396 resultados para Bridges Design and construction Standards Queensland
Resumo:
The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.
Resumo:
Nationwide, about five cents of each highway construction dollar is spent on culverts. In Iowa, average annual construction costs on the interstate, primary, and federal-aid secondary systems are about $120,000,000. Assuming the national figure applies to Iowa, about $6,000,000 are spent on culvert construction annually. For each one percent reduction in overall culvert costs, annual construction costs would be reduced by $60,000. One area of potential cost reduction lies in the sizing of the culvert. Determining the flow area and hydraulic capacity is accomplished in the initial design of the culvert. The normal design sequence is accomplished in two parts. The hydrologic portion consists of the determination of a design discharge in cubic feet per second using one of several available methods. This discharge is then used directly in the hydraulic portion of the design to determine the proper type, size, and shape of culvert to be used, based on various site and design restrictions. More refined hydrologic analyses, including rainfall-runoff analysis, flood hydrograph development, and streamflow routing techniques, are not pursued in the existing design procedure used by most county and state highway engineers.
Resumo:
This document summarizes the discussion and findings of a workshop on intelligent compaction for soils and hot-mix asphalt held in West Des Moines, Iowa, on April 2–4, 2008. The objective of the meeting was to provide a collaborative exchange of ideas for developing research initiatives that accelerate implementation of intelligent compaction (IC) technologies for soil, aggregates, and hot mix asphalt. Technical presentations, working breakout sessions, a panel discussion, and a group implementation strategy session comprised the workshop activities. About 100 attendees representing state departments of transportation, Federal Highway Administration, contractors, equipment manufacturers, and researchers participated in the workshop.
Resumo:
This document summarizes the discussion and findings of a workshop on intelligent technologies for earthwork construction held in West Des Moines, Iowa, on April 14–16, 2009. This meeting follows a similar workshop conducted in 2008. The objective of the meeting was to provide a focused discussion on identifying research and implementation needs/strategies to advance intelligent compaction and automated machine guidance technologies. Technical presentations, interactive working breakout sessions, and a panel discussion comprised the workshop. About 100 attendees representing state departments of transportation, Federal Highway Administration, contractors, equipment manufacturers, and researchers participated in the workshop.
Resumo:
Highway agencies spend millions of dollars to ensure safe and efficient winter travel. However, the effectiveness of winter weather maintenance practices on safety and mobility are somewhat difficult to quantify. Phase I of this project investigated opportunities for improving traffic safety on state-maintained roads in Iowa during winter weather conditions. The primary objective was to develop several preliminary means for the Iowa Department of Transportation (DOT) to identify locations of possible interest systematically with respect to winter weather-related safety performance based on crash history. Specifically, metrics were developed to assist in identifying possible habitual, winter weather-related crash sites on state-maintained rural highways in Iowa. In addition, the current state of practice, for both domestic and international highway agency practices, regarding integration of traffic safety- and mobility-related data in winter maintenance activities and performance measures were investigated. This investigation also included previous research efforts. Finally, a preliminary work plan, focusing on systematic use of safety-related data in support of winter maintenance activities and site evaluation, was prepared.
Resumo:
A previous study sponsored by the Smart Work Zone Deployment Initiative, “Feasibility of Visualization and Simulation Applications to Improve Work Zone Safety and Mobility,” demonstrated the feasibility of combining readily available, inexpensive software programs, such as SketchUp and Google Earth, with standard two-dimensional civil engineering design programs, such as MicroStation, to create animations of construction work zones. The animations reflect changes in work zone configurations as the project progresses, representing an opportunity to visually present complex information to drivers, construction workers, agency personnel, and the general public. The purpose of this study is to continue the work from the previous study to determine the added value and resource demands created by including more complex data, specifically traffic volume, movement, and vehicle type. This report describes the changes that were made to the simulation, including incorporating additional data and converting the simulation from a desktop application to a web application.
Roadway Lighting and Safety: Phase II – Monitoring Quality, Durability and Efficiency, November 2011
Resumo:
This Phase II project follows a previous project titled Strategies to Address Nighttime Crashes at Rural, Unsignalized Intersections. Based on the results of the previous study, the Iowa Highway Research Board (IHRB) indicated interest in pursuing further research to address the quality of lighting, rather than just the presence of light, with respect to safety. The research team supplemented the literature review from the previous study, specifically addressing lighting level in terms of measurement, the relationship between light levels and safety, and lamp durability and efficiency. The Center for Transportation Research and Education (CTRE) teamed with a national research leader in roadway lighting, Virginia Tech Transportation Institute (VTTI) to collect the data. An integral instrument to the data collection efforts was the creation of the Roadway Monitoring System (RMS). The RMS allowed the research team to collect lighting data and approach information for each rural intersection identified in the previous phase. After data cleanup, the final data set contained illuminance data for 101 lighted intersections (of 137 lighted intersections in the first study). Data analysis included a robust statistical analysis based on Bayesian techniques. Average illuminance, average glare, and average uniformity ratio values were used to classify quality of lighting at the intersections.
Resumo:
The State of Iowa [STATE] and the Iowa Department of Transportation [IDOT] hereby is claim any warranty of any kind, express or implied, in reference to the information contained herein. The STATE and the IDOT neither assume nor authorize any person to assume for the STATE or the IDOT any liability in connection with the information contained herein, and there are no oral agreements or warranties regarding the information contained herein. Each and every person is hereby notified that the vertical clearances specified herein are subject to change due to resurfacing, surface buckling, weather conditions, or any other event. It is the responsibility of each and every vehicle operator to ascertain whether sufficient ACTUAL vertical clearance exists to move his vehicle or motor vehicle between the roadway and the underpasses and bridges listed herein. The May 15 date on this map reflects the end of the update schedule for the previous calendar year. Any vertical clearance restrictions which could or may change AFTER this date will not be reflected on this map. For the latest information on vertical clearance restrictions call the Office of Motor Carrier Services in Ankeny, (515) 237-3264 or visit http://www.iowadot.gov/mvd/omcs.
Resumo:
Map produced by Iowa Department of Transportation about Iowa Commercial and Industrial Network.
Resumo:
The film depicts period traffic congestion, sharp and winding sections of road, steep hills making trucks slow to a crawl, and dangerous vehicle and pedestrian crossings, all important reasons why highway design and safety improvements, and highway relocation were needed. In fact, when the film was produced, U.S. 30 or the Lincoln Highway was the busiest primary road in Iowa; and the section between State Center and Boone was deemed “critical,” meaning it was considered dangerous by the ISHC’s Efficiency Standards.
Resumo:
Debris accumulation on bridge piers is an on-going national problem that can obstruct the waterway openings at bridges and result in significant erosion of stream banks and scour at abutments and piers. In some cases, the accumulation of debris can adversely affect the operation of the waterway opening or cause failure of the structure. In addition, removal of debris accumulation is difficult, time consuming, and expensive for maintenance programs. This research involves a literature search of publications, products, and pier design recommendations that provide a cost effective method to mitigate debris accumulation at bridges. In addition, a nationwide survey was conducted to determine the state-of-the-practice and the results are presented within.
Resumo:
This report presents a review of literature on geosynthetic reinforced soil (GRS) bridge abutments, and test results and analysis from two field demonstration projects (Bridge 1 and Bridge 2) conducted in Buchanan County, Iowa, to evaluate the feasibility and cost effectiveness of the use of GRS bridge abutments on low-volume roads (LVRs). The two projects included GRS abutment substructures and railroad flat car (RRFC) bridge superstructures. The construction costs varied from $43k to $49k, which was about 50 to 60% lower than the expected costs for building a conventional bridge. Settlement monitoring at both bridges indicated maximum settlements ≤1 in. and differential settlements ≤ 0.2 in transversely at each abutment, during the monitoring phase. Laboratory testing on GRS fill material, field testing, and in ground instrumentation, abutment settlement monitoring, and bridge live load (LL) testing were conducted on Bridge 2. Laboratory test results indicated that shear strength parameters and permanent deformation behavior of granular fill material improved when reinforced with geosynthetic, due to lateral restraint effect at the soilgeosynthetic interface. Bridge LL testing under static loads indicated maximum deflections close to 0.9 in and non-uniform deflections transversely across the bridge due to poor load transfer between RRFCs. The ratio of horizontal to vertical stresses in the GRS fill was low (< 0.25), indicating low lateral stress on the soil surrounding GRS fill material. Bearing capacity analysis at Bridge 2 indicated lower than recommended factor of safety (FS) values due to low ultimate reinforcement strength of the geosynthetic material used in this study and a relatively weak underlying foundation layer. Global stability analysis of the GRS abutment structure revealed a lower FS than recommended against sliding failure along the interface of the GRS fill material and the underlying weak foundation layer. Design and construction recommendations to help improve the stability and performance of the GRS abutment structures on future projects, and recommendations for future research are provided in this report.
Resumo:
Tort claims resulting from alleged highway defects have introduced an additional element in the planning, design, construction, and maintenance of highways. A survey of county governments in Iowa was undertaken in order to quantify the magnitude and determine the nature of this problem. This survey included the use of mailed questionnaires and personal interviews with County Engineers. Highway-related claims filed against counties in Iowa amounted to about $52,000,000 during the period 1973 through 1978. Over $30,000,000 in claims was pending at the end of 1978. Settlements of judgments were made at a cost of 12.2% of the amount claimed for those claims that had been disposed of, not including costs for handling claims, attorney fees, or court costs. There was no clear time trend in the amount of claims for the six-year period surveyed, although the anount claimed in 1978 was about double the average for the preceding five years. Problems that resulted in claims for damages from counties have generally related to alleged omissions in the use of traffic control devices or defects, often temporary, resulting from alleged inadequacies in highway maintenance. The absence of stop signs or warning signs often has been the central issue in a highway-related tort claim. Maintenance problems most frequently alleged have included inadequate shoulders, surface roughness, ice o? snow conditions, and loose gravel. The variation in the occurrence of tort claims among 85 counties in Iowa could not be related to any of the explanatory variables that were tested. Claims hppeared to have occurred randomly. However, using data from a subsample of 11 counties, a significant relationship was shown probably to exist between the amount of tort claims and the extensiveness of use of wcirning signs on the respective county road systems. Although there was no indication in any county that their use of warning signs did not conform with provisions of the Manual on Uniform Traffic Control Devices (Federal Highway Administration, Government Printing Office, Washington, D.C., 1978), many more warning signs were used in some counties than would be required to satisfy this minimum requirement. Sign vandalism reportedly is a problem in all counties. The threat of vandalism and the added costs incurred thereby have tended to inhibit more extensive use of traffic control devices. It also should be noted that there is no indication from this research of a correlation between the intensiveness of sign usage and highway safety. All highway maintenance activities introduce some extraordinary hazard for motorists. Generally effective methodologies have evolved for use on county road systems for routine maintenance activities, procedures that tend to reduce the hazard to practical and reasonably acceptable levels. Blading of loose-surfaced roads is an examples such a routine maintenance activity. Alternative patterns for blading that were investigated as part of this research offered no improvements in safety when compared with the method in current use and introduced a significant additional cost that was unacceptable, given the existing limitations in resources available for county roads.
Resumo:
Calcium magnesium acetate (CMA) has been identified by Bjorksten Research Laboratories as an environmentally harmless alternative to sodium or calcium chloride for deicing highways. Their study found CMA to be noncorrosive to steel, aluminum and zinc with little or no anticipated environmental impact. When used, it degrades into elements found in abundance in nature. The deicing capabilities were found to be similar to sodium chloride. The neutralized CMA they produced did cause scaling of PC concrete, but they did not expect mildly alkaline CMA to have this effect. In the initial investigation of CMA at the Iowa DOT laboratory, it was found that CMA produced from hydrated lime and acetic acid was a light, fluffy material. It was recognized that a deicer in this form would be difficult to effectively distribute on highways without considerable wind loss. A process was developed to produce CMA in the presence of sand to increase particle weight. In this report the product of this process, which consists of sand particles coated with CMA, is referred to as "CMA deicer". The mixture of salts, calcium magnesium acetate, is referred to as "CMA". The major problems with CMA for deicing are: (1) it is not commercially available, (2) it is expensive with present production methods and (3) there is very little known about how it performs on highways under actual deicing conditions. In view of the potential benefits this material offers, it is highly desirable to find solutions or answers to these problems. This study provides information to advance that effort.
Resumo:
An experimental modification of the transverse groove surface texture of a section of an urban interstate highway was performed by the Iowa Department of Transportation. Transverse groove texturing i s a design feature required by the Federal Highway Administration t o reduce skidding under wet pavement conditions. Adjacent residents claimed the texturing was the cause of especially annoying tonal characteristics within the traffic noise. A research proposal to modify the existing texture pattern by surface grinding and to study the noise and friction effects was approved for funding by the Iowa Highway Research Board. Results i n the form of a comparison between traffic noise before modification and traffic noise immediately after and 15 months after modification indicate that the change in surface texture has lowered overall traffic noise levels by reducing a high frequency component of the traffic noise spectrum. Fraffic testing data show reduced capacity of the roadway to inhibit wet pavement skidding as a result of the surface modification.