28 resultados para Electric power quality
em Consorci de Serveis Universitaris de Catalunya (CSUC), Spain
Resumo:
Monitor a distribution network implies working with a huge amount of data coining from the different elements that interact in the network. This paper presents a visualization tool that simplifies the task of searching the database for useful information applicable to fault management or preventive maintenance of the network
Resumo:
Fault location has been studied deeply for transmission lines due to its importance in power systems. Nowadays the problem of fault location on distribution systems is receiving special attention mainly because of the power quality regulations. In this context, this paper presents an application software developed in Matlabtrade that automatically calculates the location of a fault in a distribution power system, starting from voltages and currents measured at the line terminal and the model of the distribution power system data. The application is based on a N-ary tree structure, which is suitable to be used in this application due to the highly branched and the non- homogeneity nature of the distribution systems, and has been developed for single-phase, two-phase, two-phase-to-ground, and three-phase faults. The implemented application is tested by using fault data in a real electrical distribution power system
Resumo:
This paper aims to survey the techniques and methods described in literature to analyse and characterise voltage sags and the corresponding objectives of these works. The study has been performed from a data mining point of view
Resumo:
The work presented in this paper belongs to the power quality knowledge area and deals with the voltage sags in power transmission and distribution systems. Propagating throughout the power network, voltage sags can cause plenty of problems for domestic and industrial loads that can financially cost a lot. To impose penalties to responsible party and to improve monitoring and mitigation strategies, sags must be located in the power network. With such a worthwhile objective, this paper comes up with a new method for associating a sag waveform with its origin in transmission and distribution networks. It solves this problem through developing hybrid methods which hire multiway principal component analysis (MPCA) as a dimension reduction tool. MPCA reexpresses sag waveforms in a new subspace just in a few scores. We train some well-known classifiers with these scores and exploit them for classification of future sags. The capabilities of the proposed method for dimension reduction and classification are examined using the real data gathered from three substations in Catalonia, Spain. The obtained classification rates certify the goodness and powerfulness of the developed hybrid methods as brand-new tools for sag classification
Resumo:
Es va instal.lar un analitzador CM4000 a la Facultat de Ciències per tal de poder enregistrar en temps real les incidències en la xarxa elèctrica que s'estaven produint (caigudes de tensió i problemes amb els harmònics). El projecte vol monotoritzar la qualitat dels registres d'aquest analitzador que queden enregistrats a la base de dades Power Server. A partir d'aquestes dades es realitza un estudi sobre la freqüència de les incidències, buscant el patró dels dies i hores en què les incidències són màximes
Resumo:
This paper presents and compares two approaches to estimate the origin (upstream or downstream) of voltage sag registered in distribution substations. The first approach is based on the application of a single rule dealing with features extracted from the impedances during the fault whereas the second method exploit the variability of waveforms from an statistical point of view. Both approaches have been tested with voltage sags registered in distribution substations and advantages, drawbacks and comparative results are presented
Resumo:
Three multivariate statistical tools (principal component analysis, factor analysis, analysis discriminant) have been tested to characterize and model the sags registered in distribution substations. Those models use several features to represent the magnitude, duration and unbalanced grade of sags. They have been obtained from voltage and current waveforms. The techniques are tested and compared using 69 registers of sags. The advantages and drawbacks of each technique are listed
Resumo:
This paper focus on the problem of locating single-phase faults in mixed distribution electric systems, with overhead lines and underground cables, using voltage and current measurements at the sending-end and sequence model of the network. Since calculating series impedance for underground cables is not as simple as in the case of overhead lines, the paper proposes a methodology to obtain an estimation of zero-sequence impedance of underground cables starting from previous single-faults occurred in the system, in which an electric arc occurred at the fault location. For this reason, the signal is previously pretreated to eliminate its peaks voltage and the analysis can be done working with a signal as close as a sinus wave as possible
Resumo:
A statistical method for classification of sags their origin downstream or upstream from the recording point is proposed in this work. The goal is to obtain a statistical model using the sag waveforms useful to characterise one type of sags and to discriminate them from the other type. This model is built on the basis of multi-way principal component analysis an later used to project the available registers in a new space with lower dimension. Thus, a case base of diagnosed sags is built in the projection space. Finally classification is done by comparing new sags against the existing in the case base. Similarity is defined in the projection space using a combination of distances to recover the nearest neighbours to the new sag. Finally the method assigns the origin of the new sag according to the origin of their neighbours
Resumo:
Through the history of Electrical Engineering education, vectorial and phasorial diagrams have been used as a fundamental learning tool. At present, computational power has replaced them by long data lists, the result of solving equation systems by means of numerical methods. In this sense, diagrams have been shifted to an academic background and although theoretically explained, they are not used in a practical way within specific examples. This fact may be against the understanding of the complex behavior of the electrical power systems by students. This article proposes a modification of the classical Perrine-Baum diagram construction to allowing both a more practical representation and a better understanding of the behavior of a high-voltage electric line under different levels of load. This modification allows, at the same time, the forecast of the obsolescence of this behavior and line’s loading capacity. Complementary, we evaluate the impact of this tool in the learning process showing comparative undergraduate results during three academic years
Resumo:
La qualitat d'ona en el servei elèctric
Resumo:
Control de la qualitat de la Xarxa elèctrixa
Resumo:
Recoveries after recent earthquakes in the U.S. and Japan have shown that large welfare gains can be achieved by reshaping current emergency plans as incentive-compatible contracts. We apply tools from the mechanisms design literature to show ways to integrate economic incentives into the management of natural disasters and discuss issues related to the application to seismic event recovery. The focus is on restoring lifeline services such as the water, gas, transportation, and electric power networks. We put forward decisional procedures that an uninformed planner could employ to set repair priorities and help to coordinate lifeline firms in the post-earthquake reconstruction.
Resumo:
L’objecte del projecte és dissenyar una central productora d’energia elèctrica a través d’una turbina de vapor i un generador acoblat a aquesta, mitjançant concentradors d’energia solar cilindro-parabòlics. Aquests concentradors captaran la radiació directa del sol per concentrar-la al focus de la paràbola, on s’hi col·locarà un receptor per l’interior del qual hi passarà un fluid que s’escalfarà gràcies a aquests raigs concentrats. En el projecte s’ha dissenyat la instal·lació i estudiat la radiació disponible a la zona, s’ha realitzat un estudi de la viabilitat de la instal·lació necessària i del cost econòmic d’una central d’energia termoelèctrica fictícia a la zona de Tarragona
Resumo:
L’objecte d’aquest treball ha estat avaluar el consum d’energia elèctrica de la industria BECSA, situada al municipi de Palol de Revardit i dedicada a l’elaboració de pernil curat preparat per a ser llescat industrialment. En primer lloc es va estudiar el procés productiu de la indústria i la maquinària, per tal de determinar les potencies activa i reactiva de cadascuna de les màquines. Amb les potències per una banda, i l’estudi dels temps de treball de les màquines per l’altra, es van determinar els consums d’energia activa i reactiva que suposava el procés. A partir de l’anàlisi de les dades obtingudes, les factures elèctriques, les tarifes i complements per destinació horària, es van proposar una sèrie de millores per a poder disminuir els costos del consum d’energia elèctrica de la indústria