275 resultados para Foraging tunnels


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) mandated utilizing the Load and Resistance Factor Design (LRFD) approach for all new bridges initiated in the United States after October 1, 2007. To achieve part of this goal, a database for Drilled Shaft Foundation Testing (DSHAFT) was developed and reported on by Garder, Ng, Sritharan, and Roling in 2012. DSHAFT is aimed at assimilating high-quality drilled shaft test data from Iowa and the surrounding regions. DSHAFT is currently housed on a project website (http://srg.cce.iastate.edu/dshaft) and contains data for 41 drilled shaft tests. The objective of this research was to utilize the DSHAFT database and develop a regional LRFD procedure for drilled shafts in Iowa with preliminary resistance factors using a probability-based reliability theory. This was done by examining current design and construction practices used by the Iowa Department of Transportation (DOT) as well as recommendations given in the American Association of State Highway and Transportation Officials (AASHTO) LRFD Bridge Design Specifications and the FHWA drilled shaft guidelines. Various analytical methods were used to estimate side resistance and end bearing of drilled shafts in clay, sand, intermediate geomaterial (IGM), and rock. Since most of the load test results obtained from O-cell do not pass the 1-in. top displacement criterion used by the Iowa DOT and the 5% of shaft diameter for top displacement criterion recommended by AASHTO, three improved procedures are proposed to generate and extend equivalent top load-displacement curves that enable the quantification of measured resistances corresponding to the displacement criteria. Using the estimated and measured resistances, regional resistance factors were calibrated following the AASHTO LRFD framework and adjusted to resolve any anomalies observed among the factors. To illustrate the potential and successful use of drilled shafts in Iowa, the design procedures of drilled shaft foundations were demonstrated and the advantages of drilled shafts over driven piles were addressed in two case studies.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

During the first year of research, work was completed to identify Iowa DOT needs for web-based project management system (WPMS) and evaluate how commercially available solutions could meet these needs. Researchers also worked to pilot test custom developed WPMS solutions on Iowa DOT bridge projects. At the end of the first year of research, a Request for Proposals (RFP) was developed and issued by the Iowa DOT for the selection of a commercial WPMS to pilot test on multiple bridge projects. During the second year of research, the responses to the RFP issued during the first year of research were evaluated and a solution was selected. The selected solution, Attolist, was customized, tested, and implemented during the fall of 2009. Beginning in the winter of 2010, the solution was implemented on Iowa DOT projects. Researchers worked to assist in the training, implementation, and performance evaluation of the solution. Work will continue beyond the second year of research to implement Attolist on an additional pilot project. During this time, work will be completed to evaluate the impact of WPMS on Iowa DOT bridge projects.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 U.S.C. and 49 U.S.C. The STIP is generated to provide the Federal Highway Administration and Federal Transit Administration a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). The 2015-2018 STIP was approved by FHWA and FTA on September 16, 2014. Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal-aid expenditures and approvals of metropolitan planning organizations’ (MPOs), transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 U.S.C. and 49 U.S.C. The STIP is generated to provide the Federal Highway Administration and Federal Transit Administration a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). The 2015-2018 STIP was approved by FHWA and FTA on September 16, 2014. Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal-aid expenditures and approvals of metropolitan planning organizations’ (MPOs), transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 U.S.C. and 49 U.S.C. The STIP is generated to provide the Federal Highway Administration and Federal Transit Administration a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal-aid expenditures and approvals of metropolitan planning organizations’ (MPOs), transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The deterioration of bridge decks due to steel corrosion is a problem encountered several years ago. This project, using galvanized reinforcement, began over twenty years ago. Since that time, epoxy coated reinforcement has become the specified material used in bridge decks. The decks researched in this project are located on 1-35 in Story County. They were constructed in 1967. The results from the testing done on this project show that galvanizing protects steel from corrosion due to deicing salts, resulting in less/no concrete deterioration.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this Interstate Corridor Plan (plan) is to provide the Iowa Department of Transportation (Iowa DOT) with an initial screening and prioritization of interstate corridors/segments. This process evaluates the entire interstate system, independent of current financial constraints, using a select group of criteria weighted in terms of their relative significance. The resulting segments would then represent those areas that should be considered for further study (e.g., environmental, design, engineering), with the possibility of being considered for programming by the Iowa Transportation Commission. There was a dominant theme present in conversations with those department stakeholders who have a keen interest in the product of this planning effort. A statement that was often heard was that staff needed more information to help answer the question, “Where do we need to be looking to next, and when?” There was a strong desire to be able to use this plan to help populate that initial pool of candidate segments that would progress towards further study, as discussed below. It was this theme that framed the need for this plan and ultimately guided its development. Further study: As acknowledged at the beginning of this section, the product of this planning effort will be an initial screening and prioritization of interstate corridors/segments. While this initial screening will assist the Iowa DOT in identifying those areas that should be considered for further study, the plan will not identify specific projects or alternatives that could be directly considered as part of the programming process. Bridging the gap between this plan and the programming process are a variety of environmental, design, and engineering activities conducted by various Iowa DOT offices. It is these activities that will further refine the priority corridors/segments identified in this plan into candidate projects. In addition, should the evaluation process developed through this planning effort prove to be successful, it is possible that there will be additional applications, such as future primary system highway plans and statewide freight plans.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The highway system in the State of Iowa includes many grade separation structures constructed to provide maximum safety and mobility to road users on intersecting roadways. However, these structures can present possible safety concerns for traffic passing underneath due to close proximity of piers and abutments. Shielding of these potential hazards has been a design consideration for many years. This study examines historical crash experience in the State of Iowa to address the advisability of shielding bridge piers and abutments as well as other structure support elements considering the offset from the traveled way. A survey of nine Midwestern states showed that six states had bridge pier shielding practices consistent with those in Iowa. Data used for the analyses include crash data (2001 to 2007) from the Iowa Department of Transportation (Iowa DOT), the Iowa DOT’s Geographic Information Management System (GIMS) structure and roadway data (2006) obtained from the Office of Transportation Data, and shielding and offset data for the bridges of interest. Additionally, original crash reports and the Iowa DOT video log were also utilized as needed. Grade-separated structures over high-speed, multilane divided Interstate and primary highways were selected for analysis, including 566 bridges over roadways with a speed limit of at least 45 mph. Bridges that met the criteria for inclusion in the study were identified for further analysis using crash data. The study also included economic analysis for possible shielding improvement.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

“This book traces the development of transportation in Iowa from territorial days to the 19 80s. It shows the evolution of the transportation systems; how they originated, progressed and functioned; their structural organizations; effectiveness in overcoming obstacles, under the guidance of state and federal legislation; and their impact upon the development of the state.” – From the Prologue, page xiii

Relevância:

10.00% 10.00%

Publicador:

Resumo:

For almost 75 years, the Grand Avenue Viaduct (known today as the Gordon Drive Viaduct) has been a familiar feature of Sioux City's urban landscape. With the exception of bridges over the Mississippi River, the Grand Avenue Viaduct is Iowa's longest grade separation as well as its longest bridge. For nearly a mile, from the eastern suburbs west to the central business district, the viaduct carries Gordon Drive and the city route of U.S. 20 over the Floyd River valley, which includes the remnants of the city's famed stockyards and the South Bottoms neighborhood, as well as a maze of railroad tracks and the present channel of the Floyd River. Constructed in 1937 and known simply as "The Viaduct" to local residents, the massive structure is as fundamental to Sioux City as were its stockyards just a few decades ago.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Marsh Rainbow Arch Bridge is a patented bridge design by James Barney Marsh, a graduate of Iowa State College of Agriculture and Mechanic Arts (now Iowa State University). Around the turn of the 20th Century, reinforced concrete was introduced in Iowa as an important new bridge construction material. Marsh used the new technology to encased steel truss arches in concrete to produce a sturdy yet esthetic arch bridge. This booklet touches on the important aspects of Marsh's life, business and industrial contributions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Plagued for nearly a century by the perennial flooding of Indian Creek, the City begins construction on a massive channelization project designed to confine the creek to its banks. Funded largely through a grant from the recently established Public Works Administration (PWA), the Indian Creek Channel, upon its completion two years later, would become the largest PWA undertaking in the State of Iowa. Though it did not completely end flooding in Council Bluffs, construction of the Indian Creek Channel did substantially reduce both the number and severity of the city's subsequent floods. It also profoundly impacted the residential and commercial development of Council Bluffs, as well as the city's sanitary conditions. The effects of the Indian Creek channelization, both practical and historical, are still realized today. In 2009, plans for a City road and bridge construction project at the intersection of North Broadway Street and Kanesville Boulevard proposed to replace a 221-foot-long segment of the Indian Creek Channel with a concrete box culvert. In compliance with the National Historic Preservation Act, a cultural resources study was conducted at the proposed construction site, the findings of which concluded that the historic character of the Indian Creek Channel would be compromised by the impending construction. As a means of mitigating these damages, an agreement was reached among the City, the Iowa State Historic Preservation Office, and the Federal Highway Administration that resulted in detailed research and documentation of the historical significance of the Indian Creek Channel. The findings of that study are summarized in this publication.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The booklet tells the history of the construction of the Iowa Highway 376 Bridge within the context of significant modernization and expansion of the highway system in Iowa in the 1950s. Curvy, narrow highways were widened and straightened and narrow iron truss bridges were replaced with more modern concrete and steel structures, changing the landscape of rural Iowa. Bridge engineer Herbert A Arthur, who designed the Iowa Highway 376 Bridge, was a prolific bridge engineer in the 1950s. This booklet serves to inform the public of this significant aspect of Iowa transportation history.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Hibernia is mostly a memory today as is so many immigrant neighborhoods. However, there are several guideposts to the past that still witness to the history of years gone by, such as St. Patrick's Church, a beacon reflecting the Irish Catholic heritage. Murray Iron Works and the Embalming Burial Case Company and the worker's homes on the surrounding streets witness to the industrial/employee relationship of the past.