2 resultados para ICARUS search and rescue case
em Galway Mayo Institute of Technology, Ireland
Resumo:
This research looked at the scientific evidence available on climate change and in particular, projections on sea level rise which ranged from 0.5m to 2m by the end of the century. These projections were then considered in an Irish context. A review of current policy in Ireland revealed that there was no dedicated Government policy on climate change or coastal zone management. In terms of spatial planning policy, it became apparent that there was little or no guidance on climate change either at a national, regional or local level. Therefore, to determine the likely impacts of sea level rise in Ireland based on current spatial planning practice and policy, a scenario-building exercise was carried out for two case study areas in Galway Bay. The two case study areas were: Oranmore, a densely populated town located to the east of Inner Galway Bay; and Tawin Island, a rural dispersed community, located to the south east of Inner Galway Bay. A ‘best’ and ‘worse’ case scenario was envisaged for both areas in terms of sea level rise. In the absence of specific climate change policies it was projected that in the ‘best’ case scenario of 0.5m sea level rise, Tawin Island would suffer serious and adverse impacts while Oranmore was likely to experience slight to moderate impacts. However, in the ‘worse’ case scenario of a 2m sea level rise, it was likely that Tawin Island would be abandoned while many houses, businesses and infrastructure built within the floodplain of Oranmore Bay would be inundated and permanently flooded. In this regard, it was the author’s opinion that a strategic and integrated climate change policy and adaptation plan is vital for the island of Ireland that recognises the importance of integrated land use and spatial planning in terms of mitigation and adaptation to climate change.
Resumo:
In Ireland the average energy cost for a household in 2006 was estimated to be €1,767, an increase of 4% on 2005 figures. With the state o f the current economic climate, home owners are beginning to realise the potential of energy efficient construction methods. The Passive House Standard offers a cost efficient and sustainable construction solution compared to the Traditional Irish construction methods. This report focuses on the Cost comparison between Passive House construction and traditional construction methods. The report also focuses on barriers that are slowing market penetration of the Passive House standard in the Irish Market. It also identifies potential energy savings that passive house occupants would benefit from. The report also highlights professional opinions on the future development o f the Passive House Standard in Ireland. The conclusions of this report are that the Passive House Standard is a more financially suitable construction solution compared to that o f a traditional dwelling complying with the Irish Building Regulations. The report also concludes that the Passive House Standard won’t be introduced as an Irish Building Regulation in the future but that it will have a big impact on future building regulations. The hypothesis o f this report is supported by data obtained from a literature review, qualitative data analysis and a case study. The report recommends that in order for the Passive House Standard to penetrate further into the Irish construction market, various barriers must be rectified. Local manufactures must start producing suitable components that suit the Passive House specification. The Building Energy Rating system must be altered in order for the Passive House to achieve its potential BER rating.