29 resultados para cost-informed process improvement
Resumo:
This report describes the continuation of the development of performance measures for the Iowa Department of Transportation (DOT) Offices of Construction. Those offices are responsible for administering transportation construction projects for the Iowa DOT. Researchers worked closely with the Benchmark Steering Team which was formed during Phase I of this project and is composed of representatives of the Offices of Construction. The research team conducted a second survey of Offices of Construction personnel, interviewed numerous members of the Offices and continued to work to improve the eight key processes identified during Phase I of this research. The eight key processes include Inspection of Work, Resolution of Technical Issues, Documentation of Work Progress and Pay Quantities, Employee Training and Development, Continuous Feedback for Improved Contract Documents, Provide Safe Traffic Control, External/Public Communication, and Providing Pre-Letting Information. Three to four measurements were specified for each key process. Many of these measurements required opinion surveys of employees, contractors, and others. During Phase II, researchers concentrated on conducting surveys, interviewing respondents to improve future surveys, and facilitating Benchmark Steering Team monthly meetings. Much effort was placed on using the information collected during the first year's research to improve the effectiveness and efficiency of the Offices of Construction. The results from Process Improvement Teams that studied Traffic Control and Resolution of Technical Issues were used to improve operations.
Resumo:
This is the final Report to the Iowa DOT Offices of Construction and the Highway Division for the calendar year 1999 research project entitled - Continuation of Benchmarking Project: Phase IV. This project continues efforts started in 1995 with the development of a performance measurement system. The performance measurements were used to identify areas that required improvement and process improvement teams (PITs) were launched to make recommendations for improvement. This report provides a brief historical background, documents Benchmark Steering Team Activities, describes measurement activities including the employee survey and collection of non-survey data. Then a retrospective of past PIT activities is given, which sets the stage for the substantial increase in PIT activity that occurred during the winter of 1998/9. Finally, the report closes with suggestions for future directions in Benchmarking Activity.
Resumo:
Stylized facts regarding the industrial process include emphases on obtaining information about and control over the quality of raw materials. We provide a model that establishes conditions under which informed control involves ensuring uniformity in inputs and increased uniformity encourages more extensive processing. We show when the Boltzmann-Shannon entropy statistic is an appropriate measure of uniformity.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.
Resumo:
Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 USC. The STIP is generated to provide the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s (Iowa DOT) authority to act concerning matters related to transportation, federal-aid expenditures and approvals of Metropolitan Planning Organizations’ (MPOs) Transportation Improvements Programs (TIPs) have been provided in past STIP’s and can be provided again upon request. The projects identified within the 2010-2013 STIP are divided into two groups. Projects proposed for funding from FHWA programs are shown first. FTA programs follow. Maps are included that identify locations of Iowa DOT District Planners, Metropolitan Planning Organizations (MPOs), Regional Planning affiliations (RPAs), and transit systems.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.
Resumo:
The Quadrennial Needs Study was developed to assist in the identification of highway needs and the distribution of road funds in Iowa among the various highway entities. During the period 1978 to 1990, the process has seen large shifts in needs and associated funding distribution in individual counties with no apparent reasons. This study investigated the reasons for such shifts. The study identified program inputs that can result in major shifts in needs either up or down from minor changes in the input values. The areas of concern were identified as the condition ratings for roads and structures, traffic volume and mix counts, and the assignment of construction cost areas. Eight counties exhibiting the large shifts (greater than 30%) in needs over time were used to test the sensitivity of the variables. A ninth county was used as the base line for the study. Recommendations are identified for improvements in the process of data collection in the areas of road and structure condition--rating, traffic, and in the assignment of construction cost areas. Advice is also offered in how to account for changes in jurisdiction between successive studies. Maintenance cost area assignment and levels of maintenance service are identified as requiring additional detailed research.
Resumo:
This Tier 2 Environmental Assessment (EA) presents the results of studies and analyses conducted to determine the potential impacts of proposed improvements in Segment 3 of the Council Bluffs Interstate System (CBIS) in the Council Bluffs metropolitan area. This document is tiered to the Tier 1 Draft and Final Environmental Impact Statements (EIS) that evaluated impacts of the overall CBIS Improvements Project, which includes five segments of independent utility1 This EA on Segment 3 of the Project is divided into the following sections: and encompasses 18 mainline miles of Interstate and 14 interchanges along Interstate 80 (I-80), Interstate 29 (I-29), and Interstate 480 (I-480). More information about the tiering process is found below under Project Background. • Section 1 provides background information on the Project and discusses the relationship between the earlier Tier 1 EIS and this Tier 2 EA. It also discusses the proposed action and the area studied, the purpose of the Project, and the need for the Project based on transportation problems that currently exist or are expected in the future. • Section 2, Alternatives, identifies the range of alternatives considered for Segment 3 to address the transportation problems identified in Section 1. It also identifies the alternatives retained for further study in this EA and the preferred Segment 3 alternative. • Section 3, Affected Environment and Environmental Consequences, describes the general environment for each resource affected by the proposed improvements. It also describes the potential environmental impacts of the Segment 3 Project and methods to avoid, minimize, and mitigate impacts. • Section 4, Disposition, lists the agencies and organizations that will receive copies of this EA and the locations at which this EA will be available for public review. • Section 5, Comments and Coordination, summarizes the agency coordination and public involvement efforts in conjunction with the Segment 3 Project. • Section 6, Conclusion and Recommendation, summarizes resource impacts. • Section 7, References, lists the sources cited in this EA. For Segment 3, the Federal Highway Administration (FHWA) and Iowa Department of Transportation (Iowa DOT) determined that an EA is the appropriate level of Tier 2 study to comply with the National Environmental Policy Act (NEPA) requirements. The primary purpose of an EA is to clearly establish the significance of a project’s environmental impacts. That analysis is included in this document.
Resumo:
The purpose of this project was to investigate the potential for collecting and using data from mobile terrestrial laser scanning (MTLS) technology that would reduce the need for traditional survey methods for the development of highway improvement projects at the Iowa Department of Transportation (Iowa DOT). The primary interest in investigating mobile scanning technology is to minimize the exposure of field surveyors to dangerous high volume traffic situations. Issues investigated were cost, timeframe, accuracy, contracting specifications, data capture extents, data extraction capabilities and data storage issues associated with mobile scanning. The project area selected for evaluation was the I-35/IA 92 interchange in Warren County, Iowa. This project covers approximately one mile of I-35, one mile of IA 92, 4 interchange ramps, and bridges within these limits. Delivered LAS and image files for this project totaled almost 31GB. There is nearly a 6-fold increase in the size of the scan data after post-processing. Camera data, when enabled, produced approximately 900MB of imagery data per mile using a 2- camera, 5 megapixel system. A comparison was done between 1823 points on the pavement that were surveyed by Iowa DOT staff using a total station and the same points generated through the MTLS process. The data acquired through the MTLS and data processing met the Iowa DOT specifications for engineering survey. A list of benefits and challenges is included in the detailed report. With the success of this project, it is anticipate[d] that additional projects will be scanned for the Iowa DOT for use in the development of highway improvement projects.
Resumo:
Quality granular materials suitable for building all-weather roads are not uniformly distributed throughout the state of Iowa. For this reason the Iowa Highway Research Board has sponsored a number of research programs for the purpose of developing new and effective methods for making use of whatever materials are locally available. This need is ever more pressing today due to the decreasing availability of road funds and quality materials, and the increasing costs of energy and all types of binder materials. In the 1950s, Professor L. H. Csanyi of Iowa State University had demonstrated both in the laboratory and in the field, in Iowa and in a number of foreign countries, the effectiveness of preparing low cost mixes by stabilizing ungraded local aggregates such as gravel, sand and loess with asphalt cements using the foamed asphalt process. In this process controlled foam was produced by introducing saturated steam at about 40 psi into heated asphalt cement at about 25 psi through a specially designed and properly adjusted nozzle. The reduced viscosity and the increased volume and surface energy in the foamed asphalt allowed intimate coating and mixing of cold, wet aggregates or soils. Through the use of asphalt cements in a foamed state, materials normally considered unsuitable could be used in the preparation of mixes for stabilized bases and surfaces for low traffic road construction. By attaching the desired number of foam nozzles, the foamed asphalt can be used in conjunction with any type of mixing plant, either stationary or mobile, batch or continuous, central plant or in-place soil stabilization.
Resumo:
A combined study of dust control and low-cost surface improvements of soil and aggregate materials for immediate (and intermediate) use as a treated surface course is being conducted in three concurrent phases: (1) laboratory screening of various additives thought to have potential for long-lasting dust palliation, soil-additive strength, durability, and additive retention potential; (2) test road construction, using those additives from the screening studies that indicate promise for performance and serviceability; and (3) observation and tests of constructed sections for evaluation of the additive's contribution to performance and serviceability as well as relationship to initial costs. A brief review is presented of the problem, some methods of measuring it, previously adopted approaches to it, project field tests and a portion of the results thus far, and portions of the laboratory work accomplished in the screening studies.
Resumo:
This report is one of two products for this project with the other being a design guide. This report describes test results and comparative analysis from 16 different portland cement concrete (PCC) pavement sites on local city and county roads in Iowa. At each site the surface conditions of the pavement (i.e., crack survey) and foundation layer strength, stiffness, and hydraulic conductivity properties were documented. The field test results were used to calculate in situ parameters used in pavement design per SUDAS and AASHTO (1993) design methodologies. Overall, the results of this study demonstrate how in situ and lab testing can be used to assess the support conditions and design values for pavement foundation layers and how the measurements compare to the assumed design values. The measurements show that in Iowa, a wide range of pavement conditions and foundation layer support values exist. The calculated design input values for the test sites (modulus of subgrade reaction, coefficient of drainage, and loss of support) were found to be different than typically assumed. This finding was true for the full range of materials tested. The findings of this study support the recommendation to incorporate field testing as part of the process to field verify pavement design values and to consider the foundation as a design element in the pavement system. Recommendations are provided in the form of a simple matrix for alternative foundation treatment options if the existing foundation materials do not meet the design intent. The PCI prediction model developed from multi-variate analysis in this study demonstrated a link between pavement foundation conditions and PCI. The model analysis shows that by measuring properties of the pavement foundation, the engineer will be able to predict long term performance with higher reliability than by considering age alone. This prediction can be used as motivation to then control the engineering properties of the pavement foundation for new or re-constructed PCC pavements to achieve some desired level of performance (i.e., PCI) with time.
Resumo:
Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 U.S.C. and 49 U.S.C. The STIP is generated to provide the Federal Highway Administration and Federal Transit Administration a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). The 2015-2018 STIP was approved by FHWA and FTA on September 16, 2014. Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s authority to act concerning matters related to transportation, federal-aid expenditures and approvals of metropolitan planning organizations’ (MPOs), transportation improvements programs (TIPs) have been provided in past STIPs and can be provided again upon request.