265 resultados para Road Lighting Costs.
Resumo:
Senate File 2355, 85th General Assembly, states the Iowa Department of Transportation shall submit annual reports regarding the implementation of efficiency measures identified in the “Road Use Tax Fund Efficiency Report,” January 2012. This report shall provide details of activities undertaken in the previous year relating to one-time and long-term program efficiencies and partnership efficiencies. Issues to be covered in the reports shall include but are not limited to savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.
Resumo:
The U.S. Environmental Protection Agency (EPA) is completing a third five-year review of the E.I. du Pont de Nemours & Co., Inc., County Road X-23 Superfund site in Lee County, Iowa. The site is also known as the Baier and McCarl subsites. The EPA is inviting public comment on whether the current site remedy continues to be protective of public health and the environment. The Iowa Department of Public Health in cooperation with the Agency for Toxic Substances and Disease Registry (ATSDR) prepared this health consultation to review the current status of the Baier and McCarl subsites and to provide an evaluation of the public health status of these subsites. The information in this health consultation was current at the time of writing. Data that emerges later could alter this docum ent’s conclusions and recommendations.
Resumo:
A resident within one of the counties in your region has expressed some concern regarding potential adverse health effects from dust and material that may be found within foundry slag that has been used as a replacement for road rock. This consultation includes a comparison of nuisance issues from dust generated from a road constructed of foundry slag and dust generated from a road constructed from typical road rock. This consultation also includes a discussion of the potential health effects of exposure of heavy metals from incidental ingestion of foundry slag.
Resumo:
A water quality resource concern has come to the forefront in the Upper Miller Creek watershed in Black Hawk County after five to seven inches of rain fell on the area on May 22nd and 23rd of 2004 and unprecedented amounts of soil and organic debris were washed from cultivated areas, clogging most culverts and roadside ditches. The quantity of soil deposited in ditches gave a good indication of the amounts that were transported into the stream. The estimated total cost to Black Hawk County for cleanup and repair within the road right-of-way was $345,000. There were undetermined environmental costs incurred when the incredibly high volumes of soil washed from the fields into Miller Creek which flows directly into the Cedar River that is identified by the Department of Natural Resources as an impaired water body. The Upper Miller Creek Watershed Project is an innovative, collaborative project intended to meet a specific need identified by a local steering committee made up of concerned community agencies and local landowners. Led by the Soil and Water Conservation District and the Black Hawk County Board of Supervisors, the Miller Creek Watershed Project seeks to reduce soil erosion, improve water quality, and reduce county road infrastructure cost by implementing conservation practices, reducing nutrient and pesticide use and improving wildlife habitat.
Resumo:
Iowa Department of Transportation (Iowa DOT) has re-initiated planning and preliminary design studies to improve U.S. 61 from Memorial Park Road in Burlington north to 1-mile north of IA 78 in Louisa County. The proposed project consists of improving approximately 18 miles of roadway from 2-lanes to 4-lanes and evaluating a potential bypass around Mediapolis.
Resumo:
Through the City Energy Management Program, energy managers will directly work with up to 20 municipalities in Iowa to help identify opportunities to reduce energy costs in city-owned buildings, exterior lighting, and water/wastewater facilities. This assistance will be provided to the selected municipalities who will provide an in-kind match to achieve energy efficiency within their community.
Resumo:
Through the City Energy Management Program, energy managers will directly work with up to 20 municipalities in Iowa to help identify opportunities to reduce energy costs in city-owned buildings, exterior lighting, and water/wastewater facilities. This assistance will be provided to the selected municipalities who will provide an in-kind match to achieve energy efficiency within their community. Power Point of theses resources.
Resumo:
This report is a study of the costs, benefits and impacts of dredging programs for eight Iowa Lakes: Backbone Lake, Black Hawk Lake, Blue Lake, Five Island Lake, Lake Manawa, Mill Creek Lake, Rock Lake and Silver Lake. The studies were done by Economics Research Associates (ERA) and Engineering Consultants, Inc. (ECI) and was commissioned by the Iowa General Assembly to assist in determining public policy with respect to the dredging of the subject lakes.
Resumo:
The Iowa road system has approximately 13,000 miles of Portland Cement Concrete Pavements, many of which are reaching the stage where major rehabilitation is required. Age, greater than anticipated traffic, heavier loads and deterioration related to coarse aggregate in the original pavement are some of the reasons that these pavements have reached this level of distress. One method utilized to rehabilitate distressed or underdesigned PCC pavements is the thin bonded Portland Cement Concrete overlay. Since the introduction of thin bonded overlays on highway pavements in 1973, the concrete paving industry has made progress in reducing the construction costs of this rehabilitation technique. With the advent of the shotblast machine, surface preparation costs have decreased from over $4.00 per square yard to most recently $1.42 per square yard. Other construction costs, including placement, grouting and sawing, have also declined. With each project, knowledge and efficiency have improved.
Resumo:
The object of this research project is to construct and evaluate several bituminous concrete base overlays with various high penetration bituminous products which have the potential to reduce future maintenance and construction costs. In September of 1981 nine different bituminous test sections were constructed on Osceola County roads A-34 and A-46 east of Ashton. Asphalt binders used were AC-5 asphalt cement, SC-800 liquid asphalt, MC-3000 cutback asphalt, CSS-1 emulsion and HFMS-2 emulsion. Aggregate for four of the test sections consisted of salvaged bituminous pavement and new aggregate combined. Each section was road mixed using a different binder arid placed 2-1/4" thick with a motor patrol. The other five test sections consisted of an AC-5 Type B asphalt concrete control section and four plant-mixed, cold-laid bituminous concrete overlay sections using new aggregate. The material was mixed in a continuous drum mix plant and laid with a full width paver.