2 resultados para duration of rally
em Galway Mayo Institute of Technology, Ireland
Resumo:
The recruitment of 0-group plaice to sandy beach nursery grounds in Galway Bay was examined, using a Riley push-net, from February to June in 2005 and 2006. Sampling was carried out every two weeks on spring tides. Three beaches were sampled, Ballyloughan, Silverstrand and Glann na Ri. Archived 0-group plaice, for Ballyloughan and Silverstrand, from 2004, were processed. Results were compared to findings from a previous study carried out in 2002 and 2003 (Allen 2004). Otolith microstructure analysis was used to determine hatching dates, larval duration, settlement dates, post-larval age and daily growth rates of 0-group plaice in April and May 2005. Results were compared to a previous study (Allen 2004). Hatching dates in Galway Bay ranged from late January to early April in 2005. No significant difference in hatching dates was observed between years or between beaches sampled. Larval duration of 0-group plaice in Galway Bay ranged from 21 to 45 days for fish sampled in April and May 2005. No significant difference was observed in larval age between beaches sampled in Galway Bay or between years in April 2003 and 2005. A significant difference was observed between larval age and years in May 2003 and 2005, however no significant difference was observed between beaches. Settlement timing was calculated using push-net data and otolith microstructure analysis. Settlement of 0-group plaice in Galway Bay generally started in early March and finished in May. Settlement patterns, calculated using otolith microstructure analysis, in 2003 and 2005, were not significantly different to one another. There was also no difference in settlement patterns between the beaches sampled. Results from the present study showed no spatial difference in the pelagic life cycle stages of fish caught in April and May 2003 and 2005.
Resumo:
The main objective of this thesis on flooding was to produce a detailed report on flooding with specific reference to the Clare River catchment. Past flooding in the Clare River catchment was assessed with specific reference to the November 2009 flood event. A Geographic Information System was used to produce a graphical representation of the spatial distribution of the November 2009 flood. Flood risk is prominent within the Clare River catchment especially in the region of Claregalway. The recent flooding events of November 2009 produced significant fluvial flooding from the Clare River. This resulted in considerable flood damage to property. There were also hidden costs such as the economic impact of the closing of the N17 until floodwater subsided. Land use and channel conditions are traditional factors that have long been recognised for their effect on flooding processes. These factors were examined in the context of the Clare River catchment to determine if they had any significant effect on flood flows. Climate change has become recognised as a factor that may produce more significant and frequent flood events in the future. Many experts feel that climate change will result in an increase in the intensity and duration of rainfall in western Ireland. This would have significant implications for the Clare River catchment, which is already vulnerable to flooding. Flood estimation techniques are a key aspect in understanding and preparing for flood events. This study uses methods based on the statistical analysis of recorded data and methods based on a design rainstorm and rainfall-runoff model to estimate flood flows. These provide a mathematical basis to evaluate the impacts of various factors on flooding and also to generate practical design floods, which can be used in the design of flood relief measures. The final element of the thesis includes the author’s recommendations on how flood risk management techniques can reduce existing flood risk in the Clare River catchment. Future implications to flood risk due to factors such as climate change and poor planning practices are also considered.