3 resultados para New Lanark Establishment

em Institute of Public Health in Ireland, Ireland


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Minister for Education and Skills outlined his action plan in response to the report of the Advisory Group to the Forum on Patronage and Pluralism in the Primary Sector in June of this year. As part of the action plan the Minister announced that surveys of parental preferences in 44 areas would be undertaken, beginning with five pilot areas in the autumn of 2012. All of the areas to be surveyed under this process fit the following criteria: • Population of between 5,000 and 20,000 inhabitants according to the 2011 census • Population has increased by less than 20% during the inter-censal period 2006 to 2011 Surveys were undertaken on a pilot basis initially in five areas. The surveys were open for a total of three weeks from Monday 22nd October to Friday 9th November 2012 inclusive. This report has been prepared for the New Schools Establishment Group regarding the five pilot surveys and the analysis of the outcomes in each area. The report is comprised of this overall summary document and the separate detailed analysis documents in respect of each of the five areas that were surveyed and which are contained in Appendices 1 to 5. Appendix 6 is a sample of the paper survey which is similar to the on-line survey.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Part One explores the background factors relating to new school establishment, outlines the views received as a result of consultation with the public and the New Schools Advisory Committee (NSAC) and reviews international practice in relation to establishment of new schools. The population of the country experienced an unprecedented increase in the past ten years. Despite the current economic downturn, the effect of this recent population increase is that growth in demand for school places is set to increase over the short to medium term. The overriding objective is to ensure that a school place is available to every child. Part Two explores issues around planning for new schools in the future. It discusses patron selection, the mechanism for identifying the need for a new school and proposals for cost effectiveness, including campus arrangements. A school is of central importance to a local community and therefore the establishment of a new school must be carried out with reference to the overall plan of the local authority for any given area. Guidelines published under Section 28 of the Planning Act entitled “The Provision of Schools and the Planning System” (July 2008) establish a 7 framework for co-operation between the Department and planning authorities to ensure the timely and cost-effective provision of school facilities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In May 2013, the then Minister for Education and Skills announced a wide ranging review of apprenticeship in Ireland. The review was undertaken by an independent Review Group under the chairmanship of Kevin Duffy. The objective of the review was to “examine the future of apprenticeship training in Ireland with a greater focus on a work based learning and a closer alignment of the current needs if the Irish labour market”. The Apprenticeship Review took place in the context of a wider reform programme in education and training, including major structural change in further education and training, the establishment of SOLAS and the development of new national strategies in both further and higher education. Apprenticeship was defined by the Apprenticeship Review Group as a programme of structured education and training, which formally combines and alternates learning in the work place with learning in an education or training centre, (a dual system i.e. a blended combination of on-the-job employer-based training and off-the-job training) whose completion - Prepares the participant for a specific occupation - Leads to an award, recognised under the National Framework of Qualifications from Level 5 to Level 1