Resumo:
The overall purpose of this study was to develop a thorough inspection regime for onsite wastewater treatment systems, which is practical and could be implemented on all site conditions across the country. With approximately 450,000 onsite wastewater treatment systems in Ireland a risk based methodology is required for site selection. This type of approach will identify the areas with the highest potential risk to human health and the environment and these sites should be inspected first. In order to gain the required knowledge to develop an inspection regime in-depth and extensive research was earned out. The following areas of pertinent interest were examined and reviewed, history of domestic wastewater treatment, relevant wastewater legislation and guidance documents and potential detrimental impacts. Analysis of a questionnaire from a prior study, which assessed the resources available and the types of inspections currently undertaken by Local authorities was carried out. In addition to the analysis of the questionnaire results, interviews were carried out with several experts involved in the area of domestic wastewater treatment. The interview focussed on twelve key questions which were directed towards the expert’s opinions on the vital aspects of developing an inspection regime. The background research, combined with the questionnaire analysis and information from the interviews provided a solid foundation for the development of an inspection regime. Chapter 8 outlines the inspection regime which has been developed for this study. The inspection regime includes a desktop study, consultation with the homeowners, visual site inspection, non-invasive site tests, and inspection of the treatment systems. The general opinion from the interviews carried out, was that a standardised approach for the inspections was necessary. For this reason an inspection form was produced which provides a standard systematic approach for inspectors to follow. This form is displayed in Appendix 3. The development of a risk based methodology for site selection was discussed and a procedure similar in approach to the Geological Survey of Irelands Groundwater Protection Schemes was proposed. The EPA is currently developing a risk based methodology, but it is not available to the general public yet. However, the EPA provided a copy of a paper outlining the key aspects of their methodology. The methodology will use risk maps which take account of the following parameters: housing density, areas with inadequate soil conditions, risk of water pollution through surface and subsurface pathways. Sites identified with having the highest potential risk to human health and the environment shall be inspected first. Based on the research carried out a number of recommendations were made which are outlined in Chapter 10. The principle conclusion was that, if these systems fail to operate satisfactorily, home owners need to understand that these systems dispose of the effluent to the 'ground' and the effluent becomes part of the hydrological cycle; therefore, they are a potential hazard to the environment and human health. It is the owners, their families and their neighbours who will be at most immediate risk.
Resumo:
This study explores the perception of risk and the level of risk management implementation in the renewable sector. Risk management is emerging as a key issue due to the loss of confidence amongst banks, causing the attainment of financing to be difficult over the next few years. To attract financing, there is a fundamental requirement to manage risk in a way that minimizes the probability of a negative financial impact on the project. Miller and Lessard (2001) argue that successful projects are not selected but shaped with risk resolution in mind. Rather than evaluating projects at the outset based on projections of the full set of benefits, costs and risks over their lifetime, successful developers start with project ideas that have the potential of becoming viable. Therefore, this study bridges the gap that exists within the renewable sector in relation to risk management literature. This study succeeds through a detailed comparative case study analysis where two developers and two financiers were questioned through qualitative semi-structured interviews on the concept of risk management and its level implementation within the industry. It is believed that the growth in financed renewable energy projects depends on the adequate design and implementation of risk management to mitigate inherent project risks. However, this study revealed that are certain types of developers in existence within the renewable sector, which underestimate the magnitude of risk and view the development of projects as a ‘money racket’. Therefore, it can be concluded that perception of risk will also differ, causing risk and uncertainty to vary from project to project, resulting in investment reluctance to be associated with certain projects. The study originality lies in how it demonstrates to developers the concept of risk management, outlining the simplicity and benefits of implementing it in project development. Finally, this study contributes to the knowledge by enhancing the awareness and understanding of the presence and nature of risk in a RE project environment.