3 resultados para Performance audit

em Galway Mayo Institute of Technology, Ireland


Relevância:

20.00% 20.00%

Publicador:

Resumo:

All organisations make some contribution to the degradation of the environment through their use of resources and production of waste. Environmental management systems (EMS) standards can provide a tool for companies to systematically reduce their environmental impacts. ISO 14001 was published in 1996. This fitted in with plans of the case study company to take proactive action in this area, even though there was no legislative requirement for them to do so. As EMS implementation was a new area at the time, appropriate methodologies were developed to address different aspects of the implementation, and ISO 14001 was successfully implemented in the company. The results of the primary research included: ♦ Drawing up a methodology for identifying and interpreting the environmental legislation that may have an impact on the organisation and compiling a register of such regulations. ♦ Developing a robust methodology for assessing significant environmental aspects and impacts and applying this to the software company. ♦ Establishing objectives and targets for those aspects identified as significant and implementing environmental management programmes to meet these. ♦ Developing an internal environmental audit procedure based on auditing against the significant aspects. ♦ Integrating areas of the EMS with the existing quality management system in order to avoid duplication of effort. ♦ Undergoing an external assessment process in order to achieve certification of the system. The thesis concludes that the systematic approach defined in ISO 14001 provided a mechanism that the organisation was able to adopt to bring about improvement in its environmental performance. The system was based on a thorough evaluation of the organisation's significant environmental aspects in order to bring about a reduction in its negative impacts. The ISO 14001 requirement for continual improvement is the key driver of the system, and this is what differentiates it from ISO 9000.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objectives of this thesis are three. Firstly, finding and analyzing the differences of performance management system in SMEs in Ireland and China. Secondly, finding the cultural differences between China and Ireland and thirdly, integrating the research outcomes of the above research objectives, and then analyzing the effect of these cultural differences on performance management system in SMEs in China and Ireland.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study analyses the area of construction and demolition waste (C & D W) auditing. The production of C&DW has grown year after year since the Environmental Protection Agency (EPA) first published a report in 1996 which provided data for C&D W quantities for 1995 (EPA, 1996a). The most recent report produced by the EPA is based on data for 2005 (EPA, 2006). This report estimated that the quantity of C&DW produced for that period to be 14 931 486 tonnes. However, this is a ‘data update’ report containing an update on certain waste statistics so any total provided would not be a true reflection of the waste produced for that period. This illustrates that a more construction site-specific form of data is required. The Department of Building and Civil Engineering in the Galway-Mayo Institute of Technology have carried out two recent research projects (Grimes, 2005; Kelly, 2006) in this area, which have produced waste production indicators based on site-specific data. This involved the design and testing of an original auditing tool based on visual characterisation and the application of conversion factors. One of the main recommendations of these studies was to compare this visual characterisation approach with a photogrammetric sorting methodology. This study investigates the application of photogrammetric sorting on a residential construction site in the Galway region. A visual characterisation study is also carried out on the same project to compare the two methodologies and assess the practical application in a construction site environment. Data collected from the waste management contractor on site was also used to provide further evaluation. From this, a set of waste production indicators for new residential construction was produced: □ 50.8 kg/m2 for new residential construction using data provided by the visual characterisation method and the Landfill Levy conversion factors. □ 43 kg/m2 for new residential construction using data provided by the photogrammetric sorting method and the Landfill Levy conversion factors. □ 23.8 kg/m2 for new residential construction using data provided by Waste Management Contractor (WMC). The acquisition of the data from the waste management contractor was a key element for testing of the information produced by the visual characterisation and photogrammetric sorting methods. The actual weight provided by the waste management contractor shows a significant difference between the quantities provided.