than that of maximum density curve, the V.M.A. will be greater than that of a mix of maximum density. The typical gradation of Iowa Type 'A' mixes is finer than a gradation which is near the centerline of the specification at sieves larger than the No. 30 and coarser at the lower sieve sizes. The mixes of the typical gradation will have higher V.M.A. than those of the near centerline mixes. By studying properties of the mixes of the typical gradation and comparing them with those of the mixes of maximum density, it may aid in the modification and simplification of our present testing methods and specification requirements while still maintaining control of quality of the mix by controlling voids, stability, gradation and asphalt content.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The primary reason for using steam in the curing of concrete is to produce a high early strength. This high early strength is very desirable to the manufacturers of precast and prestressed concrete units, which often require expensive forms or stress beds. They want to remove the forms and move the units to storage yards as soon as possible. The minimum time between casting and moving the units is usually governed by the strength of the concrete. Steam curing accelerates the gain in strength at early ages, but the uncontrolled use of steam may seriously affect the growth in strength at later ages. The research described in this report was prompted by the need to establish realistic controls and specifications for the steam curing of pretensioned, prestressed concrete bridge beams and concrete culvert pipe manufactured in central plants. The complete project encompasses a series of laboratory and field investigations conducted over a period of approximately three years.