3 resultados para Red River Settlement.

em Galway Mayo Institute of Technology, Ireland


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The economic value of flounder from shore angling around Ireland was assessed. Flounder catches from shore angling tournaments around Ireland were related to domestic and overseas shore angling expenditure in order to determine an economic value for the species. Temporal trends in flounder angling catches, and specimen (trophy) flounder reports were also investigated. Flounder was found to be the most caught shore angling species in competitions around Ireland constituting roughly one third of the shore angling competition catch although this did vary by area. The total value of flounder from shore angling tourism was estimated to be of the order of €8.4 million. No significant temporal trends in flounder angling catches and specimen reports were found. Thus there is no evidence from the current study for any decline in flounder stocks. The population dynamics of 0-group flounder during the early benthic stage was investigated at estuarine sites in Galway Bay, west of Ireland. Information was analysed from the March to June sampling period over five years (2002 to 2006). Spatial and temporal variations in settlement and population length structure were analysed between beach and river habitats and sites. Settlement of flounder began from late March to early May of each year, most commonly in April. Peak settlement was usually in April or early May. Settlement was recorded earlier than elsewhere, although most commonly was similar to the southern part of the UK and northern France. Settlement was generally later in tidal rivers than on sandy beaches. Abundance of 0-group flounder in Galway Bay did not exhibit significant inter -annual variability. 0-group flounder were observed in dense aggregations of up to 105 m'2, which were patchy in distribution. Highest densities of 0-group flounder were recorded in limnetic and oligohaline areas as compared with the lower densities in polyhaline and to a lesser extent mesohaline areas. Measurements to of salinity allowed the classification of beaches, and tidal river sections near the mouth, into a salinity based scheme for length comparisons. Beaches were classified as polyhaline,the lower section of rivers as mesohaline, and the middle and upper sections as oligohaline. Over the March to June sampling period 0-group flounder utilised different sections at different length ranges and were significantly larger in more upstream sections. During initial settlement in April, 0-group flounder of 8-10 mm (standard length, SL) were present in abundance on polyhaline sandy beaches. By about 10mm (SL), flounder were present in all polyhaline, mesohaline and (oligohaline) sections. 0-group flounder became absent or in insignificant numbers in polyhaline and mesohaline sections in a matter of weeks after first appearance. From April to June, 0-group flounder of 12-30mm (SL) were found in more upstream locations in the oligohaline sections. About one month (May or June) after initial settlement, 0-group flounder became absent from the oligohaline sections. Concurrently, flounder start to reappear in mesohaline and polyhaline areas at approximately 30mm (SL) in June. The results indicate 0-group flounder in the early benthic stage are associated with low salinity areas, but as they grow, this association diminishes. Results strongly suggest that migration of 0-group flounder between habitats takes place during the early benthic phase.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main objective of this thesis on flooding was to produce a detailed report on flooding with specific reference to the Clare River catchment. Past flooding in the Clare River catchment was assessed with specific reference to the November 2009 flood event. A Geographic Information System was used to produce a graphical representation of the spatial distribution of the November 2009 flood. Flood risk is prominent within the Clare River catchment especially in the region of Claregalway. The recent flooding events of November 2009 produced significant fluvial flooding from the Clare River. This resulted in considerable flood damage to property. There were also hidden costs such as the economic impact of the closing of the N17 until floodwater subsided. Land use and channel conditions are traditional factors that have long been recognised for their effect on flooding processes. These factors were examined in the context of the Clare River catchment to determine if they had any significant effect on flood flows. Climate change has become recognised as a factor that may produce more significant and frequent flood events in the future. Many experts feel that climate change will result in an increase in the intensity and duration of rainfall in western Ireland. This would have significant implications for the Clare River catchment, which is already vulnerable to flooding. Flood estimation techniques are a key aspect in understanding and preparing for flood events. This study uses methods based on the statistical analysis of recorded data and methods based on a design rainstorm and rainfall-runoff model to estimate flood flows. These provide a mathematical basis to evaluate the impacts of various factors on flooding and also to generate practical design floods, which can be used in the design of flood relief measures. The final element of the thesis includes the author’s recommendations on how flood risk management techniques can reduce existing flood risk in the Clare River catchment. Future implications to flood risk due to factors such as climate change and poor planning practices are also considered.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Aughinish Alumina Limited (AAL) have an obligation by terms of their Integrated Pollution Control Licence (IPCL) and Planning Permission to establish vegetation on the red mud stack at their plant at Aughinish, Co. Limerick. High pH and high exchangeable sodium percentage are the main known factors limiting the establishment of vegetation on red mud. Gypsum addition has been known to assist in alleviating these problems in other countries. However, there is no experience or published information on red mud rehabilitation under Irish conditions. Red mud with organic and inorganic waste-derived ameliorants as well as selected grassland species were examined under laboratory controlled environment conditions as well as in field plot trials. Also, in order that it would be economically achievable, the research utilised locally available waste products as the organic amendments. Screening trials found that physical constraints severely limit plant germination and growth in red mud. Gypsum addition effectively lowers pH, exchangeable sodium percentage and the availability of A1 and Fe in the mud. A strong relationship between pH, ESP and A1 levels was also found. Gypsum addition increased germination percentages and plant growth for all species investigated. Greenhouse trials demonstrated that organic wastes alone did not greatly improve conditions for plant growth but when used in conjunction with gypsum plant performances for all species investigated was significantly increased. There was a high mortality rate for grasses in non-gypsum treatments. An emerging trend of preferential iron uptake and calcium deficiency in non-gypsum treatments was found at pot screening stage. Species also displayed manganese and magnesium deficiencies.