247 resultados para Causa final


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Rathbun Land and Water Alliance and partners have undertaken a highly effective approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This application proposes to assist landowners to construct five large sediment retention basins that will reduce sediment and phosphorus delivery from priority land in targeted sub-watersheds. The Alliance, with previous WIRB support, demonstrated that construction of these basins at strategically selected sites is one of the most cost effective measures to reduce sediment and phosphorus delivery to Rathbun Lake. Features of this project are: (1) use of geographic information system (GIS) analysis to identify potential basin sites; (2) assistance for landowners to construct 5 basins that will reduce the annual delivery of sediment by 1,500 tons and phosphorus by 5,000 pounds; (3) evaluation of the benefits from basin construction using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs including sediment retention basins to protect water quality.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Central Park Lake Watershed Assessment and Management Plan identified four categories where improvements are needed to remove the 23 acre lake from the impaired waters list. These include the wastewater system, runoff from surrounding lands, in-lake nutrient re-suspension and runoff from hard surfaces within the park. The lake is currently impaired for bacteria, algae and pH. Through outcomes of the Watershed Assessment and Management Plan, this proposal includes for abandonment and reclamation of the single cell wastewater lagoon site, replacement with three conventional septic systems and construction of two wetlands. One of the wetlands is located on the same site as the reclaimed lagoon and the other is located to intercept sediment and trap nutrients transported by tile lines. The prescribed wastewater system improvements are based on assessment by grab samples test by the State Hygienic Lab, development of a Preliminary Engineering Report, soil analysis and communication with IDNR wastewater officials. The two wetland sites were assessed by officials from IDALS and the Jones County SWCD. This project is part of $1.7 million lake restoration effort to reclaim the 47 year old lake. The lake has a positive economic impact of more than $7.6 million annually and supports an average annual visitation of 58,145, according to the Iowa Lakes Valuation Project, conducted by Iowa State University.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Part of a phased approach, an intensive information and education program, construction of erosion control practices, and sediment control on construction sites is proposed. These proposed practices will manage sediment runoff and nutrient runoff on agricultural and urban areas. Sediment control “structures” such as waterways, wetlands, modified terraces, grade stabilization structures, sediment basins, and rain gardens is proposed and will be combined with nutrient and pesticide management and reduced tillage to reduce non-point source pollution. A reduction of 15% of the sediment and phosphorus delivered to a water body from priority areas will be looked at as a success in this short-term project focused primarily at education within the project area which is also, for the most part, the top 25% sediment load producing sub-watersheds. In addition, four urban areas have been identified as part of this project as needing immediate assistance. A combination of urban and agricultural conservation practices, shoreline revegetation, and education of landowners will be used to achieve these results on both the urban and the agricultural arena.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main channel of Upper Buffalo Creek has been identified on Iowa's 303(d) List of Impaired Waters as having a biological impairment (i.e., greater than 50% decrease in mussel species) due to habitat modification, stream alteration, nutrients, and/or siltation. The Buchanan County SWCD has identified this as a priority watershed because mussel population decreases have been well documented to be directly associated with decreases in ecological value, recreational value, and overall water quality. The presence of a diverse and reproducing mussel population indicates that a healthy aquatic ecosystem is intact, which means good fishing, good water quality for wildlife, and assurance that water is safe for recreation. Dan Cohen, Buchanan Conservation Board Director, stated that "should water quality conditions improve, and fishing holes and habitat be enhanced, there is no doubt that many people would take advantage of the renewed recreational opportunities". This watershed contains two "threatened" species of mussels and five "sensitive" species of fish. The District feels that a watershed project will assist in implementing conservation practices that will greatly improve water quality and enhance biological and recreational venues.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Rathbun Land and Water Alliance and partners have undertaken a highly effective approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This application proposes to assist landowners to apply BMPs that will reduce sediment and phosphorus delivery from priority land in targeted sub-watersheds as part of the Rathbun Lake Special Project. Features of this project are: (1) use of geographic information system (GIS) analysis to identify priority land that requires BMPs; (2) assistance for landowners to apply BMPs for 4,000 acres that will reduce the annual delivery of sediment by 6,000 tons and phosphorus by 20,000 pounds; (3) evaluation of the benefits from BMP application using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs for priority land to protect water quality.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Yellow River Headwaters Watershed (YRHW) drains 26,730 acres of rural land within Winneshiek and Allamakee Counties. While portions of the river have been designated as a High Quality Resource by the State of Iowa, other portions appear on the State's 303(d) List of Impaired Waters due to excessive nutrients, sediment and other water quality issues. The Winneshiek SWCD was fortunate enough to secure WSPF/WPF funds for FY2009 to begin addressing many of the sources of the identified problems, especially along the all-to-critical stream corridor. Initial landowner I producer interest has exceeded expectations and several key BMPs have been installed within the identified critical areas. Yet due to the current budget constraints in the WSPF/WPF programs, we currently have greater landowner I producer interest than we do funds, which is why the District is applying for WIRB funding, to provide supplemental incentives to continue the installation of needed Grade Stabilization Structures, Terraces and Manure Management Systems in identified critical areas. Other funding, currently available to the District, will cover the remaining portions of the project's budget, including staff and our outreach efforts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project would construct a sediment basin on the main inlet stream to Swan Lake, an impaired waterbody currently on the 303(d) list. This project is one of the highest priorities in our Watershed Management Plan. According to STEPL modeling, it would sequester over 1/3 of the total phosphorus (the pollutant of main concern) coming into the lake.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Miller Creek, a 19,926 acre watershed, is listed on the 2008 Section 303d Impaired Waters List. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to nutrient and sediment delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. The WIRB board provided implementation grant funds in 2010 for a three year project to treat targeted areas of 5 tons per acre or greater soil loss with an estimated reduction of 2,547 tons. As of December 1, 2012, with 95% of the funds allocated, the final results are estimated to provide a sediment delivery reduction of 4,500 tons and an estimated phosphorus reduction of 5,700 lbs per year. These accomplishments and the completion of the three year Miller Creek WIRB project represent "Phase I" of the SWCD's goals to treat the Miller Creek watershed. This application represents "Phase II" or the final phase of the Miller Creek water quality project. The Monroe SWCD plans to reduce sediment delivery by 70% on an additional 245 acres of priority land. This goal will be accomplished through installation of strategically placed structural practices, BMPs, and grazing systems. These practices will reduce soil loss, nutrient runoff, and sediment delivery as well as improve water quality and wildlife habitat in the watershed. Utilization of partnerships with NRCS and IDALS-DSC will continue to be an important part to the success of the project. Project goals will be achieved by utilizing matching funds from EQIP, and the Monroe SWCD has approved the use of District IFIP cost share funds specifically for use in the Miller Creek Watershed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Little Clear Lake is a 162 acre natural lake located in the western part of Pocahontas County. The lake has a 375 acre watershed that is gently rolling with nearly 84% of the watershed in row crop production. The lake is listed on the Iowa DNR’s impaired waters list due to nutrients, siltation and exotic species (purple loosestrife). These impairments have been verified with in-lake monitoring and landowner conversations as well as watershed modeling. The watershed models estimates that the average sheet and rill erosion is 1.74 tons/acre/year and sediment delivery is .12 tons/acre/year with a total of 44 tons/year being delivered to Little Clear Lake. The goal of the Little Clear Lake Watershed Protection Plan is to (1) reduce sediment delivery to Little Clear Lake by 60%, or 26.5 tons annually, by installing best management practices within the watershed. Doing this will control nearly 100% of the of the lake’s drainage area; and (2) initiate an information and education campaign for residents within the Little Clear Lake watershed which will ultimately prepare the residents and landowners for future project implementation. In an effort to control sediment and nutrient loading the Little Clear Lake Watershed Protection Plan has included 3 sediment catch basin sites and 5 grade stabilization structures, which function to stabilize concentrated flow areas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report documents Phase III of a four-phase project. The goals of the project are to study the feasibility of using advanced technology from other industries to improve he efficiency and safety of winter highway maintenance vehicle operations, and to provide travelers with the level of service defined by policy during the winter season at the least cost to the taxpayers. The results of the first phase of the research were documented in the Concept Highway Maintenance Vehicle Final Report: Phase One dated April 1997, which describes the desirable functions of a concept maintenance vehicle and evaluates its feasibility. Phase I concluded by establishing the technologies that would be assembled and tested on the prototype vehicles in Phase II. The primary goals of phase II were to install the selected technologies on the prototype winter maintenance vehicles and to conduct proof of concept in advance of field evaluations planned for Phase III. This Phase III final report documents the work completed since the end of Phase II. During this time period, the Phase III work plan was completed and the redesigned friction meter was field tested. A vendor meeting was held to discuss future private sector participation and the new design for the Iowa vehicle. In addition, weather and roadway condition data were collected from the roadway weather information systems at selected sites in Iowa and Minnesota, for comparison to the vehicles' onboard temperature sensors. Furthermore, the team received new technology, such as the mobile Frensor unit, for bench testing and later installation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Hurley Creek Watershed is a micro-watershed of approximately 2,211 acres (3.5 square miles), which drains into the Platte River southwest of Creston. The watershed is 64% urban and 36% rural. The urban area includes the bulk of the town of Creston (population 7,597) and the rural area is just north of Creston, which includes the origin of Hurley Creek. Hurley Creek Watershed was examined for improvements following a citizens group in 2004 determined a need and desire to make McKinley Lake, a 65-acre city-owned lake, a quality fishery and viable swimming lake, as it once was. As part of a major park improvement project over ten-plus years, the watershed improvement project is undertaken to reduce pollution entering the lake. In 2006, IOWATER volunteers, under guidance of the town’s consultants, sampled the stream in 8 locations throughout the year, a total of 92 samples. The samples, along with visual inspections of the creek, found three major impairments: 1) high E. Coli levels, 2) severe erosion, and 3) storm water management. Using the Watershed Project Planning Protocol, the consultant and a volunteer committee of interested citizens determined that five physical and three administrative actions should be undertaken. The request will help: identify sources of E. Coli and reduce its delivery into the watershed, control animal access, manage storm water, implement stream-bank stabilization, educate the public, and develop miscellaneous small projects on specific properties.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Storm Lake, the state's fourth largest natural lake, has been the centerpiece of significant economic development, including a resort, water park, and state marina. While there have been considerable improvements to the lake's water quality through a major on-going lake restoration program and watershed project, the Little Storm Lake area still needs to be addressed. Little Storm Lake is a 190 acre area on the nmihwest side of Storm Lake. The water level in both areas is based on the dam height located on the southeast corner of Storm Lake. Approximately 70% of the water from the watershed flows through Little Storm Lake. Little Storm Lake originally had the ability to remove much of the sediment and nutrients from incoming waters. However, due to degradation, proper wetland function has been compromised. Under normal hydrologic conditions Little Storm Lake has the potential to function as a sediment trap for Storm Lake, but tllis capacity is overwhelmed during high flows. Little Storm Lake is at or near its sediment trapping capacity, which results in higher sediment transport into Storm Lake. Resuspension of sediments due to wind and other in-lake dynamics, such as rough fish, further exacerbate the total turbidity from suspended sediment and results in movement of sediment from Little Storm Lake into Storm Lake. This project includes a fish barrier and water retention structure between Little Storm Lake and Storm Lake and the construction of a pumping station and associated equipment. The project involves periodic dewatering of Little Storm Lake during years of favorable climatological conditions to consolidate the sediments and revegetate the area. Construction of the fish banier would aid restoration efforts by preventing rough fish from destroying the vegetation and would decrease recruitment of rough fish by limiting their spawning area. In the future, if the diminished trapping capacity of Little Storm Lake still results in sediment moving into Storm Lake, a dredging project would be initiated to deepen Little Storm Lake.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Big Bear Creek is the upper portion of Bear Creek which drains 26,734 acres and ends at the Highway 136 crossing of Bear Creek. Bear Creek flows into the section of the Maquoketa River, which is on the EPA’s 303(d) List of Impaired Waters. Monitoring by the Iowa DNR indicates that Bear Creek is contributing significant amounts of sediment and nutrients to the Maquoketa River. The primary use of land in the Big Bear Creek Watershed is row crop production. A roadside survey completed by Anamosa Field Office Staff indicated that 123,747 tons/yr. of sediment was being lost due to sheet and rill erosion only. The sediment delivered to Big Bear Creek is 24,447 tons/yr. Based on this data, 34,226 lbs. of Phosphorus is reaching the stream per year. With the added amount of sediment and phosphorus delivery through gully and streambank erosion, one can clearly see that the water quality in Bear Creek is severely impaired. The Big Bear Watershed Project will work to reduce the sediment and phosphorus delivered to the stream by 30% through the installation of practices that trap sediment and reduce erosion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The focus of this project is "Indian Creek", a tributary to Cedar Creek which eventually empties into the Lower Skunk River. Indian Creek suffers from deteriorated water quality resulting from high volumes of urban stormwater runoff resulting in streambank erosion, combined sewer overflows and chemical and floatable litter pollution from roadways. The "Creative Solution for Indian Creek Water Quality" project will work with a local commercial business to create a model urban project The project will reduce the volume of urban stormwater by 930,000 gallons annually entering Indian Creek as well as reduce the volume of discharge water by 500,000 gallons annually. The local business will develop a system to divert stormwater from l acre of their roof as well as coolant discharge water from their factory into an existing retention pond. In addition, the project will reduce demand on the municipal water supply by 500,000 gallons annually by harvesting water from the retention pond for cooling operations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The city of Elliott has had an increase in nitrate levels in their community water supply located in the Coe Creek Watershed. They have been working with the IDNR Source Water Protection (SWP) Programs to conduct site investigations and have formed a SWP Planning Team. This Team has been reviewing the investigation findings, formed an action plan and studied different Best Management Practices (BMPs). After considering the BMPs the SWP Team made a recommendation to the Elliott City Council which included native grass seeding and a shallow water wetland. The Team also held an informational meeting for the citizens of Elliott. The goal of this meeting was to inform and educate the public of the Team findings and BMPs. The Elliott City Council approved the restoration of a shallow wetland with a native grass buffer. This whole project is 27 acres and includes a shallow water wetland with native grass buffer. This would be a long term method to reduce nitrates in the city wells. Elliott is partnering with the Natural Resources Conservation Service, Montgomery County Soil and Water Conservation District, Pheasants Forever, the Montgomery County Conservation Board, US Fish and Wildlife Service and the Montgomery County Board of Supervisors in the restoration of the shallow water wetland and native grass buffer.