2 resultados para genetic progress
em Galway Mayo Institute of Technology, Ireland
Resumo:
The brown crab (Cancer pagurus) fishery in Ireland is one of the most important financially and socio-economically, with the species worth approximately €15m per year in the first half of the decade. Only mackerel (Scomber scombrus) and Dublin Bay prawn (Nephrops norvegicus) are of greater value. Despite this, very little research has been conducted to describe the stock structure of brown crab on a national scale. In this study a country-wide assessment of genetic population structure was carried out. Sampling was conducted from commercial fishing boats from 11/06 to 04/08 at seven sample sites representing the central Irish brown crab fisheries, with one sample site from the UK also included in the study. Six microsatellite markers, specifically developed for brown crab, were used to assess genetic diversity and estimate population differentiation parameters. Significant genetic structuring was found using F-statistics (Fst = 0.007) and exact tests, but not with Bayesian methods. Samples from the UK and Wexford were found to be genetically distinct from all other populations. Three northern populations from Malm Head and Stanton Bank were genetically similar with Fst estimates suggesting connectivity between them. Also, Stanton Bank, again on the basis of Fst estimates, appeared to be connected to populations down the west coast of Ireland, as far south as Kerry. Two Galway samples, one inside and one outside of Galway Bay, were genetically differentiated despite their close geographic proximity. It is hypothesised that a persistent northerly summer current could transport pelagic larvae from populations along the southwest and west coasts of Ireland towards Stanton Bank in the North, resulting in the apparent connectivity observed in this study.
Resumo:
The threats posed by climate change are placing governments under increasing pressure to meet electricity demand from low carbon sources. Wind energy has been has been identified as one of the main technologies to help in meeting these demands. The public in general favour wind energy yet proposed targets for generation capacity lag behind proposed goals. The N IM B Y phenomenon has been suggested as one of the reasons why we are behind our wind generation capacity targets. It is a common mistake to take general support for granted and expect the public to support developments when confronted with them in their local area. In many cases it is not unheard of that governing bodies whether social, political, regulatory, environmental, or cultural can overrule general public support and halt developments. Motives to halt developments will vary depending on the institutional body involved. The problem with the term N IM B Y is that it is too basic a term to describe the broad spectrum of complex motives that various institutions including the public may have against a development. This research focuses on a case study where the developer had major problems with the local county council and its wind energy policies when he was erecting a wind turbine despite having gained planning permission. A survey questionnaire was also used as part o f the research to seek the perception a rural community had on wind energy. The research findings and results are discussed with respect to the literature review highlighting a general public support for wind energy and the influence institutional bodies have over the progress of developments.