2 resultados para course evaluation

em Galway Mayo Institute of Technology, Ireland


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project explored the possibility of harvesting marketable foliage stems in addition to producing timber from plantations of Larix leptolepis, Cupressus macrocarpa ‘Goldcrest’ and Tsuga heterophylla. Data recorded from trial sites included both growth parameters, in the form of height and diameter increments, and production parameters in the form of foliage stem yields. Results varied with species and site type. In many cases, results achieved appear to have been influenced more by the biology of the trees than by the treatments alone. Trials were also established to investigate methods of managing old or over grown Abies procera Christmas tree plantations for forest foliage production. Shelf life testing and market research into the domestic trade of forest foliage were also conducted over the course of the project. Recommendations for managing forest plantations for foliage production as well as a general discussion on the industry are presented in this report.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this study was to evaluate the determinism of the AS-lnterface network and the 3 main families of control systems, which may use it, namely PLC, PC and RTOS. During the course of this study the PROFIBUS and Ethernet field level networks were also considered in order to ensure that they would not introduce unacceptable latencies into the overall control system. This research demonstrated that an incorrectly configured Ethernet network introduces unacceptable variable duration latencies into the control system, thus care must be exercised if the determinism of a control system is not to be compromised. This study introduces a new concept of using statistics and process capability metrics in the form of CPk values, to specify how suitable a control system is for a given control task. The PLC systems, which were tested, demonstrated extremely deterministic responses, but when a large number of iterations were introduced in the user program, the mean control system latency was much too great for an AS-I network. Thus the PLC was found to be unsuitable for an AS-I network if a large, complex user program Is required. The PC systems, which were tested were non-deterministic and had latencies of variable duration. These latencies became extremely exaggerated when a graphing ActiveX was included in the control application. These PC systems also exhibited a non-normal frequency distribution of control system latencies, and as such are unsuitable for implementation with an AS-I network. The RTOS system, which was tested, overcame the problems identified with the PLC systems and produced an extremely deterministic response, even when a large number of iterations were introduced in the user program. The RTOS system, which was tested, is capable of providing a suitable deterministic control system response, even when an extremely large, complex user program is required.