80 resultados para Bridges Vibration Measurement


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Vibration-based damage identification (VBDI) techniques have been developed in part to address the problems associated with an aging civil infrastructure. To assess the potential of VBDI as it applies to highway bridges in Iowa, three applications of VBDI techniques were considered in this study: numerical simulation, laboratory structures, and field structures. VBDI techniques were found to be highly capable of locating and quantifying damage in numerical simulations. These same techniques were found to be accurate in locating various types of damage in a laboratory setting with actual structures. Although there is the potential for these techniques to quantify damage in a laboratory setting, the ability of the methods to quantify low-level damage in the laboratory is not robust. When applying these techniques to an actual bridge, it was found that some traditional applications of VBDI methods are capable of describing the global behavior of the structure but are most likely not suited for the identification of typical damage scenarios found in civil infrastructure. Measurement noise, boundary conditions, complications due to substructures and multiple material types, and transducer sensitivity make it very difficult for present VBDI techniques to identify, much less quantify, highly localized damage (such as small cracks and minor changes in thickness). However, while investigating VBDI techniques in the field, it was found that if the frequency-domain response of the structure can be generated from operating traffic load, the structural response can be animated and used to develop a holistic view of the bridge’s response to various automobile loadings. By animating the response of a field bridge, concrete cracking (in the abutment and deck) was correlated with structural motion and problem frequencies (i.e., those that cause significant torsion or tension-compression at beam ends) were identified. Furthermore, a frequency-domain study of operational traffic was used to identify both common and extreme frequencies for a given structure and loading. Common traffic frequencies can be compared to problem frequencies so that cost-effective, preventative solutions (either structural or usage-based) can be developed for a wide range of IDOT bridges. Further work should (1) perfect the process of collecting high-quality operational frequency response data; (2) expand and simplify the process of correlating frequency response animations with damage; and (3) develop efficient, economical, preemptive solutions to common damage types.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This report describes the field application of the tilt sensing method for monitoring movement of the Black Hawk and Karl King Bridges. The study objectives were: to design a data acquisition system for tilt sensing equipment utilizing a telephone telemetry system; to monitor possible movement of the main span pier, Pier No. 2, on the Black Hawk Bridge in Lansing and the possible long-term movement of Pier No. 4 on the Karl King Bridge in Fort Dodge; and to assess the feasibility, reliability, and accuracy of the instrumentation system used in this study.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of this work was to develop a low-cost portable damage detection tool to assess and predict damage areas in highway bridges. The proposed tool was based on standard vibration-based damage identification (VBDI) techniques but was extended to a new approach based on operational traffic load. The methodology was tested using numerical simulations, laboratory experiments, and field testing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report presents the results of potential-scour assessments at 130 bridges and estimates of maximum scour at 10 bridges, in Iowa. All of the bridges evaluated in the study are constructed bridges (not culverts) that are sites of active or discontinued streamflow-gaging stations and peak-stage measurement sites. The period of the study was from October 1991 to September 1994. The potential-scour assessments were made using a potential-scour index developed by the U.S. Geological Survey for a study in Tennessee. Higher values of the index suggest a greater likelihood of scour-related problems occurring at a bridge. The estimates of maximum scour were made using scour equations recommended by the Federal Highway Administration. In this study, the long term aggradation or degradation that occurred during the period of streamflow data collection at each site was evaluated. Although the abutment-scour equation predicted deep scour holes at many of the sites, the only significant abutment scour that was measured was erosion of the embankment at the left abutment at one bridge after a flood.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a nationwide need for a safe, efficient and cost effective transportation system. An essential component of this system is the bridges. Local agencies perhaps have an even greater task than federal and state agencies in maintaining the low volume road (LVR) bridge system due to lack of sufficient resources and funding. The primary focus of this study was to review the various aspects of off-system bridge design, rehabilitation, and replacement. Specifically, a reference report was developed to address common problems in LVR bridges. The source of information included both Iowa and national agencies. This report is intended to be a “user manual” or “tool box” of information, procedures and choices for county engineers to employ in the management of their bridge inventory plus identify areas and problems that need to be researched

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Over the years, bridge engineers have been concerned about the response of prestressed concrete (PC) girder bridges that had been hit by over-height vehicles or vehicle loads. When a bridge is struck by an over-height vehicle or vehicle load, usually the outside and in some instances one of the interior girders are damaged in a bridge. The effect of intermediate diaphragms in providing damage protection to the PC girders of a bridge is not clearly defined. This analytical study focused on the role of intermediate diaphragms in reducing the occurrence of damage in the girders of a PC-girder bridge that has been struck by an over-height vehicle or vehicle load. The study also investigated whether a steel, intermediate diaphragm would essentially provide the same degree of impact protection for PC girders as that provided by a reinforced-concrete diaphragm. This investigation includes the following: a literature search and a survey questionnaire to determine the state-of-the-art in the use and design of intermediate diaphragms in PC-girder bridges. Comparisons were made between the strain and displacement results that were experimentally measured for a large-scale, laboratory, model bridge during previously documented work and those results that were obtained from analyses of the finite-element models that were developed during this research for that bridge. These comparisons were conducted to calibrate the finite element models used in the analyses for this research on intermediate diaphragms. Finite-element models were developed for non-skewed and skewed PC-girder bridges. Each model was analyzed with either a reinforced concrete or two types of steel, intermediate diaphragms that were located at mid-span of an interior span for a PC-girder bridge. The bridge models were analyzed for lateral-impact loads that were applied to the bottom flange of the exterior girders at the diaphragms location and away from the diaphragms location. A comparison was conducted between the strains and displacements induced in the girders for each intermediate-diaphragm type. These results showed that intermediate diaphragms have an effect in reducing impact damage to the PC girders. When the lateral impact-load was applied at the diaphragm location, the reinforced-concrete diaphragms provided more protection for the girders than that provided by the two types of steel diaphragms. The three types of diaphragms provided essentially the same degree of protection to the impacted, PC girder when the lateral-impact load was applied away from the diaphragm location.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The overarching goal of the proposed research was to evaluate the hydraulic performance of twenty two (22) fish-passage structures located in close proximity to bridges in western Iowa and within the HCA (Hungry Canyon Alliance) territory. Such structures include riprap weirs, fish ladders and grouted ripraps. The hydraulic performance of the aforementioned structures was evaluated via detailed field tests for a range of flow conditions relevant to fish migration through bridge waterways in different streams in western Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Method for bridge deck overlays has been very successful in Iowa since its adoption in the 1970s. This method involves removal of deteriorated portions of a bridge deck followed by placement of a layer of den (Type O) Portland Cement Concrete (PCC). The challenge encountered with this type of bridge deck overlay is that the PCC must be mixed on-site, brought to the placement area and placed with specialized equipment. This adds considerably to the cost and limits contractor selection. A previous study (TR-427) showed that a dense PCC with high-range water reducers could successfully be used for bridge deck overlays using conventional equipment and methods. This current study evaluated the use of high performance PCC in place of a dense PCC for work on county bridges. High performance PCC uses fly ash and slag to replace some of the cement in the mix. This results in a workable PCC mix that cures to form a very low permeability overlay.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Headcuts (known also as primary knickpoints) and knickpoints (known also as secondary knickpoints) have been found to contribute to the accelerated riverbed degradation problem in the midwestern United States. Step-changes that occur at the head of channel networks are referred to as headcuts, and those that occur within the confines of channel banks are referred to as knickpoints. The formation of headcuts and knickpoints and their upstream migration have been linked to the over-steepening of stream reaches when the flow plunges to the bed and creates a plunge pool. Secondary flow currents and seepage are believed to be some other parameters contributing to the formation and evolution of headcuts and knickpoints. Ongoing research suggests that headcuts and knickpoints, where they form and migrate, may account for 60% (or more) of the bed erosion in the streams. Based on preliminary observations, there is a strong indication that headcuts and knickpoints can also have a greater influence on flow thalweg alignment (line of deepest flow) for small rivers. A shift in thalweg toward a riverbank or embankment is usually a prime factor contributing to riverbank erosion and scour.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Changes in agriculture operations over the past 35 years are having a dramatic impact on Iowa’s roads and bridges. The average size of an Iowa farm has increased to 352 acres in 2003, compared to 237 acres in 1970. Modern agricultural practices have also produced higher yields per acre, which means more grain to haul to market. In order to increase efficiency, farmers are beginning to use larger capacity wagons hauling more bushels per trip to the elevator, and using much heavier equipment in their farming operations. This trend is stressing Iowa bridges beyond the current capabilities to maintain them.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The measurement of pavement roughness has been the concern of highway engineers for more than 70 years. This roughness is referred to as "riding quality" by the traveling public. Pavement roughness evaluating devices have attempted to place either a graphical or numerical value on the public's riding comfort or discomfort. Early graphical roughness recorders had many different designs. In 1900 an instrument called the "Viagraph" was developed by an Irish engineer.' The "Viagraph" consisted of a twelve foot board with graphical recorder drawn over the pavement. The "Profilometer" built in Illinois in 1922 was much more impressive. ' The instrument's recorder was mounted on a frame supported by 32 bicycle wheels mounted in tandem. Many other variations of profilometers with recorders were built but most were difficult to handle and could not secure uniformly reproducible results. The Bureau of Public Roads (BPR) Road Roughness Indicator b u i l t in 1941 is the most widely used numerical roughness recorder.' The BPR Road Roughness Indicator consists of a trailer unit with carefully selected springs, means of dampening, and balanced wheel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In an attempt to solve the bridge problem faced by many county engineers, this investigation focused on a low cost bridge alternative that consists of using railroad flatcars (RRFC) as the bridge superstructure. The intent of this study was to determine whether these types of bridges are structurally adequate and potentially feasible for use on low volume roads. A questionnaire was sent to the Bridge Committee members of the American Association of State Highway and Transportation Officials (AASHTO) to determine their use of RRFC bridges and to assess the pros and cons of these bridges based on others’ experiences. It was found that these types of bridges are widely used in many states with large rural populations and they are reported to be a viable bridge alternative due to their low cost, quick and easy installation, and low maintenance. A main focus of this investigation was to study an existing RRFC bridge that is located in Tama County, IA. This bridge was analyzed using computer modeling and field load testing. The dimensions of the major structural members of the flatcars in this bridge were measured and their properties calculated and used in an analytical grillage model. The analytical results were compared with those obtained in the field tests, which involved instrumenting the bridge and loading it with a fully loaded rear tandem-axle truck. Both sets of data (experimental and theoretical) show that the Tama County Bridge (TCB) experienced very low strains and deflections when loaded and the RRFCs appeared to be structurally adequate to serve as a bridge superstructure. A calculated load rating of the TCB agrees with this conclusion. Because many different types of flatcars exist, other flatcars were modeled and analyzed. It was very difficult to obtain the structural plans of RRFCs; thus, only two additional flatcars were analyzed. The results of these analyses also yielded very low strains and displacements. Taking into account the experiences of other states, the inspection of several RRFC bridges in Oklahoma, the field test and computer analysis of the TCB, and the computer analysis of two additional flatcars, RRFC bridges appear to provide a safe and feasible bridge alternative for low volume roads.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Following a high wind event on January 24, 2006, at least five people claimed to have seen or felt the superstructure of the Saylorville Reservoir Bridge in central Iowa moving both vertically and laterally. Since that time, the Iowa Department of Transportation (DOT) contracted with the Bridge Engineering Center at Iowa State University to design and install a monitoring system capable of providing notification of the occurrence of subsequent high wind events. In subsequent years, a similar system was installed on the Red Rock Reservoir Bridge to provide the same wind monitoring capabilities and notifications to the Iowa DOT. The objectives of the system development and implementation are to notify personnel when the wind speed reaches a predetermined threshold such that the bridge can be closed for the safety of the public, correlate structural response with wind-induced response, and gather historical wind data at these structures for future assessments. This report describes the two monitoring systems, their components, upgrades, functionality, and limitations, and results from one year of wind data collection at both bridges.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa has the same problem that confronts most states in the United States: many bridges constructed more than 20 years ago either have deteriorated to the point that they are inadequate for original design loads or have been rendered inadequate by changes in design/maintenance standards or design loads. Inadequate bridges require either strengthening or posting for reduced loads. A sizeable number of single span, composite concrete deck - steel I beam bridges in Iowa currently cannot be rated to carry today's design loads. Various methods for strengthening the unsafe bridges have been proposed and some methods have been tried. No method appears to be as economical and promising as strengthening by post-tensioning of the steel beams. At the time this research study was begun, the feasibility of posttensioning existing composite bridges was unknown. As one would expect, the design of a bridge-strengthening scheme utilizing post-tensioning is quite complex. The design involves composite construction stressed in an abnormal manner (possible tension in the deck slab), consideration of different sizes of exterior and interior beams, cover-plated beams already designed for maximum moment at midspan and at plate cut-off points, complex live load distribution, and distribution of post-tensioningforces and moments among the bridge beams. Although information is available on many of these topics, there is miminal information on several of them and no information available on the total design problem. This study, therefore, is an effort to gather some of the missing information, primarily through testing a half-size bridge model and thus determining the feasibility of strengthening composite bridges by post-tensioning. Based on the results of this study, the authors anticipate that a second phase of the study will be undertaken and directed toward strengthening of one or more prototype bridges in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Load Rating: . , :Evaluation of the capacity of a bridge to carry vehicle Inventory Rating: Lbad level which can safely utilize the bridge for an indefinite period of time Operating Rating: Absolute maximum permissible load level for the bridge A load rating states the load in tons which a vehicle can impose on a bridge. Changes in guidelines, standards, and customary uses of bridges require analyses of bridges to be updated and re-evaluated. In this report, twenty-two secondary bridge standards for three types of bridges are rated for the AASHTO HS20-44 vehicle configuration and three typical Iowa legal vehicles