The Iowa State Highway Commission purchased a Conrad automatic freeze and thaw machine and placed it in operation during October 1961. There were a few problems, but considering, the many electrical and mechanical devices used in the automatic system it has always functioned quite well. Rapid freezing and thawing of 4"x4"xl8" concrete beams has been conducted primarily in accordance with ASTM C-29l (now ASTM C-666 procedure B) at the rate of one beam per day. Over 4000 beams have been tested since 1961, with determination of the resulting durability factors. Various methods of curing were used and a standard 90 day moist cure was selected. This cure seemed to yield durability factors that correlated very well with ratings of coarse aggregates based on service records. Some concrete beams had been made using the same coarse aggregate and the durability factors compared relatively well with previous tests. Durability factors seemed to yield reasonable results until large variations in durability factors were noted from beams of identical concrete mix proportions in research projects R-234 and R-247. This then presents the question "How reliable is the durability as determined by ASTM C-666?" This question became increasingly more important when a specification requiring a minimum durability factor for P.C. concrete made from coarse aggregates was incorporated into the 1972 Standard Specification for coarse aggregates for concrete.
Resumo:
The large concrete placements at the Burlington Bridge were expected to cause great temperature differentials within the individual placements. In an attempt to reduce cracking due to the large temperature differentials, the Iowa Department of Transportation required that contractors continuously monitor the temperatures and temperature differentials in the concrete placement to assure that the temperature differentials did not exceed 35 deg F. It was felt that if temperature differentials remained below 35 deg F, cracking would be minimized. The following is a summary of the background of the project, and what occurred during individual concrete placements. The following conclusions were drawn: 1) Side temperatures are cooler and more greatly affected by ambient air temperatures; 2) When the 35 deg F limit was exceeded, it was almost exclusively the center to side differential; 3) The top temperature increases substantially when a new pour is placed; 4) The use of ice and different cement types did seem to affect the overall temperature gain and the amount of time taken for any one placement to reach a peak, but did not necessarily prevent the differentials from exceeding the 35 deg F limit, nor prevent cracking in any placement; and 5) Larger placements have a greater tendency to exceed the differential limit.
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 4 - Transportation Planning and Traffic Monitoring. Hands on examples of applications of metric measurements in the development of planning reports and traffic data collection are included in this module.
Resumo:
Discarded tires present major disposal and environmental problems. One method of recycling tires is to use finely ground rubber from tires in asphalt cement concrete (ACC). This process has been researched in Iowa since 1991. There are currently eight projects being researched. This project involved using crumb rubber modifier (CRM) in ACC using a dry process. This project is located on US 63 in Howard County. It involved 17 test sections. There were five test sections using 20 lb of CRM per ton, four test sections using 10 lb of CRM per ton and eight test sections using a conventional mix. Not only were different mixes used, but the overlay was also placed in various thicknesses ranging from 2 in. to 8 in. (5 cm to 20 cm). The project was completed in August 1994. The project construction went well with only minor problems. This report contains information about procedures and tests that were completed and those that will be completed. Evaluation on the project will continue for five years.
Resumo:
A review of the Iowa Department of Transportation's field data collection and reporting system has been performed. Included were several systems used by the Office of Construction and Local Jurisdictions. The entire field data collection and reporting systems for asphalt cement concrete (ACC) paving, portland cement concrete (PCC) paving, and PCC structures were streamlined and computerized. The field procedures for materials acceptance were also reviewed. Best practices were identified and a method was developed to prioritize materials so transportation agencies could focus their efforts on high priority materials. Iowa State University researchers facilitated a discussion about Equal Employment Opportunity (EEO) and Affirmative Action (AA) procedures between the Office of Construction field staff and the Office of Contracts. A set of alternative procedures was developed. Later the Office of Contracts considered these alternatives as they developed new procedures that are currently being implemented. The job close-out package was reviewed and two unnecessary procedures were eliminated. Numerous other procedures were reviewed and flowcharted. Several changes have been recommended that will increase efficiency and allow staff time to be devoted to higher priority activities. It is estimated the improvements in ACC paving, PCC paving and structural concrete will by similar to three full time equivalent (FTE) positions to field construction, field materials and Office of Materials. Elimination of EEO interviews will be equivalent to one FTE position. It is estimated that other miscellaneous changes will be equivalent to at least one other FTE person. This is a total five FTEs. These are conservative estimates based on savings that are easily quantified. It is likely that total positive effect is greater when items that are difficult to quantify are considered.
Resumo:
The need for upgrading a large number of understrength bridges in the United States has been well documented in the literature. This manual presents two methods for strengthening continuous-span composite bridges: post-tensioning of the positive moment regions of the bridge stringers and the addition of superimposed trusses at the piers. The use of these two systems is an efficient method of reducing flexural overstresses in undercapacity bridges. Before strengthening a given bridge however, other deficiencies (inadequate shear connection, fatigue problems, extensive corrosion) should be addressed. Since continuous-span composite bridges are indeterminant structures, there is longitudinal and transverse distribution of the strengthening axial forces and moments. This manual basically provides the engineer with a procedure for determining the distribution of strengthening forces and moments throughout the bridge. As a result of the longitudinal and transverse force distribution, the design methodology presented in this manual for continuous-span composite bridges is extremely complex. To simplify the procedure, a spreadsheet has been developed for use by practicing engineers. This design aid greatly simplifies the design of a strengthening system for a given bridge in that it eliminates numerous tedious hand calculations, computes the required force and moment fractions, and performs the necessary iterations for determining the required strengthening forces. The force and moment distribution fraction formulas developed in this manual are primarily for the Iowa DOT V12 and V14 three-span four-stringer bridges. These formulas may be used on other bridges if they are within the limits stated in this manual. Use of the distribution fraction formulas for bridges not within the stated limits is not recommended.
Resumo:
Asphalt concrete resurfacing is the most commonly utilized rehabilitation practice used by the Iowa Department of Transportation. The major problem with asphalt concrete resurfacing is the reflective cracking from underlying cracks and joints in the portland cement concrete (PCC) pavement. Cracking and seating the PCC prior to an asphalt overlay was the construction method evaluated in this project. There was cracking and seating on portions of the project and portions were overlaid without this process. There were also different overlay thicknesses used. Comparisons of crack and seating to the normal overlay method and the different depths are compared in this report. Cracking and seating results in some structural loss, but does reduce the problem of reflection cracking.
Resumo:
Corroded, deteriorated, misaligned, and distorted drainage pipes can cause a serious threat to a roadway. Normal practice is to remove and replace the damaged drainage structure. An alternative method of rehabilitating these structures is to slip line them with a polyethylene liner. Twelve drainage structures were slip lined with polyethylene liners during 1994 in Iowa. Two types of liners installed were "Culvert Renew" and "Snap-Tite". It was found that the liners could be easily installed by most highway, county, and city maintenance departments. The liners restore the flow and increase the service life of the original drainage structure. The liners were found to be cost competitive with the removal and replacement of the existing drainage structure. Slip lining has the largest economic benefit when the roadway is paved, the culvert is under a deep fill, or traffic volumes are high. The annular space between the original pipe and the liner was filled with flowable mortar. Care should be taken to properly brace and grout the annular space between the liner and the culvert.
Resumo:
Two composite, prestressed, steel beams, fabricated by slightly different methods, were fatigue tested to destruction. Stresses and deflections were measured at regular intervals, and the behavior of each beam as failure progressed was recorded. Residual stresses were then evaluated by testing segments of each beam. An attempt was made to assess the effects of the residual stresses on fatigue strength.
Comparison of Various Commercial Hydrated Limes for Reducing Soil Plasticity, HR-82 and HR-106, 1964
Resumo:
Atterberg limits tests were performed on mixtures of gumbotil soil and the various chief chemical compounds found in hydrated limes. The results were then checked with commercial hydrated limes of varying chemical compositions. Results indicate that among the major constituents of hydrated limes Ca(OH)2 is most effective in reducing soil plasticity. MgO shows a moderate effect, but Mg(OH)2 and CaCO3 show practically no effect. There is, however, practically no difference between different types or between the same type of commercial hydrated limes for the reduction of soil plasticity. The choice of lime for soil-lime stabilization should, therefore, be dictated by the relative price and pozzolanic strength characteristics of the lime.
Resumo:
In today's era of advanced methods, it is interesting that a centuries-old Roman road-building concept can be the most attractive alternative available. The need for a less expensive road base construction method is very apparent, especially to the county engineer faced with maintaining quality lower traffic volume farm-to-market roads. The revival of the Macadam stone base is one possible solution. Des Moines County believed a Macadam road had excellent possibilities for their particular needs. They proposed a research project designed to eliminate some of the unknown factors of Macadam stone base construction. It is the intent of this research project to develop standardized design procedures and serve as an aid for others in constructing a Macadam base roadway. The Iowa Department of Transportation has published special provisions for the construction of Macadam stone bases that were adopted as the guideline specifications for the research project.
Resumo:
This construction report describes a project investigating macadam base construction of roads. The objectives of this project were to: 1. identify a cost effective asphalt emulsion bound macadam typical cross section; 2. obtain useful data comparing seven typical cross sections; 3. determine the effectiveness of engineering fabric placed under macadam roadbeds; and 4. evaluate the use of emulsions in surface seal coats.
Resumo:
Iowa's public road system of 112,000 miles is one of the largest and the best in the nation. It represents a considerable financial investment of taxpayer revenues over the years. And, it requires a sustained investment to preserve an economical level of transport service into the future. In 1982, a Governor's Blue Ribbon Transportation Task Force evaluated the effectiveness of Iowa's entire transportation system. Four important Task Force recommendations dealt with public road administrative issues in Iowa. These issues were related to: 1. design criteria and levels of maintenance 2. consistency in the use of standards among jurisdictions 3. consolidation of maintenance operations at one jurisdictional level and 4. jurisdictional authority for roads. The issues formed the background for Research Project HR-265.
Resumo:
This report describes a new approach to the problem of scheduling highway construction type projects. The technique can accurately model linear activities and identify the controlling activity path on a linear schedule. Current scheduling practices are unable to accomplish these two tasks with any accuracy for linear activities, leaving planners and manager suspicious of the information they provide. Basic linear scheduling is not a new technique, and many attempts have been made to apply it to various types of work in the past. However, the technique has never been widely used because of the lack of an analytical approach to activity relationships and development of an analytical approach to determining controlling activities. The Linear Scheduling Model (LSM) developed in this report, completes the linear scheduling technique by adding to linear scheduling all of the analytical capabilities, including computer applications, present in CPM scheduling today. The LSM has tremendous potential, and will likely have a significant impact on the way linear construction is scheduled in the future.
Resumo:
An asphalt concrete (ACC) overlay is most often the rehabilitative effort used to maintain the serviceability of either an ACC or PCC pavement. The major problem in durability of this ACC overlay comes from reflective cracking. These cracks usually open, allowing water to enter the unsealed crack and strip the ACC in the overlay. The stripping of the ACC allows accelerated deterioration at the crack. Two engineering fabrics were evaluated in this project in order to determine their effectiveness in reducing reflective cracking. These two materials are: PavePrep, Contech Construction Products, Inc., and Pro-Guard, Phillips Fiber Corporation. A 4.2 km (2.6 mi) roadway in Audubon County was selected for the research project. The roadway was divided into eight test sections. Four of the test sections are conventional resurfacing. The other four sections are split between the two engineering fabrics (two Pro-Guard and two PavePrep). A 75 mm (3 in.) thick overlay was placed over the entire project.