312 resultados para Minimal action
Resumo:
The Division of Community Action Agencies is located within the Iowa Department of Human Rights and is the focal point for Community Action Agency activities within Iowa government. The Division of Community Action Agencies exists to develop and expand the capacity at the community level to assist families and individuals to achieve economic and social self-sufficiency, and to ensure that the basic energy needs of Iowa’s low-income population are met. The Division is comprised of the Bureau of Community Services, the Bureau of Energy Assistance and the Bureau of Weatherization.
Resumo:
On June 24, 2010, the Rebuild Iowa Office (RIO) held a discussion-based tabletop exercise for the purpose of creating a framework to support disaster recovery coordination within the State of Iowa. The exercise design team was composed of RIO and Iowa Homeland Security and Emergency Management Division (HSEMD) staff. Initial planning for the Iowa Disaster Recovery Tabletop Exercise began in February 2010, in response to recommendations by the Rebuild Iowa Advisory Commission and the Rebuild Iowa Coordinating Council. Both of these groups were organized in direct response to the 2008 Iowa disasters to help establish a path for Iowa’s recovery and monitor progress toward meeting established goals. Recommendations included formalizing the responsibilities of the RIO as they relate to 2008 disasters, capturing lessons learned, and determining what a recovery model should look like for Iowa’s future disasters.
Resumo:
Each department will submit by July 31st an Affirmative Action/Diversity Plan to DAS, who will receive it on behalf of the Diversity Council. This document is to report on your activities and accomplishments for FY 2008, and report on your intended activities for FY 2009. For the purposes of this document, the term protected classes refers specifically to females, minorities, and persons with disabilities. Protected classes may be subject to numerical goal setting in employment. The term diversity includes the protected classes, but also includes broader differences, such as age, sexual orientation, and religion. These differences are not subject to numerical goal setting in employment, but may be protected by non-discrimination statutes and policies. Please refer to Executive Order Four and the State’s EEO/AA Policy for more details.
Resumo:
In July 2008, you submitted an FY 2009 State of Iowa Diversity Plan and Report to DAS. In this report, your agency outlined your goals in the areas of hiring practices, recruitment, retention, training, and general programs to promote diversity. In the following pages, please summarize your stated goals for FY 2009 and the progress you made in achieving those goals in FY 2009. You may attach supplemental information as needed. Please note that the State of Iowa Diversity Plan and Report is being replaced by the FY 2010 Workforce Plan, which is due to DAS by July 31, 2009.
Resumo:
The State prohibits discrimination on the basis of race, creed, color, religion, national origin, sex and sexual orientation, age, or mental and physical disability in its employment policies and practices and is an equal employment opportunity and affirmative action employer. Please insert any additional statements of policy or commitment to achieving and maintaining a diverse workforce in your agency.
Resumo:
This investigation was initiated to determine the causes of a rutting problem that occurred on Interstate 80 in Adair County. 1-80 from Iowa 25 to the Dallas County line was opened to traffic in November, 1960. The original pavement consisted of 4-1/2" of asphalt cement concrete over 12" of rolled stone base and 12" of granular subbase. A 5-1/2" overlay of asphalt cement concrete was placed in 1964. In 1970-1972, the roadway was resurfaced with 3" of asphalt cement concrete. In 1982, an asphalt cement concrete inlay, designed for a 10-year life, was placed in the eastbound lane. The mix designs for all courses met or exceeded all current criteria being used to formulate job mixes. Field construction reports indicate .that asphalt usage, densities, field voids and filler bitumen determinations were well within specification limits on a very consistent basis. Field laboratory reports indicate that laboratory voids for the base courses were within the prescribed limits for the base course and below the prescribed limits for the surface course. Instructional memorandums do indicate that extreme caution should be exercised when the voids are at or near the lower limits and traffic is not minimal. There is also a provision that provides for field voids controlling when there is a conflict between laboratory voids and field voids. It appears that contract documents do not adequately address the directions that must be taken when this conflict arises since it can readily be shown that laboratory voids must be in the very low or dangerous range if field voids are to be kept below the maximum limit under the current density specifications. A rut depth survey of January, 1983, identified little or no rutting on this section of roadway. Cross sections obtained in October, 1983, identified rutting which ranged from 0 to 0.9" with a general trend of the rutting to increase from a value of approximately 0.3" at MP 88 to a rut depth of 0.7" at MP 98. No areas of significant rutting were identified in the inside lane. Structural evaluation with the Road Rater indicated adequate structural capacity and also indicated that the longitudinal subdrains were functioning properly to provide adequate soil support values. Two pavement sections taken from the driving lane indicated very little distortion in the lower 7" base course. Essentially all of the distortion had occurred in the upper 2" base course and the 1..;1/2" surface course. Analysis of cores taken from this section of Interstate 80 indicated very little densification of either the surface or the upper or lower base courses. The asphalt cement content of both the Type B base courses and the Type A surface course were substantially higher than the intended asphalt cement content. The only explanation for this is that the salvaged material contained a greater percent of asphalt cement than initial extractions indicated. The penetration and viscosity of the blend of new asphalt cement and the asphalt cement recovered from the salvaged material were relatively close to that intended for this project. The 1983 ambient temperatures were extremely high from June 20 through September 10. The rutting is a result of a combination of adverse factors including, (1) high asphalt content, (2) the difference between laboratory and field voids, (3) lack of intermediate sized crushed particles, (4) high ambient temperatures. The high asphalt content in the 2" upper base course produced an asphalt concrete mix that did not exhibit satisfactory resistance to deformation from heavy loading. The majority of the rutting resulted from distortion of the 2" upper base lift. Heater planing is recommended as an interim corrective action. Further recommendation is to design for a 20-year alternative by removing 2-1/2" of material from the driving lane by milling and replacing with 2-1/2" of asphalt concrete with improved stability. This would be .followed by placing 1-1/2" of high quality resurfacing on the entire roadway. Other recommendations include improved density and stability requirements for asphalt concrete on high traffic roadways.
Resumo:
Agency performancce plan and action plan for the Iowa Civil Rights Commission
Resumo:
Agency performancce plan and action plan for the Iowa Civil Rights Commission
Resumo:
The objectives of the project were to develop methodologies for (i) prediction and measurement of the magnitude of pressure which develops within pores of saturated porous materials upon freezing, (ii) determination of pore structure (pore size distribution) of porous materials; (iii) prediction and measurement of the rate with which pore ice grows; and (iv) prediction of frost susceptibility of porous materials with varying pore structures. As with all research endeavors solution of one problem leads to another one and this project was no exception. Emergence of new problems and the measures taken as the work progressed were discussed in progress reports submitted to the board. This final report will discuss only the conclusive finds and suggest measures to be taken for future investigations. The theory discussed in the proposal is not repeated in this report for the sake of brevity. However, the paper published as part of this project containing the theory is attached as Appendix I for the reader interested in the theory. In conformity with the objectives, this report consists of four parts. In accordance with the project contract two ice porosimeters were built and one will be delivered to the Iowa DOT after training of a DOT technician under the supervision of Mr. Wendell Dubberke with assistance from ISU researchers. During the training period debugging and further improvements in software will continue.
Resumo:
Retailer newsletter
Resumo:
Iowa Lottery Retailer Newsletter
Resumo:
Iowa Lottery Retailer Newsletter
Resumo:
Iowa Lottery Retailer Newsletter
Resumo:
Iowa Lottery Retailer Newsletter
Resumo:
Iowa Lottery Retailer Newsletter