23 resultados para Readiness to change
Resumo:
A one page informational sheet about skin cancer and the hat you wear. Sun Safety
Resumo:
Standards for the construction of full-depth patching in portland cement concrete pavement usually require replacement of all deteriorated based materials with crushed stone, up to the bottom of the existing pavement layer. In an effort to reduce the time of patch construction and costs, the Iowa Department of Transportation and the Department of Civil, Construction and Environmental Engineering at Iowa State University studied the use of extra concrete depth as an option for base construction. This report compares the impact of additional concrete patching material depth on rate of strength gain, potential for early opening to traffic, patching costs, and long-term patch performance. This report also compares those characteristics in terms of early setting and standard concrete mixes. The results have the potential to change the method of Portland cement concrete pavement patch construction in Iowa.
Resumo:
The Iowa Department of Corrections faces a growing prison population expected to quickly exceed current capacities. Additionally, nine out of every ten offenders have a history of alcohol or drug problems often both. Research suggests that alcohol and drugs lead to criminal behavior, which lead offenders right back to prison creating a vicious circle and placing a financial and societal burden on the state. However, research also shows that substance abuse treatment can minimize criminal behavior, and offers a way to shut the revolving prison door. Substance abuse programming attempts to change offender thinking patterns and behavior in order to facilitate re-entry back into the community, lessen substance abuse relapse and reduce recidivism. Yet nearly 60% of offenders with identified needs are not treated, and many lacking treatment are high risk. Additionally, the percentage of offenders returning to prison varies significantly from program to program and some programs can not show they have reduced recidivism when compared to offender groups with substance abuse problems and receiving no treatment at all. All of which minimize the effect substance Abuse programming has in curbing prison population growth and reducing crime.
Resumo:
With the quickening pace of crash reporting, the statistical editing of data on a weekly basis, and the ability to provide working databases to users at CTRE/Iowa Traffic Safety Data Service, the University of Iowa, and the Iowa DOT, databases that would be considered incomplete by past standards of static data files are in “public use” even as the dynamic nature of the central DOT database allows changes to be made to both the aggregate of data and to the individual crashes already reported. Moreover, “definitive” analyses of serious crashes will, by their nature, lag seriously behind the preliminary data files. Even after these analyses, the dynamic nature of the mainframe data file means that crash numbers can continue to change long after the incident year. The Iowa DOT, its Office of Driver Services (the “data owner”), and institutional data users/distributors must establish data use, distribution, and labeling protocols to deal with the new, dynamic nature of data. In order to set these protocols, data must be collected concerning the magnitude of difference between database records and crash narratives and diagrams. This study determines the difference between database records and crash narratives for the Iowa Department of Transportation’s Office of Traffic and Safety crash database and the impacts of this difference.
Resumo:
INAPIS Title III Client Service Unit Report - INAPIS (National Aging Program Information System) Service Unit Report collects and reports service/performance data and related program management information to the federal and state government. This report shows the number of older Iowans who receive services and the number of units by service category from Title III funding of the Older Americans Act, the Administration on Aging (AoA) and limited state general fund dollars. Additionally, it shows the number of persons served by individual services and total "unduplicated" client count across all services. In other words, if you add the total number of clients from all services it is higher than the actual number of persons served across all services, because some people need and receive more than one service. (Please note: this is preliminary data, and may be subject to change.)
Resumo:
Family Caregiver Support Program (Title III-E) - The Administration on Aging (AoA) has determined that for Title III-E, the actual family caregiver is the client, not the older person receiving the services. Iowa NAPIS (National Aging Program Information System) collects and reports Title III-E service/performance data and related program management information to the federal and state government in a format like the other Title III services. The major shift in reporting relates to who is the client. As a result, this Title III-E Client/Service Unit Report shows the number of caregivers who receive services and the number of units by service category from the Title III-E funding of the Older Americans Act, the AoA, and limited state general fund dollars. Additionally, it shows the number of persons served by individual services and total "unduplicated" client count across all services. In other words, if you add the total number of clients (caregivers) from all services, it is higher than the actual number of persons served across all services because some people need and receive more than one service. (Please note: this is preliminary data, and may be subject to change.) Title III-E Report YTD 1st Quarter 2007 Title III-E Report YTD 2nd Quarter 2007 Title III-E Report YTD 3rd Quarter 2007 Title III-E Report YTD 4th Quarter 2007
Resumo:
This report shows the number of older low-income and moderate-income Iowans who received service from the Senior Living Program (SLP) and the number of units by service category. Additionally, it shows the number of persons served across services. In other words, if you add the total number of clients from all services it is higher than the actual number of persons served across all services, because some people need and receive more than one service. (Please note: this is preliminary data, and may be subject to change.)
Resumo:
This report shows the number of older low-income and moderate-income Iowans who received service from the Senior Living Program (SLP) and the number of units by service category. Additionally, it shows the number of persons served across services. In other words, if you add the total number of clients from all services it is higher than the actual number of persons served across all services, because some people need and receive more than one service. (Please note: this is preliminary data, and may be subject to change.)
Resumo:
This report shows the number of older low-income and moderate-income Iowans who received service from the Senior Living Program (SLP) and the number of units by service category. Additionally, it shows the number of persons served across services. In other words, if you add the total number of clients from all services it is higher than the actual number of persons served across all services, because some people need and receive more than one service. (Please note: this is preliminary data, and may be subject to change.)
Resumo:
This report shows the number of older low-income and moderate-income Iowans who received service from the Senior Living Program (SLP) and the number of units by service category. Additionally, it shows the number of persons served across services. In other words, if you add the total number of clients from all services it is higher than the actual number of persons served across all services, because some people need and receive more than one service. (Please note: this is preliminary data, and may be subject to change.)
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.
Resumo:
Recognize that plans and proposals are not currently available for the following projects. The letting dates indicated are estimated target dates only and they are subject to change
Resumo:
In Iowa, hundreds of people die and thousands more are injured on our public roadways each year despite decades of efforts to end this su�ffering. Past safety e�efforts have resulted in Iowans bene�fiting from one of the best state roadway systems in the nation. Due to multi-agency e�efforts, Iowa has achieved 90 percent compliance with the state’s mandatory front seat belt use law, earned the nation’s second-lowest percent of alcohol involvement in fatal crashes and made safety gains in system-wide roadway design and operational improvements. Despite these ongoing e�efforts, the state’s annual average of 445 deaths and thousands of life-changing injuries is a tragic toll and an unacceptable public health epidemic in our state. To save more lives on our roadways, Iowans must be challenged to think �differently about lifesaving measures addressing young drivers, safety belts, and motorcycle helmet use and accept innovative designs such as roundabouts. Iowa must apply evidence-based strategies and create a safety culture that motivates all citizens to travel more responsibly. They must demand a lower level of tolerance for Iowa’s roadway deaths and injuries. The Iowa Comprehensive Highway Safety Plan (CHSP) engages diverse safety stakeholders and charts the course for this state, bringing to bear sound science and the power of shared community values to change the culture and achieve a standard of safer travel for our citizens. How many roadway deaths and injuries are too many? Iowa’s highway safety stakeholders believe that, “One death is one too many” and e�effective culture-changing policy and program strategies must be implemented to help reduce this death toll from an annual average of 445 to 400 by the year 2015.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.