2 resultados para Long baseline
em Galway Mayo Institute of Technology, Ireland
Resumo:
This Study assessed the development of sludge treatment and reuse policy since the original 1993 National Sludge Strategy Report (Weston-FTA, 1993). A review of the 48 sludge treatment centres, current wastewater treatment systems and current or planned sludge treatment and reuse systems was carried out Sludges from all Regional Sludge Treatment Centres (areas) were characterised through analysis of selected parameters. There have been many changes to the original policy, as a result of boundary reviews, delays in developing sludge management plans, development in technology and changes in tendering policy, most notably a move to design-build-operate (DBO) projects. As a result, there are now 35 designated Hub Centres. Only 5 of the Hub Centres are producing Class A Biosolids. These are Ringsend, Killamey, Carlow, Navan and Osberstown. Ringsend is the only Hub Centre that is fully operational, treating sludge from surrounding regions by Thermal Drying. Killamey is producing Class A Biosolids using Autothermal Thermophilic Aerobic Digestion (ATAD) but is not, as yet, treating imported sludge. The remaining three plants are producing Class A Biosolids using Alkaline Stabilisation. Anaerobic Digestion with post pasteurisation is the most common form of sludge treatment, with 11 Hub Centres proposing to use it. One plant is using ATAD, two intend to use Alkaline Stabilisation, seven have selected Thermal Drying and three have selected Composting. While the remaining plants have not decided which sludge treatment to select, this is because of incomplete Sludge Management Plans and on DBO contracts. Analysis of sludges from the Hub Centres showed that all Irish sewage sludge is safe for agricultural reuse as defined by the Waste Management Regulations {Use of Sewage Sludge in Agriculture) (S.I. 267/2001), providing that a nutrient management plan is taken into consideration and that the soil limits of the 1998 (S.I. 148/1998) Waste Management Regulations are not exceeded.
Resumo:
This research looked at the scientific evidence available on climate change and in particular, projections on sea level rise which ranged from 0.5m to 2m by the end of the century. These projections were then considered in an Irish context. A review of current policy in Ireland revealed that there was no dedicated Government policy on climate change or coastal zone management. In terms of spatial planning policy, it became apparent that there was little or no guidance on climate change either at a national, regional or local level. Therefore, to determine the likely impacts of sea level rise in Ireland based on current spatial planning practice and policy, a scenario-building exercise was carried out for two case study areas in Galway Bay. The two case study areas were: Oranmore, a densely populated town located to the east of Inner Galway Bay; and Tawin Island, a rural dispersed community, located to the south east of Inner Galway Bay. A ‘best’ and ‘worse’ case scenario was envisaged for both areas in terms of sea level rise. In the absence of specific climate change policies it was projected that in the ‘best’ case scenario of 0.5m sea level rise, Tawin Island would suffer serious and adverse impacts while Oranmore was likely to experience slight to moderate impacts. However, in the ‘worse’ case scenario of a 2m sea level rise, it was likely that Tawin Island would be abandoned while many houses, businesses and infrastructure built within the floodplain of Oranmore Bay would be inundated and permanently flooded. In this regard, it was the author’s opinion that a strategic and integrated climate change policy and adaptation plan is vital for the island of Ireland that recognises the importance of integrated land use and spatial planning in terms of mitigation and adaptation to climate change.