156 resultados para solar system : general


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Audit report on the Peace Officers' Retirement, Accident and Disability System for the year ended June 30, 2013

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Audit report of the Iowa Public Employees’ Retirement System (IPERS) as of June 30, 2013 and 2012

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Report of recommendations of the Iowa Public Employees’ Retirement System for the years ended June 30, 2013 and June 30, 2012

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report describes the work accomplished to date on research project HR-173, A Computer Based Information System for County Equipment Cost Records, and presents the initial design for this system. The specific topics discussed here are findings from the analysis of information needs, the system specifications developed from these findings, and the proposed system design based upon the system specifications. The initial system design will include tentative input designs for capturing input data, output designs to show the output formats and the items to be output for use in decision making, file design showing the organization of information to be kept on each piece of equipment in the computer data file, and general system design explaining how the entire system will operate. The Steering Committee appointed by Iowa Highway Research Board is asked to study this report, make appropriate suggestions, and give approval to the proposed design subject to any suggestions made. This approval will permit the designer to proceed promptly with the development of the computer program implementation phase of the design.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Audit report on the Black Hawk County Criminal Justice Information System for the year ended June 30, 2014

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Audit report on the Iowa Judicial Retirement System for the year ended June 30, 2014

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Audit report on the Peace Officers' Retirement, Accident and Disability System for the year ended June 30, 2014

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Audit report of the Iowa Public Employees’ Retirement System (IPERS) as of June 30, 2014

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Report on the Iowa Public Employees’ Retirement System and schedules of employer allocations and collective pension amounts allocated by employer for the year ended June 30, 2014

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Report on the Iowa Public Employees’ Retirement System and schedules of employer allocations and collective pension amounts allocated by employer for the year ended June 30, 2013

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The goal of this work was to move structural health monitoring (SHM) one step closer to being ready for mainstream use by the Iowa Department of Transportation (DOT) Office of Bridges and Structures. To meet this goal, the objective of this project was to implement a pilot multi-sensor continuous monitoring system on the Iowa Falls Arch Bridge such that autonomous data analysis, storage, and retrieval can be demonstrated. The challenge with this work was to develop the open channels for communication, coordination, and cooperation of various Iowa DOT offices that could make use of the data. In a way, the end product was to be something akin to a control system that would allow for real-time evaluation of the operational condition of a monitored bridge. Development and finalization of general hardware and software components for a bridge SHM system were investigated and completed. This development and finalization was framed around the demonstration installation on the Iowa Falls Arch Bridge. The hardware system focused on using off-the-shelf sensors that could be read in either “fast” or “slow” modes depending on the desired monitoring metric. As hoped, the installed system operated with very few problems. In terms of communications—in part due to the anticipated installation on the I-74 bridge over the Mississippi River—a hardline digital subscriber line (DSL) internet connection and grid power were used. During operation, this system would transmit data to a central server location where the data would be processed and then archived for future retrieval and use. The pilot monitoring system was developed for general performance evaluation purposes (construction, structural, environmental, etc.) such that it could be easily adapted to the Iowa DOT’s bridges and other monitoring needs. The system was developed allowing easy access to near real-time data in a format usable to Iowa DOT engineers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Audit report on the Black Hawk County Criminal Justice Information System for the year ended June 30, 2015

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Audit report of the Iowa Public Employees’ Retirement System (IPERS) as of June 30, 2015

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Audit report on the Iowa Judicial Retirement System for the year ended June 30, 2015

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Report on the Iowa Judicial Retirement System as of June 30, 2015 and the net pension liability as of June 30, 2014