599 resultados para Highway transportation
Resumo:
Although extensive research has been conducted on urban freeway capacity estimation methods, minimal research has been carried out for rural highway sections, especially sections within work zones. This study attempted to fill that void for rural highways in Kansas, by estimating capacity of rural highway work zones in Kansas. Six work zone locations were selected for data collection and further analysis. An average of six days’ worth of field data was collected, from mid-October 2013 to late November 2013, at each of these work zone sites. Two capacity estimation methods were utilized, including the Maximum Observed 15-minute Flow Rate Method and the Platooning Method divided into 15-minute intervals. The Maximum Observed 15-minute Flow Rate Method provided an average capacity of 1469 passenger cars per hour per lane (pcphpl) with a standard deviation of 141 pcphpl, while the Platooning Method provided a maximum average capacity of 1195 pcphpl and a standard deviation of 28 pcphpl. Based on observed data and analysis carried out in this study, the suggested maximum capacity can be considered as 1500 pcphpl when designing work zones for rural highways in Kansas. This proposed standard value of rural highway work zone capacity could be utilized by engineers and planners so that they can effectively mitigate congestion at or near work zones that would have otherwise occurred due to construction/maintenance.
Resumo:
The Iowa State Highway Commission initiated this research to evaluate a new lowering device for tower luminaires and a new concept of tower luminaire light distribution. Lighting at the West interchange of I-80, I-35, and I-235 in Polk County was also designated as an FHWA experimental project. As highway lighting has become more widely used, highway officials recognized the increasing importance of reducing safety hazards and improving aesthetic appearance of lighting installations. Also, lighting construction, energy, and maintenance costs were absorbing a larger share of the maintenance budget. A search began for a method of lighting whereby the fixed objects by the roadside could be eliminated or reduced in number, the costs could be reduced and the quality of lighting improved over existing methods. Lack of design data in this area illustrated the need for research.
Resumo:
In 1982, Iowa's crossing warning identification system and signage at rail crossings were outdated, inconsistent and inadequate. Iowa's railroad system had been reduced and reorganized during the 1970's and many of the surviving railroad companies were unable to install new signs or devote staff to updating information. The preliminary engineering part of this project improved the information inventory about each crossing, provided for installation of identification tags and resulted in a comprehensive list of posts and signs eligible for replacement. The sign installation portion of this project resulted in erection of nearly 10,000 new crossbuck signs and 10,000 advance warning signs with high intensity reflectorization. In addition, new posts and multiple track signs were replaced where appropriate. Increased visibility of crossings for the motoring public has resulted from proper sign placement and use of high intensity reflectorization. The tagging has provided a consistent correct identification of crossings for accident reporting. The computer inventory of information about the crossings is now correct and provides for informed decision making to administrators of Federal and State crossing safety funds.
Resumo:
Minimizing infiltration of water in pavement structures has long been a priority of pavement designers. Incorporation of subsurface edgedrains is frequently an integral part of an pavement drainage system. In order for such a system to be effective however, it must be properly installed and maintained. With advances in video technology, inspection of edgedrain systems can now be conducted quite efficiently. This report documents the results of 287 video inspections of highway edgedrain systems in 29 states. These inspections were conducted to both demonstrate the capabilities of the technology as well as demonstrating some of the common problems associated with the performance of edgedrain systems. Findings indicated not only that the equipment was quite effective in identifying edgedrain performance concerns, but also how widespread the concerns of edgedrain performance are. Almost one third of the systems inspected had nonfunctional outlets, another third were either found to have non-functional mainlines or the mainlines could not be inspected due to physical obstructions. Only one third of the systems inspected were found to be performing as intended. Recommendations are provided for edgedrain design improvements to facilitate performance of the system and their inspections as well as recommendations to improve quality control during construction. Suggestions are also provided for maintenance procedures to address concerns identified in the inspection process. A Draft Guide Specification For Video Edgedrain Inspection and Acceptance is also provided as an Appendix.
Resumo:
It is generally accepted that high density polyethylene pipe (HDPE) performs well under live loads with shallow cover, provided the backfill is well compacted. Although industry standards require carefully compacted backfill, poor inspection and/or faulty construction may result in soils that provide inadequate restraint at the springlines of the pipes thereby causing failure. The objectives of this study were: 1) to experimentally define a lower limit of compaction under which the pipes perform satisfactorily, 2) to quantify the increase in soil support as compaction effort increases, 3) to evaluate pipe response for loads applied near the ends of the buried pipes, 4) to determine minimum depths of cover for a variety of pipes and soil conditions by analytically expanding the experimental results through the use of the finite element program CANDE. The test procedures used here are conservative especially for low-density fills loaded to high contact stresses. The failures observed in these tests were the combined effect of soil bearing capacity at the soil surface and localized wall bending of the pipes. Under a pavement system, the pipes' performance would be expected to be considerably better. With those caveats, the following conclusions are drawn from this study. Glacial till compacted to 50% and 80% provides insufficient support; pipe failureoccurs at surface contact stresses lower than those induced by highway trucks. On the other hand, sand backfill compacted to more than 110 pcf (17.3 kN/m3) is satisfactory. The failure mode for all pipes with all backfills is localized wall bending. At moderate tire pressures, i.e. contact stresses, deflections are reduced significantly when backfill density is increased from about 50 pcf (7.9 kN/m^3) to 90 pcf (14.1 kN/m^3). Above that unit weight, little improvement in the soil-pipe system is observed. Although pipe stiffness may vary as much as 16%, analyses show that backfill density is more important than pipe stiffness in controlling both deflections at low pipe stresses and at the ultimate capacity of the soil-pipe system. The rate of increase in ultimate strength of the system increases nearly linearly with increasing backfill density. When loads equivalent to moderate tire pressures are applied near the ends of the pipes, pipe deflections are slighly higher than when loaded at the center. Except for low density glacial till, the deflections near the ends are not excessive and the pipes perform satisfactorily. For contact stresses near the upper limit of truck tire pressures and when loaded near the end, pipes fail with localized wall bending. For flowable fill backfill, the ultimate capacity of the pipes is nearly doubled and at the upper limit of highway truck tire pressures, deflections are negligible. All pipe specimens tested at ambient laboratory room temperatures satisfied AASHTO minimum pipe stiffness requirements at 5% deflection. However, nearly all specimens tested at elevated pipe surface temperatures, approximately 122°F (50°C), failed to meet these requirements. Some HDPE pipe installations may not meet AASHTO minimum pipe stiffness requirements when installed in the summer months (i.e. if pipe surface temperatures are allowed to attain temperatures similar to those tested here). Heating of any portion of the pipe circumference reduced the load carrying capacity of specimens. The minimum soil cover depths, determined from the CANOE analysis, are controlled by the 5% deflection criterion. The minimum soil cover height is 12 in. (305 mm). Pipes with the poor silt and clay backfills with less than 85% compaction require a minimum soil cover height of 24 in. (610 mm). For the sand at 80% compaction, the A36 HDPE pipe with the lowest moment of inertia requires a minimum of 24 in. (610 mm) soil cover. The C48 HDPE pipe with the largest moment of inertia and all other pipes require a 12 in. (305 mm) minimum soil cover.
Resumo:
In the past, culvert pipes were made only of corrugated metal or reinforced concrete. In recent years, several manufacturers have made pipe of lightweight plastic - for example, high density polyethylene (HDPE) - which is considered to be viscoelastic in its structural behavior. It appears that there are several highway applications in which HDPE pipe would be an economically favorable alternative. However, the newness of plastic pipe requires the evaluation of its performance, integrity, and durability; A review of the Iowa Department of Transportation Standard Specifications for Highway and Bridge Construction reveals limited information on the use of plastic pipe for state projects. The objective of this study was to review and evaluate the use of HDPE pipe in roadway applications. Structural performance, soil-structure interaction, and the sensitivity of the pipe to installation was investigated. Comprehensive computerized literature searches were undertaken to define the state-of-the-art in the design and use of HDPE pipe in highway applications. A questionnaire was developed and sent to all Iowa county engineers to learn of their use of HDPE pipe. Responses indicated that the majority of county engineers were aware of the product but were not confident in its ability to perform as well as conventional materials. Counties currently using HDPE pipe in general only use it in driveway crossings. Originally, we intended to survey states as to their usage of HDPE pipe. However, a few weeks after initiation of the project, it was learned that the Tennessee DOT was in the process of making a similar survey of state DOT's. Results of the Tennessee survey of states have been obtained and included in this report. In an effort to develop more confidence in the pipe's performance parameters, this research included laboratory tests to determine the ring and flexural stiffness of HDPE pipe provided by various manufacturers. Parallel plate tests verified all specimens were in compliance with ASTM specifications. Flexural testing revealed that pipe profile had a significant effect on the longitudinal stiffness and that strength could not be accurately predicted on the basis of diameter alone. Realizing that the soil around a buried HDPE pipe contributes to the pipe stiffness, the research team completed a limited series of tests on buried 3 ft-diameter HDPE pipe. The tests simulated the effects of truck wheel loads above the pipe and were conducted with two feet of cover. These tests indicated that the type and quality of backfill significantly influences the performance of HDPE pipe. The tests revealed that the soil envelope does significantly affect the performance of HDPE pipe in situ, and after a certain point, no additional strength is realized by increasing the quality of the backfill.
Resumo:
HR-394 was a software and database development project. Via funding provided by the Iowa Highway Research Board, the Iowa County Engineer's Association Service Bureau oversaw the planning and implementation of an Internet based application that supports two major local-government transportation project activities: Project programming and Development tracking. The goals were to reduce errors and inconsistencies, speed up the processes, link people to both project data and each other, and build a framework that could eventually support a 'paperless' work flow. The work started in 1999 and initial development was completed by the fall of 2002. Since going live, several 'piggy back' applications have been required to make the Programming side better fit actual work procedures. This part of the system has proven adequate but will be rewritten in 2004 to make it easier to use. The original development side module was rejected by the users and so had to be rewritten in 2003. The second version has proven much better, is heavily used, and is interconnected with Iowa DOT project data systems. Now that the system is in operation, it will be maintained and operated by the ICEA Service Bureau as an ongoing service function.
Resumo:
This document describes planned investments in Iowa’s multimodal transportation system including aviation, transit, railroads, trails, and highways. This five-year program documents $3.2 billion of highway and bridge construction projects on the primary road system using federal and state funding. Of that funding, a little over $500 million is available due to the passage of Senate File 257 in February 2015. As required by Senate File 257, this program includes a list of the critical highway and bridge projects funded with the additional revenue. As with other recent programs, there continues to be uncertainty in federal funding for roads and bridges. The most recent federal authorization, Moving Ahead for Progress in the 21st Century (MAP-21), will expire July 31, 2015. At the same time that MAP-21 expires and absent Congressional action, the federal Highway Trust Fund will no longer be able to provide funding at current levels. This could result in reduced federal funding reimbursement for projects already underway and/or full elimination of federal highway funding for new projects in federal fiscal year 2016. These two issues provide funding uncertainty with this program in fiscal year 2016 and beyond.
Resumo:
For the past several year Kossuth County has had a scheduled maintenance program of bituminous seal coating. This program has been used to maintain the 467 miles of asphaltic concrete surfaced roads in Kossuth County. Since most of the experience that Kossuth County had in seal coating was with cutback asphalt, it was decided to include the use of emulsified asphalt in Kossuth County's 1980 seal coat program. Federal Demonstration Project Funds were requested from the Federal Highway Administration to study the use of emulsified asphalt and funding was granted under Demonstration Project No. 55,:Asphalt Emulsions for Highway Construction." Items studied were design and construction procedure cost of alternate material, energy consumption and environmental considerations. A construction contract was awarded to Everds Brothers, Inc. of Algona, Iowa, on July 1, 1980. There were four bidders on the 54.5 miles of seal coating that was let. A map showing the location of the seal coating projects is shown in Appendix A, and a copy of the contract is shown in Appendix B. The contractor started the project on July 11, 1980 and completed the project on August 1, 1980. Construction inspection and follow-up inspections of the project were conducted by personnel of the Kossuth County Engineer's Office and testing of the materials, friction testing and road rater testing were conducted by the Material's Department of the Iowa Department of Transportation.
Resumo:
In 1982 the Iowa DOT allowed a successful bidder the option of submitting materials and proportions using fly ash to produce a portland cement concrete (PCC) paving mixture to meet a specified compressive strength. The contractor, Irving F. Jensen, received approval for the use of a concrete mixture utilizing 500 lbs. of portland cement and 88 lbs. of fly ash as a replacement of 88 lbs. of portland cement. The PCC mixture was utilized on the Muscatine County US 61 relocation bypass paved as project F-61-4(32)--20-70. A Class "C" fly ash obtained from the Chillicothe electric generating plant approximately 100 miles away was used in the project. This use of fly ash in lieu of portland cement resulted in a cost savings of $64,500 and an energy savings of approximately 16 billion BTU. The compressive strength of this PCC mixture option was very comparable to concrete mixtures produced without the use of fly ash. The pavement has been performing very well. The substitution of fly ash for 15% of the cement has been allowed as a contractor's option since 1984. Due to the cost savings, it has been used in almost all Iowa PCC paving since that time.
Resumo:
The report describes the state of the art video equipment used and experiences gained from the 6,800 mile field test. The first objective of this project was to determine if laser disc equipment could capture and store usable roadway images while operating in a mobile environment. The second objective was to evaluate methods of using optical disc storage and retrieval features to enhance highway planning and design function. Several highway departments have attempted to use video technology to replace the traditional 16 and 35 mm film format used in photologging. These attempts have met with limited success because of the distortion caused by video technology not being capable of dealing with highway speeds. The distortion has caused many highway signs to be unreadable and, therefore, clients have labeled the technology unusable. Two methods of using optical laser disc storage and retrieval have been successfully demonstrated by Wisconsin and Connecticut Departments of Transportation. Each method provides instantaneous retrieval and linking of images with other information. However, both methods gather the images using 35 mm film techniques. The 35 mm film image is then transferred to laser disc. Eliminating the film conversion to laser disc has potential for saving $4 to $5 per logging mile. In addition to a cost savings, the image would be available immediately as opposed to delays caused by film developing and transferring to laser disc. In June and November of 1986 Iowa DOT staff and cooperating equipment suppliers demonstrated the concept of direct image capture. The results from these tests were promising and an FHWA Demonstration program established. Since 1986 technology advancements have been incorporated into the design that further improve the image quality originally demonstrated.
Resumo:
This report presents an overview of where the computerized highway information system is now, and its status as a planning and programming tool for state highway agencies. A computerized highway information system is simply a computer linked system which can be used by many divisions of a transportation agency to obtain information to meet data reporting, analyses or other informational needs. The description of the highway information system includes: current use and status, applications, organization and system development, benefits and problems.
Resumo:
Major highway concrete pavements in Iowa have exhibited premature deterioration attributed to effects of ettringite formation, alkali-silica expansive reactions, and to frost attack, or some combination of them. These pavements were constructed in the mid- 1980s as non-reinforced, dual-lane, roads ranging in thickness between 200 mm and 300 mm, with skewed joints reinforced with dowels. Deterioration was initially recognized with a darkening of joint regions, which occurred for some pavements as soon as four years after construction. Pavement condition ranges from severe damage to none, and there appeared to be no unequivocal materials or processing variables correlated with failure. Based upon visual examinations, petrographic evaluation, and application of materials models, the deterioration of concrete highway pavements in Iowa appear related to a freeze-thaw failure of the coarse aggregate and the mortar. Crack patterns sub-parallel to the concrete surface transecting the mortar fraction and the coarse aggregate are indicative of freeze-thaw damage of both the mortar and aggregate. The entrained air void system was marginal to substandard, and filling of some of the finer-sized voids by ettringite appears to have further degraded the air void system. The formation of secondary ettringite within the entrained air voids probably reflects a relatively high degree of concrete saturation causing the smaller voids to be filled with pore solution when the concrete freezes. Alkali-silica reaction (ASR) affects some quartz and shale in the fine aggregate, but is not considered to be a significant cause of the deterioration. Delayed ettringite formation was not deemed likely as no evidence of a uniform paste expansion was observed. The lack of field-observed expansion is also evidence against the ASR and DEF modes of deterioration. The utilization of fly ash does not appear to have affected the deterioration as all pavements with or without fly ash exhibiting substantial damage also exhibit significant filling of the entrained air void system, and specimens containing fly ash from sound pavements do not have significant filling. The influence of the mixture design, mixing, and placing must be evaluated with respect to development of an adequate entrained air void system, concrete homogeneity, longterm drying shrinkage, and microcracking. A high-sand mix may have contributed to the difficult mixture characteristics noted upon placement and exacerbate concrete heterogeneity problems, difficulty in developing an adequate entrained air void system, poor consolidation potential, and increased drying shrinkage and cracking. Finally, the availability of moisture must also be considered, as the secondary precipitation of ettringite in entrained air voids indicates they were at least partially filled with pore solution at times. Water availability at the base of the slabs, in joints, and cracks may have provided a means for absorbing water to a point of critical saturation.
Resumo:
Reconstruction of bridge approach slabs which have failed due to a loss of support from embankment fill consolidation or erosion can be particularly challenging in urban areas where lane closures must be minimized. Precast prestressed concrete pavement is a potential solution for rapid bridge approach slab reconstruction which uses prefabricated pavement panels that can be installed and opened to traffic quickly. To evaluate this solution, the Iowa Department of Transportation constructed a precast prestressed approach slab demonstration project on Highway 60 near Sheldon, Iowa in August/September 2006. Two approach slabs at either end of a new bridge were constructed using precast prestressed concrete panels. This report documents the successful development, design, and construction of the precast prestressed concrete bridge approach slabs on Highway 60. The report discusses the challenges and issues that were faced during the project and presents recommendations for future implementation of this innovative construction technique.
Resumo:
Seasonal variations in ground temperature and moisture content influence the load carrying capacity of pavement subgrade layers. To improve pavement performance, pavement design guidelines require knowledge of environmental factors and subgrade stiffness relationships. As part of this study, in-ground instrumentation was installed in the pavement foundation layers of a newly constructed section along US Highway 20 near Fort Dodge, Iowa, to monitor the seasonal variations in temperature, frost depth, groundwater levels, and moisture regime. Dynamic cone penetrometer (DCP), nuclear gauge, and Clegg hammer tests were performed at 64 test points in a 6-ft x 6-ft grid pattern to characterize the subgrade stiffness properties (i.e., resilient modulus) prior to paving. The purpose of this paper is to present the field instrumentation results and the observed changes in soil properties due to seasonal environmental effects.