11 resultados para project cost engineering

em Consorci de Serveis Universitaris de Catalunya (CSUC), Spain


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Memoria, presentación en vídeo y producto desarrollado del trabajo/proyecto fin de Carrera de la titulación de Ingeniería en Informática, consistente en la realización de un portal web para una pyme ficticia de nombre VendetArte dedicada a la representación de artesanos. El portal web ha sido desarrollado con el gestor de contenidos (CMS) DotNetNuke que trabaja bajo plataforma .NET

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Este proyecto de final de carrera de la titulación de Ingeniería en Informática de Gestión consiste en el diseño y desarrollo de un sistema de control de dispositivos conectados a Raspberry Pi y gestionados desde un dispositivo Android. Se podrán llevar a cabo diferentes acciones como encender, apagar, programar la calefacción y consultar la temperatura actual remotamente desde un dispostivo conectado a la red wifi doméstica o desde de cualquier red que esté conectada a internet.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a new charging scheme for cost distribution along a point-to-multipoint connection when destination nodes are responsible for the cost. The scheme focus on QoS considerations and a complete range of choices is presented. These choices go from a safe scheme for the network operator to a fair scheme to the customer. The in-between cases are also covered. Specific and general problems, like the incidence of users disconnecting dynamically is also discussed. The aim of this scheme is to encourage the users to disperse the resource demand instead of having a large number of direct connections to the source of the data, which would result in a higher than necessary bandwidth use from the source. This would benefit the overall performance of the network. The implementation of this task must balance between the necessity to offer a competitive service and the risk of not recovering such service cost for the network operator. Throughout this paper reference to multicast charging is made without making any reference to any specific category of service. The proposed scheme is also evaluated with the criteria set proposed in the European ATM charging project CANCAN

Relevância:

30.00% 30.00%

Publicador:

Resumo:

I study the optimal project choice when the principal relies on the agent in charge of production for project evaluation. The principal has to choose between a safe project generating a fixed revenue and a risky project generating an uncertain revenue. The agent has private information about the production cost under each project but also about the signal regarding the profitability of the risky project. If the signal favoring the adoption of the risky project is goods news to the agent, integrating production and project evaluation tasks does not generate any loss compared to the benchmark in which the principal herself receives the signal. By contrast, if it is bad news, task integration creates an endogenous reservation utility which is type-dependent and thereby generates countervailing incentives, which can make a bias toward either project optimal. Our results can offer an explanation for why good firms can go bad and a rationale for the separation of day-to-day operating decisions from long-term strategic decisions stressed by Williamson.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Most cases of cost overruns in public procurement are related to important changes in the initial project design. This paper deals with the problem of design specification in public procurement and provides a rationale for design misspecification. We propose a model in which the sponsor decides how much to invest in design specification and awards competitively the project to a contractor. After the project has been awarded the sponsor engages in bilateral renegotiation with the contractor, in order to accommodate changes in the initial project s design that new information makes desirable. When procurement takes place in the presence of horizontally differentiated contractors, the design s specification level is seen to affect the resulting degree of competition. The paper highlights this interaction between market competition and design specification and shows that the sponsor s optimal strategy, when facing an imperfectly competitive market supply, is to underinvest in design specification so as to make significant cost overruns likely. Since no such misspecification occurs in a perfectly competitive market, cost overruns are seen to arise as a consequence of lack of competition in the procurement market.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Most cases of cost overruns in public procurement are related to important changes in theinitial project design. This paper deals with the problem of design speciffication in public procurement and provides a rationale for design misspeciffication. We propose a model in which the sponsor decides how much to invest in design speciffication and awards competitively the project to a contractor. After the project has been awarded the sponsor engages in bilateral renegotiation with the contractor, in order to accommodate changes in the initial project's design that new information makes desirable. When procurement takes place in the presence of horizontally differentiated contractors, the design's speciffication level is seen to affect the resulting degree of competition. The paper highlights this interaction between market competition and design speciffication and shows that the sponsor's optimal strategy, when facing an imperfectly competitive market supply, is to underinvest in design speciffication so as to make signifficant cost overrunslikely. Since no such misspeciffication occurs in a perfectly competitive market, cost overruns are seen to arise as a consequence of lack of competition in the procurement market.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

En aquest projecte s'avaluen els mètodes utilitzats per els mecanismes de detecció de matrícules, i es proposarà un algorisme de detecció de matrícules dissenyat específicament per a sistemes de baix cost com ara els ordinadors actuals. Utilitzarem eines al nostre abast, com càmeres fotogràfiques domèstiques o de mòbil per analitzar el rendiment de l'algorisme

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Work Internship Placements (WIP) is a new and transversal enterprise internships programme, which is focused on quality improvement, academic control and satisfaction of collaborating enterprises. This programme is addressed to the engineering students of the PolytechnicSchool at the University of Girona (UdG) in Spain. The fundamental WIP infrastructure combines a web-based intranet platform, that provides a complete set of WIP tools, with a protocol of procedures and tasks that are observed and followed at all internship stages by every participating agent, i.e. enterprises, students, coaching professors and administrative staff. Our new programme is centered on a broader, more holistic internship placement procedure than the traditional “career and academic goals” approach. The WIP programme has been found to be a valuable asset in addressing enterprise and student needs in the experiential project

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This work extends a previously developed research concerning about the use of local model predictive control in differential driven mobile robots. Hence, experimental results are presented as a way to improve the methodology by considering aspects as trajectory accuracy and time performance. In this sense, the cost function and the prediction horizon are important aspects to be considered. The aim of the present work is to test the control method by measuring trajectory tracking accuracy and time performance. Moreover, strategies for the integration with perception system and path planning are briefly introduced. In this sense, monocular image data can be used to plan safety trajectories by using goal attraction potential fields

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article summarizes the main achievementsof the Multi-Element Transmit andReceive Antennas (METRA) Project, an ISTresearch and technological development project carried out between January 2000 and June 2001 by Universitat Politècnica de Catalunya, the Center for Personkommunikation of Aalborg University, Nokia Networks, Nokia Mobile Phones, and Vodafone Group Research and Development.The main objective of METRA was the performanceevaluation of multi-antenna terminals incombination with adaptive antennas at the basestation in UMTS communication systems. 1 AMIMO channel sounder was developed that providedrealistic multi-antenna channel measurements.Using these measured data, stochasticchannel models were developed and properly validated.These models were also evaluated inorder to estimate their corresponding channelcapacity. Different MIMO configurations andprocessing schemes were developed for both theFDD and TDD modes of UTRA, and their linkperformance was assessed. Performance evaluationwas completed by system simulations thatillustrated the benefits of MIMO configurationsto the network operator. Implementation cost vs.performance improvement was also covered bythe project, including the base station and terminalmanufacturer and network operator viewpoints.Finally, significant standards contributionswere generated by the project and presented to the pertinent 3GPP working groups.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The vast majority of users don’t seek results beyond the second page offered by the search engine, so if a site fails to be among the top 20 (second page), it says that this page does not have good SEO and, therefore, is not visible to the user. The overall objective of this project is to conduct a study to discover the factors that determine (or not) the positioning of websites in a search engine.