3 resultados para Environmental Management Plan

em Galway Mayo Institute of Technology, Ireland


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction and demolition waste management is becoming increasingly important on construction sites as landfill space in Ireland is rapidly depleting and waste management costs are rising. Due to these factors waste management plans are seen as a good response to minimising waste on site and this thesis aims to investigate how to implement such a plan on a practical case study as well as investigating the legislation regarding construction and demolition waste along with market availability for the reuse of the waste. Main contractor surveys were also carried out in order to gain a better understanding of current attitudes within the industry and these surveys are analysed in chapter five. A survey was also carried out among sub-contractors but this survey has not been used for this thesis as the study is on-going. The primary aim of this thesis is to examine the waste hierarchy opportunities that are available for construction and demolition waste in Ireland and to examine the effects of management strategies on construction and demolition waste reduction at the project level. A partnership was developed with Carey Developments Ltd in Co. Galway and an analysis of their waste management practices was undertaken. The primary case study will be the ‘Taylors Hill’ project in Co. Galway where work commenced in March, 2012. The secondary aim of the thesis is to develop specific waste minimisation strategies for the company and to develop a training tool kit for use on site.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

All organisations make some contribution to the degradation of the environment through their use of resources and production of waste. Environmental management systems (EMS) standards can provide a tool for companies to systematically reduce their environmental impacts. ISO 14001 was published in 1996. This fitted in with plans of the case study company to take proactive action in this area, even though there was no legislative requirement for them to do so. As EMS implementation was a new area at the time, appropriate methodologies were developed to address different aspects of the implementation, and ISO 14001 was successfully implemented in the company. The results of the primary research included: ♦ Drawing up a methodology for identifying and interpreting the environmental legislation that may have an impact on the organisation and compiling a register of such regulations. ♦ Developing a robust methodology for assessing significant environmental aspects and impacts and applying this to the software company. ♦ Establishing objectives and targets for those aspects identified as significant and implementing environmental management programmes to meet these. ♦ Developing an internal environmental audit procedure based on auditing against the significant aspects. ♦ Integrating areas of the EMS with the existing quality management system in order to avoid duplication of effort. ♦ Undergoing an external assessment process in order to achieve certification of the system. The thesis concludes that the systematic approach defined in ISO 14001 provided a mechanism that the organisation was able to adopt to bring about improvement in its environmental performance. The system was based on a thorough evaluation of the organisation's significant environmental aspects in order to bring about a reduction in its negative impacts. The ISO 14001 requirement for continual improvement is the key driver of the system, and this is what differentiates it from ISO 9000.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This Study assessed the development of sludge treatment and reuse policy since the original 1993 National Sludge Strategy Report (Weston-FTA, 1993). A review of the 48 sludge treatment centres, current wastewater treatment systems and current or planned sludge treatment and reuse systems was carried out Sludges from all Regional Sludge Treatment Centres (areas) were characterised through analysis of selected parameters. There have been many changes to the original policy, as a result of boundary reviews, delays in developing sludge management plans, development in technology and changes in tendering policy, most notably a move to design-build-operate (DBO) projects. As a result, there are now 35 designated Hub Centres. Only 5 of the Hub Centres are producing Class A Biosolids. These are Ringsend, Killamey, Carlow, Navan and Osberstown. Ringsend is the only Hub Centre that is fully operational, treating sludge from surrounding regions by Thermal Drying. Killamey is producing Class A Biosolids using Autothermal Thermophilic Aerobic Digestion (ATAD) but is not, as yet, treating imported sludge. The remaining three plants are producing Class A Biosolids using Alkaline Stabilisation. Anaerobic Digestion with post pasteurisation is the most common form of sludge treatment, with 11 Hub Centres proposing to use it. One plant is using ATAD, two intend to use Alkaline Stabilisation, seven have selected Thermal Drying and three have selected Composting. While the remaining plants have not decided which sludge treatment to select, this is because of incomplete Sludge Management Plans and on DBO contracts. Analysis of sludges from the Hub Centres showed that all Irish sewage sludge is safe for agricultural reuse as defined by the Waste Management Regulations {Use of Sewage Sludge in Agriculture) (S.I. 267/2001), providing that a nutrient management plan is taken into consideration and that the soil limits of the 1998 (S.I. 148/1998) Waste Management Regulations are not exceeded.