2 resultados para Objective element

em Galway Mayo Institute of Technology, Ireland


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main objective of this thesis on flooding was to produce a detailed report on flooding with specific reference to the Clare River catchment. Past flooding in the Clare River catchment was assessed with specific reference to the November 2009 flood event. A Geographic Information System was used to produce a graphical representation of the spatial distribution of the November 2009 flood. Flood risk is prominent within the Clare River catchment especially in the region of Claregalway. The recent flooding events of November 2009 produced significant fluvial flooding from the Clare River. This resulted in considerable flood damage to property. There were also hidden costs such as the economic impact of the closing of the N17 until floodwater subsided. Land use and channel conditions are traditional factors that have long been recognised for their effect on flooding processes. These factors were examined in the context of the Clare River catchment to determine if they had any significant effect on flood flows. Climate change has become recognised as a factor that may produce more significant and frequent flood events in the future. Many experts feel that climate change will result in an increase in the intensity and duration of rainfall in western Ireland. This would have significant implications for the Clare River catchment, which is already vulnerable to flooding. Flood estimation techniques are a key aspect in understanding and preparing for flood events. This study uses methods based on the statistical analysis of recorded data and methods based on a design rainstorm and rainfall-runoff model to estimate flood flows. These provide a mathematical basis to evaluate the impacts of various factors on flooding and also to generate practical design floods, which can be used in the design of flood relief measures. The final element of the thesis includes the author’s recommendations on how flood risk management techniques can reduce existing flood risk in the Clare River catchment. Future implications to flood risk due to factors such as climate change and poor planning practices are also considered.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis is a continuation of the Enterprise-Ireland Research Innovation Fund (RIF) Project entitled’ "Design and Manufacturing of Customised Maxillo-Facial Prostheses" The primary objective of this Internal Research Development Program (IRDP) project was to investigate two fundamental design changes 1 To incorporate the over-denture abutments directly into the implant. 2 To remove the restraining wings by the addition of screws, which affix the. implant to the dense material of the jawbone. The prosthetic was redesigned using the ANSYS Finite Element Analysis software program and analysed to* • Reduce the internal von Mises stress distribution The new prosthetic had a -63.63 % lower von Mises stress distribution when compared with the original prosthetic. • Examine the screw preload effects. A maximum relative displacement of 22 6 * lO^mm between the bone and screw was determined, which is well below the critical threshold of micromotion which prevents osseointegration • Investigate the prosthetic-bone contact interface. Three models of the screw, prosthesis, and bone, were studied. (Axisymmetnc, quarter volume, and full volume), a recommended preload torque of 0 32 Nm was applied to the prosthetic and a maximum von Mises stress of 1.988 MPa was predicted • Study the overdenture removal forces. This analysis could not be completed because the correct plastic multilinear properties of the denture material could not be established The redesigned prosthetic was successfully manufactured on a 3-axis milling machine with an indexing system The prosthetic was examined for dimensional quality and strength The research established the feasibility of the new design and associated manufacturing method.