5 resultados para Process-dissociation Framework

em Institute of Public Health in Ireland, Ireland


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Minister of State with responsibility for Primary Care, Alex White TD, today (4 June 2014) concluded a series of meetings with the Irish Medical Organisation (IMO) with the signing of the Framework Agreement between the Minister of Health, the HSE and the Irish Medical Organisation (IMO) setting out a process for engagement concerning the GMS/GP contract and other publicly funded contracts involving General Practitioners (GPs). Download document here

Relevância:

30.00% 30.00%

Publicador:

Resumo:

IPH conducted a rapid HIA appraisal in response to the consultation on DSD Draft Regeneration Framework. The Department for Social Development (DSD) has developed a Draft Regeneration Framework for the North West Quarter Part 2 area of Belfast City Centre, to be known as the Northside Urban Village. The Framework, which outlines the vision for the redevelopment of an inner city area of Belfast was released for public consultation in April 2008. In responding to this consultation, the Institute of Public Health in Ireland (IPH) conducted a Health Impact Assessment (HIA) in order to assess how the proposed Framework might impact on the health of those living in or close to the area as well as the wider Belfast population. The key recommendations which resulted from this process have been presented to the Department. This paper presents an overview of the HIA conducted.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Department of Health (Republic of Ireland) is developing a public health policy, which aims to improve the health of the population and reduce health inequalities by addressing the causes of preventable illnesses.  The aim is to develop a policy for a healthier population for all ages and all sectors in society.  To succeed in developing and implementing a first-class public health policy, in which everyone is encouraged to play a part in protecting and improving the nation’s health, a consultation process was put in place  to ensure wide engagement.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Major emergency management is a key challenge and a priority issue for Government. Clearly, the world in which we live is constantly changing and we need to develop our major emergency management architecture to enable us to deal effectively with the possibility of new risks and threats. In the last few years most European Countries have engaged in review and development of their major emergency or civil protection arrangements. This new Framework for Major Emergency Management moves in line with international trends in this field. Read the document (PDF, 1.9mb) Read the Appendices document (PDF, 1.3mb) A series of additional Framework Guidance Documents designed to support specific areas of major emergency management are currently under development. These documents will initially be posted here as Working Drafts for comment by practitioners involved in the implementation process. The first two guides: A Guide to Risk Assessment in Major Emergency Management and A Guide to Preparing a Major Emergency Plan are now available and further guides will emerge at intervals during the development programme. A Guide to Risk Assessment in Major Emergency Management (PDF, 387kb) A Guide to Preparing a Major Emergency Plan (PDF, 158kb)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Standards for the Assessment of Need process under Part 2 of the Disability Act 2005 In 2004, the Irish Government launched the National Disability Strategy as a framework of positive action measures to support the participation of people with disabilities in Irish society. Two new pieces of legislation â?" the Education for Persons with Special Education Needs Act, 2004 (EPSEN Act 2004 hereafter) and the Disability Act, 2005 â?" form an integral part of this strategy and deal with the special education and/or health needs of persons. Click here to download PDF 279kb The Report on the Consultation Process on Standards for the Assessment of Need process as referred to on page 6 of the Standards document above. Click here to download PDF 369kb