608 resultados para Hurricane Katrina, 2005.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Appeal Activity In The Public Assistance Programs

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Food Assistance Monthly Participation Report is a monthly summary of Food Assistance program participation, Statewide and for each Iowa county. Breakouts are reported for participants also in the FIP program, those only receiving Food Assistance, and those that are receiving economic assistance under other programs (primarily Medicaid). This report may also be known as the F-1 Report.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A-1 Monthly Public Assistance Statistical Report Family Investment Program, June 2005

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Bulletin on Iowa Open Meetings and Public Records Laws By Attorney General Tom Miller

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Weekly Newsletter

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Weekly Newsletter

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Monthly newsletter for the Iowa Department of Public Health

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Weekly Newsletter

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A-7 Statistical Report On FIP Applications And Cases Discontinued, June 2005

Relevância:

20.00% 20.00%

Publicador:

Resumo:

State Audit Reports

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Weekly Newsletter

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fiber reinforced polymer (FRP) composite materials are making an entry into the construction market in both buildings and pavements. The application to pavements so far has come in the form of joint reinforcement (dowels and tie bars). FRP resistance to salt corrosion in dowels has made it an alternative to standard epoxy-coated steel dowels for pavements. Iowa State University has completed a large amount of laboratory research to determine the diameter, spacing, and durability of FRP dowels. This report documents the performance of elliptical FRP dowels installed in a field situation. Ten joints were monitored in three consecutive test sections, for each of three dowel spacings (10, 12, and 15 inches) including one instrumented dowel in each test section. The modulus of dowel bar support was determined using falling weight deflectometer (FWD) testing and a loaded crawl truck. FWD testing was also used to determine load transfer efficiency across the joint. The long-term performance and durability of the concrete was also evaluated by monitoring faulting and joint opening measurements and performing visual distress surveys at each joint. This report also contains similar information for standard round, medium elliptical, and heavy elliptical steel dowels in a portion of the same highway. In addition, this report provides a summary of theoretical analysis used to evaluate joint differential deflection for the dowels.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Stragtegic plan for Iowa State University

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.