2 resultados para VASE-SHAPED MICROFOSSILS

em Galway Mayo Institute of Technology, Ireland


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Surgeons may use a number of cutting instruments such as osteotomes and chisels to cut bone during an operative procedure. The initial loading of cortical bone during the cutting process results in the formation of microcracks in the vicinity of the cutting zone with main crack propagation to failure occuring with continued loading. When a material cracks, energy is emitted in the form of Acoustic Emission (AE) signals that spread in all directions, therefore, AE transducers can be used to monitor the occurrence and development of microcracking and crack propagation in cortical bone. In this research, number of AE signals (hits) and related parameters including amplitude, duration and absolute energy (abs-energy) were recorded during the indentation cutting process by a wedge blade on cortical bone specimens. The cutting force was also measured to correlate between load-displacement curves and the output from the AE sensor. The results from experiments show AE signals increase substantially during the loading just prior to fracture between 90% and 100% of maximum fracture load. Furthermore, an amplitude threshold value of 64dB (with approximate abs-energy of 1500 aJ) was established to saparate AE signals associated with microcracking (41 – 64dB) from fracture related signals (65 – 98dB). The results also demonstrated that the complete fracture event which had the highest duration value can be distinguished from other growing macrocracks which did not lead to catastrophic fracture. It was observed that the main crack initiation may be detected by capturing a high amplitude signal at a mean load value of 87% of maximum load and unsteady crack propagation may occur just prior to final fracture event at a mean load value of 96% of maximum load. The author concludes that the AE method is useful in understanding the crack initiation and fracture during the indentation cutting process.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This study explores the perception of risk and the level of risk management implementation in the renewable sector. Risk management is emerging as a key issue due to the loss of confidence amongst banks, causing the attainment of financing to be difficult over the next few years. To attract financing, there is a fundamental requirement to manage risk in a way that minimizes the probability of a negative financial impact on the project. Miller and Lessard (2001) argue that successful projects are not selected but shaped with risk resolution in mind. Rather than evaluating projects at the outset based on projections of the full set of benefits, costs and risks over their lifetime, successful developers start with project ideas that have the potential of becoming viable. Therefore, this study bridges the gap that exists within the renewable sector in relation to risk management literature. This study succeeds through a detailed comparative case study analysis where two developers and two financiers were questioned through qualitative semi-structured interviews on the concept of risk management and its level implementation within the industry. It is believed that the growth in financed renewable energy projects depends on the adequate design and implementation of risk management to mitigate inherent project risks. However, this study revealed that are certain types of developers in existence within the renewable sector, which underestimate the magnitude of risk and view the development of projects as a ‘money racket’. Therefore, it can be concluded that perception of risk will also differ, causing risk and uncertainty to vary from project to project, resulting in investment reluctance to be associated with certain projects. The study originality lies in how it demonstrates to developers the concept of risk management, outlining the simplicity and benefits of implementing it in project development. Finally, this study contributes to the knowledge by enhancing the awareness and understanding of the presence and nature of risk in a RE project environment.